• Title/Summary/Keyword: pressurized facilities

Search Result 36, Processing Time 0.027 seconds

Risk-Based Inspection(RBI) Technology for Safety Management of the Pressurized Facilities (압력설비의 안전관리를 위한 위험기반검사(RBI) 기술)

  • Lee, Hern-Chang;Han, Seong-Hwan;Cho, Ji-Hoon;Kim, Tae-Ok
    • Journal of the Korean Institute of Gas
    • /
    • v.15 no.4
    • /
    • pp.1-6
    • /
    • 2011
  • Risk-based inspection (RBI) is a inspection technique suggesting inspection plan, such as inspection interval and inspection method, of the pressurized facilities based on its risk in the petrochemical, refinery and gas industries. Therefore, we can intensively and cost-effectively maintain, repair and manage the high-risk facilities through RBI technology. This paper reviews RBI technology, such as principle and implemental procedure of RBI, management of risks and facilities and return of investment through RBI, RBI technology at present and its application in domestic industries. In addition, some improvement directions of RBI are also proposed.

Comparative Study on Water Hammer for Pump Station in High Pressurized Pipes in Kuwait

  • Shim, Kyu Dae;Kang, Yong Suk;Choung, Joon Yeon;Abdellatif, Mohamed;Kim, Dong Kyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.265-269
    • /
    • 2017
  • Because of abrupt changes for velocity in water, transient flow is occurred in practical life. To reduce and avoid the high or low pressure of pipe network system, various surge protection facilities are used to prevent the risk in pipe network system. Especially, we focused on study not only preventing positive and negative pressure but also selecting adequate equipment for high pressurized pipelines. Several critical cases were considered by undertaking a steady state hydraulic study and transient dynamic simulation and we suggested that the surge vessel of various surge protection system was recommended to control high and low pressures on pipeline system in perspective.

  • PDF

Construction of High-Pressure Pressurized Liquid Nitrogen Supply Facilities (고압의 가압식 액체질소 공급 설비 구축)

  • Shin, Minkyu;Oh, Jeonghwa;Kim, Seokwon;Ko, Youngsung;Chung, Yonggahp
    • Journal of Aerospace System Engineering
    • /
    • v.14 no.5
    • /
    • pp.26-32
    • /
    • 2020
  • In this study, a facility was constructed to supply liquid nitrogen to simulate combustion instability in a liquid rocket combustor. The pressurization and supply performances were predicted and verified through different experiments. The liquid nitrogen supply system was composed of a pressurized supply system, and a dome regulator was used to adjust the pressure of the pressurant. A cavitation venturi was used to control the mass flow rate of liquid nitrogen. The condition of liquid nitrogen supply was a mass flow rate of 2.55 kg/s and the venturi inlet pressure was above 100 bar. Based on the initial experiment, it was observed that the predicted amount of the pressurant was not sufficiently supplied and the target pressure was not supplied due to a drop in tank pressure. Through the modification of the established facilities, the target mass flow rate was successfully supplied and the cryogenic liquid nitrogen supply facility was verified.

A Legal Alternative for Effective Application of Pressurized Smoke Control System to Provide ′Smoke-free′ Access for Escape Shafts Used in High-Rise Building (국내 고층건물의 피난성능확보를 위한 급기가압방연(제연) 시스템의 제도개선연구)

  • 박형주;김상욱
    • Fire Science and Engineering
    • /
    • v.15 no.4
    • /
    • pp.49-56
    • /
    • 2001
  • There have been the current controversy over effectiveness of the pressurized smoke control systems, which are installed within escape shaft to provide 'smoke-free' access for escaping peoples. Therefore, many effective measures were given in this paper by means of the production of a design guide for various types of escape routes used in domestic buildings. The solutions were established on basis of both an investigating current door closing device application in existing facilities and global standardization for pressurized smoke control system, especially in British Standard. Finally, the design guidance for open door air velocity with introduction to three door protection clauses was presented on the basis of consideration of the safety and economical factor,

  • PDF

A Study on Optimization of Electric Power Facilities Applied Matrix System at 25.8kV GIS (25.8kV급 GIS에 Matrix System을 적용한 전력설비 최적화 연구)

  • Lee, Yang-Mi;Nam, Jae-Woo;Kim, Chul-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.3
    • /
    • pp.507-512
    • /
    • 2017
  • Recently, more electric power facilities have been miniaturized and it is noted that the facilities maintenance will be essential through operation optimization. In this paper we applied and examined the operation optimization of electric power facilities by applying Matrix system which can improve reliability to minimize outage and recover failure rapidly when blackouts happen at 25.8kV Gas Insulated Switchgear(GIS). The fundamental problem for facilities maintenance of GIS can happen due to indeterminable internal state in real time. Matrix optimization organizes action states in all containers which contain pressurized $SF_6$ Gas such as circuit breaker, disconnector switch, bus for utilizing them each area. Then, we connect it with power system to monitor and control internal state remotely in real time, and we can minimize blackout zone or outage. Considering above process, we improved stability of overall facilities.

A Study on the Accident Consequences of High Pressure Pipelines by Applying Reduction Factors (감소인자 적용에 따른 고압가스배관의 사고피해영향에 관한 연구)

  • Lee, Dong Hyuck;Jung, Sang Yong;Ko, Sang Wook;Kim, Min Seop;Ko, Jae Wook
    • Journal of the Korean Institute of Gas
    • /
    • v.16 no.5
    • /
    • pp.1-6
    • /
    • 2012
  • It becomes a more and more common practice to build facilities bigger and more integrated in an effort to optimize the process within limited resources and spaces. As the capacity of facilities increases, so does the flow rate and pressure. This in turn leads to a high consequence of accident. Not only are these facilities vulnerable to leakage because of their high pressure, but also subsequent fire and explosion can be threatening. For these reasons, there is an urgent need to come up with solutions to assess and minimize the damage from an accident. The Quantitative Risk Assessment(QRA) is one of the most efficient ways to solve problems on pressurized pipelines. The QRA can be re-enforced by applying reduction factors. In this study various types of accidents in a pressurized pipeline were evaluated. The damage from accidents were computed, then. Finally the reduction factors were very effective to decrease consequences of high pressure pipeline accidents.

Conceptual Design of Interim Storage Facility for PWR Spent Nuclear Fuel (경수로 사용후핵연료 중간저장시설 개념(안) 수립)

  • Hyun-goo Kang;Chang-min Shin;Sang-Hwan Lee;Tae-Chul Moon
    • Journal of Radiation Industry
    • /
    • v.18 no.3
    • /
    • pp.255-266
    • /
    • 2024
  • The uranium nuclear fuel used in nuclear power generation needs to be replaced with new fuel after a certain period. In South Korea, the spent nuclear fuel generated during this process is temporarily stored within the nuclear power plant site, and there are ongoing issues with the saturation of storage capacity. To address these problems, the South Korea government has established a plan to manage high-level radioactive waste, including provisions for securing interim storage facilities. An interim storage facility is designed to safely store spent nuclear fuel for certain period before its permanent disposal. This study analyzed leading international cases of interim storage facilities that are technically feasible and can reduce the operating period of temporary storage facilities for spent nuclear fuel within nuclear power plant sites. It also presented the technical concepts required for the operation of interim storage facilities for spent fuel from PWR(Pressurized Water Reactor), reflecting the situation in South Korea.

Set-up of Mechanical/Structural Test Facilities on the Spacer Grid of the PLWR Fuel (가압경수로 핵연료 지지격자의 기계/구조적 시험장치 구축)

  • Song, Kee-Nam;Yoon, K.H;Kang, H.S;Kim, H.K
    • Proceedings of the KSME Conference
    • /
    • 2001.11a
    • /
    • pp.355-360
    • /
    • 2001
  • Design requirements for the nuclear fuel assembly grid of the pressurized light water reactor(PLWR) are scrutinized from the mechanical/structural point of view. As a result of the scrunity, mechanical/structural test facilities on the spacer grid of the PLWR Fuel are set up in KAERI to find out their mechanical/structural performance.

  • PDF

Consequence Modeling Methodology for Prediction of Hazard Distance for Two-phase Flow Release from the Pressurized Chlorine Saturated Liquid Storage Tank (가압 염소포화액체 저장탱크의 2상 흐름 누출에 대한 유해위험거리의 예측을 위한 결과영향 모델링 방법론)

  • Song D. M.;Park Y. S.;Park J. K.
    • Journal of the Korean Institute of Gas
    • /
    • v.2 no.4
    • /
    • pp.7-17
    • /
    • 1998
  • This study is to develop the consequence modeling methodology for quantitative prediction of the hazard distance(or toxic buffer distance) for two-phase flow continuous releases from the pressurized chlorine saturated liquid storage tank of the chemical plant facilities. The source term modeling was peformed by the refined analysis method based on USEPA's guideline and SuperChems model self-calculation, respectively. The hazard distance was predicted for STEL, IDLH and ERPGs(ERPG-2 and ERPG-3) concentrations being used as the toxic regultaion concentration in hazard estimation. To use as hazard estimation guideline for the establishment of the emergency response planning, the effects of source characteristics and meteorological vaiations on the hazard distance was especially considered for ERPG-2 concentration.

  • PDF

PRA RESEARCH AND THE DEVELOPMENT OF RISK-INFORMED REGULATION AT THE U.S. NUCLEAR REGULATORY COMMISSION

  • Siu, Nathan;Collins, Dorothy
    • Nuclear Engineering and Technology
    • /
    • v.40 no.5
    • /
    • pp.349-364
    • /
    • 2008
  • Over the years, probabilistic risk assessment (PRA) research activities conducted at the U.S. Nuclear Regulatory Commission (NRC) have played an essential role in support of the agency's move towards risk-informed regulation. These research activities have provided the technical basis for NRC's regulatory activities in key areas; provided PRA methods, tools, and data enabling the agency to meet future challenges; supported the implementation of NRC's 1995 PRA Policy Statement by assessing key sources of risk; and supported the development of necessary technical and human resources supporting NRC's risk-informed activities. PRA research aimed at improving the NRC's understanding of risk can positively affect the agency's regulatory activities, as evidenced by three case studies involving research on fire PRA, human reliability analysis (HRA), and pressurized thermal shock (PTS) PRA. These case studies also show that such research can take a considerable amount of time, and that the incorporation of research results into regulatory practice can take even longer. The need for sustained effort and appropriate lead time is an important consideration in the development of a PRA research program aimed at helping the agency address key sources of risk for current and potential future facilities.