• 제목/요약/키워드: pressure tunnel

검색결과 1,410건 처리시간 0.038초

Determination of tunnel support pressure under the pile tip using upper and lower bounds with a superimposed approach

  • Lee, Yong-Joo
    • Geomechanics and Engineering
    • /
    • 제11권4호
    • /
    • pp.587-605
    • /
    • 2016
  • This study aimed to develop upper and lower bounds to predict the tunnel support pressure under the pile tip during the circular tunnel excavation. Most previous studies on the upper and lower bound methods were carried out for the single ground structures, e.g., retaining wall, foundation, ground anchor and tunnel, in the homogeneous ground conditions, since the pile-soil-tunnel interaction problem is very complicated and sophisticated to solve using those bound methods. Therefore, in the lower bound approach two appropriate stress fields were proposed for single pile and tunnel respectively, and then they were superimposed. In addition, based on the superimposition several failure mechanisms were proposed for the upper bound solution. Finally, these upper bound mechanisms were examined by shear strain data from the laboratory model test and numerical analysis using finite element method.

고속주행시 철도터널내 공기압 특성에 관한 기초연구 - 미기압(MPW)을 중심으로 (A study on the characteristics for aerodynamics at high speed in railway tunnels - focused on the micro pressure wave)

  • 김효규;최판규;유지오
    • 한국터널지하공간학회 논문집
    • /
    • 제16권2호
    • /
    • pp.249-260
    • /
    • 2014
  • 열차가 고속으로 터널을 진입할 때 압축파가 발생하게 된다. 이 압축파가 터널 출구부에 도달하면 일부는 외부로 방출되고 일부는 팽창파의 형태로 반사되어 터널내부로 전파된다. 이러한 파는 충격파의 형태로 외부로 방출되는데, 이를 미기압(micro pressure wave)이라고 한다. 미기압파는 터널 출구부에 소음 및 진동문제를 일으키며, 이 현상이 클수록 민가 및 주변 유리창에 손상과 거주자의 불안을 일으키는 원인이 된다. 따라서 고속철도 건설을 위해서는 미기압에 대한 대책과 이에 대한 예측이 필요한 실정이다. 이에 본 연구는 운영중인 터널에서의 미기압 측정사례와 터널내 압력기울기에 대한 수치해석을 통하여, 차량의 전두부 형상 및 터널 갱구부 형상에 따른 영향을 분석하였다. 그 결과로, 본 연구에서는 미기압파의 강도를 예측하는 방법을 제시하였으며, 이를 통해서 터널 연장과 단면적에 따른 미기압 강도를 해석하였다.

고속철도 터널 입구후드에 관한 수치해석적 연구 (Numerical Study on High-Speed railway Tunnel Entrance Hood)

  • 김희동;김동현
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 1998년도 창립기념 춘계학술대회 논문집
    • /
    • pp.604-611
    • /
    • 1998
  • High-speed railway trains entering and leaving tunnels generate finite amplitude pressure wave which propagate back and forth along the tunnels, reflecting at the open ends of the tunnels and at other discontinuities such as ventilation shafts and the train themselves. In present day railways, the magnitudes of the pressure waves are much too small to cause structual damage, but they are a serious potential source of aural discomport for passengers on unsealed trains. Almost always do the pressure waves propagating along the tunnels lead to a hazardous impulse noise near the exit portal of the tunnel. In order to alleviate such undesirable phenomena, some control strategies have been applied to the compression wave propagating inside the tunnel. The objective of the current work is to investigate the effect of tunnel entrance hoods on the entry compression wave at the vicinity of the tunnel entrance. Three types of entrance hoods were tested by the numerical method using the characteristics of method for a wide range of train speeds. The results show that the maximum pressure gradient of compression wave can be considerably reduced by the tunnel entrance hood. Desirable hood shape for reduction of the pressure transients and impulse noise was found to be of abrupt type hood with its cross-sectional area 2.5times the tunnel area.

  • PDF

Reliability analysis of anti-seismic stability of 3D pressurized tunnel faces by response surfaces method

  • Zhang, Biao;Ma, Zongyu;Wang, Xuan;Zhang, Jiasheng;Peng, Wenqing
    • Geomechanics and Engineering
    • /
    • 제20권1호
    • /
    • pp.43-54
    • /
    • 2020
  • The limit analysis and response surfaces method were combined to investigate the reliability of pressurized tunnel faces subjected to seismic force. The quasi-static method was utilized to introduce seismic force into the tunnel face. A 3D horn failure mechanism of pressurized tunnel faces subjected to seismic force was constructed. The collapse pressure of pressurized tunnel faces was solved by the kinematical approach. The limit state equation of pressurized tunnel faces was obtained according to the collapse pressure and support pressure. And then a reliability model of pressurized tunnel faces was established. The feasibility and superiority of the response surfaces method was verified by comparing with the Monte Carlo method. The influence of the mean of soil parameters and support pressure, variation coefficients, distribution type and correlation of c-φ on the reliability of pressurized tunnel faces was discussed. The reasonable safety factor and support pressure required by pressurized tunnel faces to satisfy 3 safety levels were presented. In addition, the effects of horizontal seismic force, vertical seismic force and correlation of kh-kv on the reliability of pressurized tunnel faces were also performed. The method of this work can give a new idea for anti-seismic design of pressurized tunnel faces.

틸팅 열차의 터널주행 시 실내 압력변화에 대한 실험적 연구 (Experimental study of Internal pressure variation of the TTX traveling in conventional tunnels)

  • 윤수환;이영빈;곽민호;박훈일;김규홍;이동호;권혁빈;고태환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.2114-2119
    • /
    • 2008
  • When a train enters into a tunnel, a compression wave is generated by a front nose and a expansion wave is generated by a rear nose each other. Because the compression wave and expansion wave have interactions with the train in a tunnel repeatedly, the internal pressure of the train is dramatically varied. And this pressure variation gives passengers discomfort like ear-ache. In this paper, we had measured the internal pressure variation of TTX developed and being on Test-Running in Honam line and made an analysis of pressure variation rate. As a result, the internal pressure variation was different as to the length of tunnel. Though the entering velocity of TTX is similar on test tunnels, on the short tunnel, the pressure drop was lower then that of the long tunnel. And it was expected that the rates of internal pressure variation would be exceeded the limits on 160km/h entering velocity.

  • PDF

터널조명용 광원의 경제성 비교 (The Comparison of the Economical Efficiency of Light Sources for a Tunnel Lighting)

  • 이진우
    • 조명전기설비학회논문지
    • /
    • 제25권2호
    • /
    • pp.32-42
    • /
    • 2011
  • In this paper to compare the economical efficiency of light sources for a tunnel lighting, we define a model tunnel and design tunnel lighting. And to examine economical efficiency of various tunnel lightings we compare the lighting expenses of tunnels. The results shows high pressure sodium lamps are more economical than fluorescent lamps.

고속전철의 터널입구 형상이 공력특성 및 터널입구 압축파에 미치는 영향 (Effect of Tunnel Entrance Shape of High Speed Train on Aerodynamic Characteristics and Entry Compression Wave)

  • 정수진;김우승
    • 한국자동차공학회논문집
    • /
    • 제12권6호
    • /
    • pp.111-118
    • /
    • 2004
  • The work presented in this paper concerns the aerodynamic characteristics and compression wave generated in a tunnel when a high speed train enters it. A large number of solutions have been proposed to reduce the amplitude of the pressure gradient in tunnels and some of the most efficient solutions consist of (a) addition ofa blind hood, (b) addition of inclined part at the entrance, and (c) holes in the ceiling of the tunnel. These are numerically studied by using the three-dimensional unsteady compressible Euler equation solver with ALE, CFD code, based on FEM method. Computational results showed that the smaller inclined angle leads to the lower pressure gradient of compression wave front. This study indicated that the most efficient slant angle is in the range from $30^{\circ}$ to $50^{\circ}$. The maximum pressure gradient is reduced by $26.81\%$ for the inclined angle of $30^{\circ}$ as compared to vertical entry. Results also showed that maximum pressure gradient can be reduced by $15.94\%$ in blind hood entry as compared to $30^{\circ}$ inclined tunnel entry. Furthermore, the present analysis showed that inclined slant angle has little effect on aerodynamic drag. Comparison of the pressure gradient between the inclined tunnel hood and the vertical entry with air vent holes indicated that the optimum inclined tunnel hood is much more effective way in reducing pressure gradient and increasing the pressure rise time.

Technology to reduce water ingress for TBM cutterhead intervention

  • Ham, Soo-Kwon;kim, Beom-Ju;Lee, Seok-Won
    • Geomechanics and Engineering
    • /
    • 제29권3호
    • /
    • pp.321-329
    • /
    • 2022
  • Tunnel site where high water pressure is applied, such as subsea tunnel, generally selects the shield TBM (Tunnel Boring Machine) to maintain the tunnel excavation face. The shield TBM has cutters installed, and the cutters wear out during the process of excavation, so it should be checked and replaced regularly. This is called CHI (Cutterhead Intervention). The conventional CHI under high water pressure is very disadvantageous in terms of safety and economics because humans perform work in response to high water pressure and huge water inflow in the chamber. To overcome this disadvantage, this study proposes a new method to dramatically reduce water pressure and water ingress by injecting an appropriate grout solution into the front of the tunnel face through the shield TBM chamber, called New Face Grouting Method (NFGM). The tunnel model tests were performed to determine the characteristics, injection volume, and curing time of grout solution to be applied to the NFGM. Model test apparatus was composed of a pressure soil tank, a model shield TBM, a grout tank, and an air compressor to measure the amount of water inflow into the chamber. The model tests were conducted by changing the injection amount of the grout solution, the curing time after the grout injection, and the water/cement ratio of grout solution. From an economic point of view, the results showed that the injection volume of 1.0 L, curing time of 6 hours, and water/cement ratio of the grout solution between 1.5 and 2.0 are the most economical. It can be concluded that this study has presented a method to economically perform the CHI under the high water pressure.

터널을 통과하는 고속철도차량에 의해 형성되는 비정상 유동장의 수치해석 (Numerical Simulation of the Unsteady Flow Field Induced by a High-speed Train Passing through a Tunnel)

  • 권혁빈;이동호;김문상
    • 한국철도학회논문집
    • /
    • 제3권4호
    • /
    • pp.229-236
    • /
    • 2000
  • In this study, the unsteady flow field induced by a high-speed train passing through a tunnel is numerically simulated by using an axi-symmetric Euler Equation. The modified patched grid scheme applied to a structured grid system was used to handle the relative motion of a train. The hybrid-dimensional approach which mixed 1D and axi-symmetric dimension was used to reduce the computation time and memory storage. By employing the hybrid-dimensional approach, a long tunnel as much as 5 km was able to be simulated efficiently. The results show that the maximum pressure rise in the tunnel by the entrance of the train is a function of both train speed and train-tunnel cross-sectional area ratio. The unsteady pressure fluctuation in the tunnel and around the train was also investigated in the real condition; Korean high-speed train on the Seoul-Pusan line.

  • PDF

수로 압력터널의 콘크리트Lining 해석 (Analysis of the Concrete Lining for Water Pressure Tunnel)

  • 김승권;임정열;공천석;안주옥
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.27-33
    • /
    • 2001
  • Objective of this study is to investigate the structural behavior of the concrete lining in water pressure tunnel. In many cases, the concrete lining of water pressure tunnel has not considered as a major structure comparing to the other structures, resulting in use of conservative analysis and design. For the detailed analysis of concrete lining of water pressure tunnel, factors such as rock pressure and water pressure have to be considered. In this study, analysis of concrete lining was performed by using beam element method, shell element method and solid element method. Analysis results showed that the tensile stress at crown of concrete lining is greatly affected by the stability of concrete lining and the tensile stress for the concrete lining has to be evaluated for the section where maximum moment is occurred.

  • PDF