• Title/Summary/Keyword: preliminary estimate

Search Result 270, Processing Time 0.038 seconds

Preliminary Study on the Construction of Database for BIM-based preliminary estimate. (BIM 기반 개산견적을 위한 DB구축 기초연구)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.291-292
    • /
    • 2012
  • Progress in the construction project, the estimated cost of the measure is very important. Use preliminary estimate cost data for the prediction of construction cost. But, preliminary estimate cost data a clear calculation, there is no way. it is rely on the historical data and the past construction data. As a result, a significant difference in the actual construction cost and the predicted cost of the problem occurs. In this study, taking advantage of BIM Cost Prediction for efficient and rapid preliminary estimate BIM for building database through the study preliminary estimate cost data.

  • PDF

A study on the development of the construction project for the preliminary estimate based on a database of the BIM technique. (데이터베이스 중심의 BIM기반 개산견적을 위한 모델 개발)

  • Bae, Seong-Jae;Suh, Bong-Gyo;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.92-93
    • /
    • 2013
  • Recently, a technique based on BIM has been rapidly increased on the construction project. Task such as a calculation of supply easily is proceeded by the technique. Also, an quick and precise preliminary estimate is possible because this technique can be applied. To sum up, this study suggests that the preliminary estimate based on a database of the BIM technique is applicable for the early stage of the construction project.

  • PDF

A Study on the Model of Artificial Neural Network for Construction Cost Estimation of Educational Facilities at Conceptual Stage (교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Chung-Yung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.91-99
    • /
    • 2006
  • The purpose of this study is propose an Artificial Neural Network(ANN) model for the construction estimate of the public educational facility at conceptual stage. The current method for the preliminary cost estimate of the public educational facility uses a single-parameter which is based on basic criteria such as a gross floor area. However, its accuracy is low due to the nature of the method. When the difference between the conceptual estimate and detailed estimate is huge, the project has to be modified to meet the established budget. Thus, the ANN model is developed by using multi-parameters in order to estimate the project budget cost more accurately. The result of the research shows 6.82% of the testing error rates when the developed model was tested. The error rates and the error range of the developed model are smaller than those of the general preliminary estimating model at conceptual stage. Since the proposed ANN model was trained using the detailed estimate information of the past 5 years' school construction data, it is expected to forecast the school project cost accurately.

The Estimation of Blood Velocity from Heart in Medical Images using Regional Segmentation (영상분할을 이용한 의학영상에서의 심장혈류 측정)

  • 정철곤;김중규;김경섭
    • Proceedings of the IEEK Conference
    • /
    • 1999.11a
    • /
    • pp.517-520
    • /
    • 1999
  • In this paper, we propose a non-invasive method to estimate blood velocity from the real medical images. To measure the magnitude and direction components associated with the blood velocity, we apply the optical flow analysis algorithm. It is demonstrated that the accuracy of the blood velocity estimate could possibly be increased by segmenting the optical flow region. We call this the Region Optical Flow(ROF) algorithm. We carried out some preliminary experiments using the aorta medical images, and corresponding regional optical flow diagrams are provided.

  • PDF

Application of ArcGIS-based Model Developed to Estimate Monthly Potential Soil Loss (월단위 토양유실가능성 추정을 위해 개발된 ArcGIS 기반의 모형 적용)

  • Yu, Na Young;Shin, Min Hwan;Kim, Jonggun;Park, Youn Shik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.5
    • /
    • pp.109-126
    • /
    • 2017
  • Universal soil loss equation (USLE) is used to estimate soil loss solely or employed in any hydrologic models. Since soil erosion has been an issue in South Korea for decades, the Ministry of Environment enacted a law to regulate soil erosion in 2012, which is the Notification of topsoil erosion status. The notification is composed of preliminary and field investigations, the preliminary investigation suggests to use USLE and provides USLE factors. However, the USLE factors provided in the notification was prepared at least 10 years ago, therefore it is limited to reflect recent climate changes. Moreover the current yearly USLE approach does not provide an opportunity to consider seasonal variation of soil erosion in South Korea. A GIS-based model was therefore applied to evaluate the yearly USLE approach in the notification. The GIS-based model employs USLE to estimate soil loss, providing an opportunity to estimate monthly soil loss with monthly USLE factor databases. Soil loss was compared in five watersheds, which were Geumgang, Hangang, Nakdonggang, Seomjingang, and Yeongsangang watersheds. The minimum difference was found at Seomjingang watershed, the yearly potential soil loss were 40.15 Mg/ha/yr by the notification approach and 34.42 Mg/ha/yr by the GIS-based model using monthly approach. And, the maximum difference was found at Nakdonggang watershed, the yearly potential soil loss were 27.01 Mg/ha/yr by the notification approach and 10.67 Mg/ha/yr by the GIS-based model using monthly approach. As a part of the study result, it was found that the potential soil loss can be overestimated in the notification approach.

Analysis of Impact Factors for the Improvement of Conceptual Cost Estimation Accuracy for Public Office Building (공공청사 개산견적 정확도 향상을 위한 공사비 영향요인 분석)

  • Jo, Yeong-Ho;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.495-506
    • /
    • 2021
  • A Conceptual cost estimate, which is computed in the preliminary step of a project, is important for decision-making by a contractor in terms of the project budget, economic feasibility and validity analysis, and alternative comparisons. Therefore, a high error rate of a prediction model for a conceptual cost estimate can lead to various problems including excessive project expenditures and a delayed break-even point. this study proposed optimal impact factors by configuring quantitative impact factors computable in a preliminary step in various cases(combinations of impact factors). subsequently, the accuracy of different cases was comparatively analyzed by using the cases as input values of a prediction model using regression analysis. when the optimal combination of impact factors proposed in this study and other combination of impact factors were applied to the prediction model, the regression analysis-based prediction model exhibited 0.2-4.7% improvements in accuracy, respectively. the optimal combination of impact factors proposed in this study improved the accuracy of the prediction model of a conceptual cost estimate by removing unnecessary impact factor.

An Improved Preliminary Cut-off Indoor Positioning Scheme in Case of No Neighborhood Reference Point (이웃 참조 위치가 없는 경우를 개선한 실내 위치 추정 사전 컷-오프 방식)

  • Park, Byoungkwan;Kim, Dongjun;Son, Jooyoung;Choi, Jongmin
    • Journal of Korea Multimedia Society
    • /
    • v.20 no.1
    • /
    • pp.74-81
    • /
    • 2017
  • In learning stage of the preliminary Cut-off indoor positioning scheme, RSSI and UUID data received from beacons at each reference point(RP) are stored in fingerprint map. The fingerprint map and real-time beacon information are compared to identify the nearest K reference points through which the user position is estimated. If the number of K is zero, this scheme cannot estimate user position. We have improved the preliminary Cut-off scheme to get the estimated user position even in the case. The improved scheme excludes the beacon of the weakest signal received by user mobile device and identifies neighborhood reference points using the other beacon information. This procedure are performed repetitively until K > 0. The simulation results confirm that the proposed scheme outperforms K-Nearest-Neighbor (KNN), Cluster KNN and the conventional Cut-off scheme in terms of accuracy while the constraints are guaranteed to be satisfied.

Preliminary Experimental Study on the Two-phase Flow Characteristics in a Natural Circulation Loop (자연순환 루프에서 이상유동 특성에 관한 예비실험 연구)

  • Kim, Jae-Cheol;Ha, Kwang-Soon;Park, Rae-Joon;Hong, Seong-Wan;Kim, Sang-Baik
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.308-311
    • /
    • 2008
  • As a severe accident mitigation strategy in a nuclear power plant, ERVC(External Reactor Vessel Cooling) has been proposed. Under ERVC conditions, where a molten corium is relocated in a reactor vessel lower head, a natural circulation two-phase flow is driven in the annular gap between the reactor vessel wall and its insulation. This flow should be sufficient to remove the decay heat of the molten corium and maintain the integrity of the reactor vessel. Preliminary experimental study was performed to estimate the natural circulation two-phase flow. The experimental facility which is one dimensional, the half height, and the 1/238 channel area of APR1400, was prepared and the experiments were carried out to estimate the natural circulation two-phase flow with varying the parameters of the coolant inlet area, the heat rate, and the coolant inlet subcooling. In results, the periodic circulation flow was observed and the characteristics were varied from the experimental parameters. The frequency of the natural circulation flow rate increased as the wall heat flux increased.

  • PDF

The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge (RC라멘교의 기본설계단계 개략공사비 산정모델)

  • Kim, Byung-Soo;Kwon, Suk-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.111-120
    • /
    • 2009
  • The conceptual cost estimation used the construction project needs for confirm budget not only at the planning phase but also at the preliminary design phase of the construction project. Present, the conceptual cost estimation model have problems the rate of error is very large because the linear simple model calculate by use the cost of the unit meter or the unit square. This study development the model used grouping and the key quantity method, the mixed unit cost for solve problem of the very large rate of error. The result of this study reduced difference of between the real design construction cost therefor it expect that contribute to the client or the service company estimate budget of RC rahmen bridge.