• 제목/요약/키워드: prefabricated building

검색결과 81건 처리시간 0.026초

중국 조립식 건축 발전현황 및 정책 동향 (Prefabricated Building Development Status and Policy Trend in China)

  • 전아여;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.29-30
    • /
    • 2023
  • In view of the labor-intensive characteristics of the construction industry and the persistent negative image, the problems of continuous aging and manpower shortage in the domestic construction industry are becoming more and more serious, which must be solved for the survival of the domestic construction industry. China has made certain achievements in prefabricated buildings. Through this research, we describe the development process of China's prefabricated buildings in different stages, and analyze the necessary policy promotion and standard support in the development of prefabricated buildings. Analyze and examine the necessary conditions for China's prefabricated building achievements and success factors, and make better proposals for the development of the construction industry in South Korea.

  • PDF

프리캐스트 콘크리트 대형 패널을 이용한 조립식 아파트 공사 (Prefabricated Apartments Project Using Precast Concrete Large Panel System)

  • 박의식
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1989년도 가을 학술발표회 논문집
    • /
    • pp.49-52
    • /
    • 1989
  • This report introduces the large scale prefabricated apartment project in Saudi Arabia designed and built by Hyundai Engineering and construction Co. as turn-key basis from ministry of Public works and ltousing of Saudi Arabia. This project using precast large panel system is 7,600 dwelling unit, total building area 1.8 mil sguare meters. Large panel system is a kind of industrialized building method which classified as monolithic system, total system and structural system. Hyundai Engineering and Construction Co. develop his own prefabricated large panel system for this project and named "HYUNDAI SYSTEM". The key point of this system is vertical and horizontal joints between panels. Also stability of whole building structure is especially important for this kind of prefabricated building. building.

  • PDF

MANAGERIAL AND ECONOMIC OPTIMIZATIONS FOR PREFABRICATED BUILDING SYSTEMS

  • Ahmed Abdallah
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-614
    • /
    • 2005
  • This paper deals with new realizations of research, scientific development, managerial and economic optimizations for prefabricated building systems. In the literature, all scientific fields are worked out based on the efficiencies, costs, benefits, choice of execution design, technical demands, aesthetical point of view, as well as the total economics. In the present example of a school-building for communities in the third world, the following criteria have been regarded: The optimal superstructure of prefabricated concrete building systems; the particularity of countries of the Third World (e.g. the climate, the political and the economic conditions); the time for construction and necessary innovative developments for an economically optimized superstructure. Added to this are alternative construction-methods and costs for a simple but variable system which can be adapted to changing functions, where variability should be the main point. For example, a school building that is to be adapted by varying number of rooms to cater for the growing number of pupils.

  • PDF

Research on Facility Layout of Prefabricated Building Construction Site

  • Yang, Zhehui;Lu, Ying;Zhang, Xing;Sun, Mingkang;Shi, Yufeng
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.42-51
    • /
    • 2017
  • Due to the high degree of mechanization and the good environmental benefits, the prefabricated buildings are being promoted in China. The construction site layout of the prefabricated buildings has important influence on its safety benefit. However, few scholars have studied the safety problem on it. Firstly, in order to give a follow-up study foreshadowing the characteristics of prefabricated buildings are analyzed, the research assumptions are given and three types of safety buffers are established. And then a mult-objective model for the prefabricated buildings site layout is presented: taking into account the limits of noise, the coverage of the tower crane and the possibility of exceeding boundaries and overlapping, the constraints are and designed established respectively; Based on the improved System Layout Planning (SLP) method, the efficiency\cost\safety interaction matrices among the facilities are also founded for objective function. For the sake of convenience, a hypothetical facility layout case of the prefabricated building is used, the optimal solution of that is obtained in MATLAB with particle swarm algorithm (PSO), which proves the effectiveness of the model presented in this paper.

  • PDF

시공오차가 있는 선기초기둥에 공장제작보의 설치가 용이한 탑다운공사용 접합기술개발 (Development of Top-Down Connection System to Solve the Problem of Construction Tolerances in Installing Prefabricated Beams to Pre-founded Columns)

  • 김승원;정희원;박대영;김동건;박주현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.25-30
    • /
    • 2011
  • Almost prefounded columns for top-down construction certainly have construction tolerances in plan and plumbness. Therefore, it is very difficult to connect prefabricated beams to prefounded columns at each floor level after excavation by usual top-down connection method and this usual connection method leads to long construction time, increasing cost and decreasing quality. This paper presents a new method for connecting prefabricated beam to prefounded column with GROUT-JACKET CONNECTION SYSTEM consisting of sleeve, bearing-shear bands and grout. Details and illustrations of the connections and applications by GROUT-JACKET CONNECTION SYSTEM for the top-down construction are also included in this paper.

  • PDF

건축기초에서의 매입말뚝 설계기준 및 사례 (Review of Design Guide and Case Study on Bored Prefabricated Piling Method in Architectural Building Foundation)

  • 이원제
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.549-558
    • /
    • 2008
  • Well known and widely used in urban area and limited installation condition, a low noise and vibration piling method which has being called Bored Prefabricated Piling Method was reviewed in terms of design guide, and introduced a few case as well. Among the areas being applied of that method, a structural guide of architectural foundation was reviewed and compared to civil engineering foundation area to provide wider information for the foundation engineers. With introducing a few case application including pile load testing review especially dynamic testing in normal building foundation work, engineers may have a useful information on the design and construction of the piling method even different engineering area. It may also make enhancement a view of foundation engineering knowledge to various pile foundation area.

  • PDF

Mechanical behavior test and analysis of HEH sandwich external wall panel

  • Wu, Xiangguo;Zhang, Xuesen;Tao, Xiaokun;Yang, Ming;Yu, Qun;Qiu, Faqiang
    • Advances in concrete construction
    • /
    • 제13권 2호
    • /
    • pp.153-162
    • /
    • 2022
  • Prefabricated exterior wall panel is the main non-load-bearing component of assembly building, which affects the comprehensive performance of thermal insulation and durability of the building. It is of great significance to develop new prefabricated exterior wall panel with durable and lightweight characteristics for the development of energy-saving and assembly building. In the prefabricated sandwich insulation hanging wall panel, the selection of material for the outer layer and the arrangement of the connector of the inner and outer wall layers affect the mechanical performance and durability of the wall panels. In this paper, high performance cement-based composites (HPFRC) are used in the outer layer of the new type wall panel. FRP bars are used as the interface connector. Through experiments and analysis, the influence of the arrangement of connectors on the mechanical behaviors of thin-walled composite wall panel and the panel with window openings under two working conditions are investigated. The failure modes and the role of connectors of thin-walled composite wallboard are analyzed. The influence of the thickness of the wall layer and their combination on the strain growth of the control section, the initial crack resistance, the ultimate bearing capacity and the deformation of the wall panels are analyzed. The research work provides a technical reference for the engineering design of the light-weight thin-walled and durable composite sandwich wall panel.

프리팹 교량의 DfMA를 위한 디지털엔지니어링 모델 정의 (Definition of Digital Engineering Models for DfMA of Prefabricated Bridges)

  • 두이-쿠엉 응구옌;노기태;심창수
    • 한국BIM학회 논문집
    • /
    • 제12권1호
    • /
    • pp.10-22
    • /
    • 2022
  • Prefabricated bridges require strict management of tolerance during fabrication and assembly. In this paper, digital engineering models for prefabricated bridge components such as deck, girder, pier, abutment are suggested to support information delivery through the life-cycle of the bridge. Rule-based modeling is used to define geometry of the members considering variable dimensions due to fabrication and assembly error. DfMA(design for manufacturing and assembly) provides the rules for ease of fabrication and assembly. The digital engineering model consists of geometry, constraints and corresponding parameters for each phase. Alignment and control points are defined to manage tolerances of the prefabricated bridge during fabrication and assembly. Quality control by digital measurement of dimensions was also considered in the model definition. A pilot bridge was defined virtually to validate the suggested digital engineering models. The digital engineering models for DfMA showed excellent potential to realize prefabricated bridges.

유닛모듈러 건축구조물의 수평 정밀도 확보를 위한 Pre-Fab 독립기초 높이조절 공법 개발 (Development of a Height Adjustment Method of Prefabricated Individual Footing for the Leveling of Unit Modular Structural System)

  • 전영훈;김균태;채명진
    • 한국건축시공학회지
    • /
    • 제15권6호
    • /
    • pp.631-639
    • /
    • 2015
  • 유닛모듈러 공법에서는 정밀 제작된 유닛모듈과 시공정밀도가 낮은 기초부의 접합부에서 수평 정밀도 차이가 발생한다. 이러한 정밀도 차이로 인하여 상부 유닛모듈이 뒤틀리거나, 간격이 벌어지는 등 다양한 문제가 야기될 수 있다. 이러한 배경에서 본 연구는 Pre-Fab 독립기초의 높이조절이 가능한 공법을 개발하는 것을 목적으로 하였다. 이를 위하여 본 연구에서는 볼트와 너트를 이용한 높이조절 공법을 제안하고 시공 상세도와 시공순서를 제시하였다. 그리고 구조 시뮬레이션을 수행하여 구조적 안정성을 확인하였다. 향후 개발된 높이조절 공법의 mock-up 시험, 경제성 분석 등을 실시하여 시공성과 유용성을 검토할 예정이다.

공업화자재의 활용을 통한 공정합리화 (Building construction process improvement using prefabricated materia)

  • 윤유상;이형수;서상욱
    • 한국건설관리학회논문집
    • /
    • 제4권1호
    • /
    • pp.90-96
    • /
    • 2003
  • 도심지 건축공사가 증가하고 있는 우리나라에서 작업공간의 부족 및 자재의 적시공급에 대한 문제는 반드시 해결해야 할 과제이다. 이 중에서도 주택건설에 있어 가장 큰 비중을 차지하고 있는 아파트 시공의 경우, 초고층화로 골조공사의 중요성과 함께 친환경적 공법과 합리적 공정개선 및 원가절감을 구현할 새로운 공법이 요구되고 있다. 본 연구에서는 국내 건설현장의 사례조사를 통해 슬래브 거푸집공사와 마감공사의 프로세스에서 불필요한 요소를 최소화하고자 공업화 자재를 활용한 (골조-마감공사)통합공법을 제시한다 가치흐름분석기법(Value Stream Mapping)을 활용하여 기존 프로세스에서의 비 가치 창출작업을 가치창출작업에 통합시키거나 제거하여 슬래브 공사 내에서 공기 및 투입인력의 절감 가능성을 확인하고, 공기단축과 원가절감 효과를 측정하였다. 이와 같이 공업화 자재의 활용으로 현장작업에 따른 변이를 최소화하여 공정의 안정성 및 공정계획의 신뢰성을 확보 등 공정의 합리화를 구현하고자 한다.