• Title/Summary/Keyword: pre-safety assessment system

Search Result 37, Processing Time 0.025 seconds

A Study on Development of Pre-Hazards Risk Analysis Guide Tool (연구실 위험분석을 위한 사전유해인자 가이드 Tool 개발 연구)

  • Choi, Byeong Kyu;Rhie, Kwang Won
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.133-140
    • /
    • 2017
  • The Ministry of Science, ICT and Future Planning made law for Pre-Hazard Risk Analysis in December 31, 2014 to protect researchers from continuing accidents in laboratory. Conducted before an experiment, Pre-Hazard Risk Analysis finds hazards of the experiment and rules to manage the hazards.So the Pre-Hazard Risk Analysis can support laboratory safety system by prevent accidents in laboratory. Pre-Hazards Risk Analysis is newly created system so that executors need Guidelines to perform this analysis properly. This study is to develop guide tool for Pre-Hazard Risk Analysis by analyzing other risk assessment systems; PSM, Off-site Consequence Assessment, laboratory safety system. Also, this study suggested how to establish database for Pre-Hazard Risk Assessment by analyse KRAS.

A Study on Application Method & System Introduction of Laboratory Pre-hazards Risk Analysis (연구실 사전유해인자위험분석 적용방안 및 제도도입 연구)

  • Cho, Nam Joon;Ji, Yong Gu
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.4
    • /
    • pp.126-135
    • /
    • 2016
  • The purpose of this study is to develop risk assessment techniques and institutional analysis of domestic and international, the management techniques that can efficiently manage the harmful factor of the laboratory and to present the institutional measures that can be efficiently implemented. Due to a variety of adverse factors of laboratory, accidents of laboratory of various forms have occurred, but there is no risk assessment system in order to manage this effectively. So, we investigated this domestic existing risk assessment methods and the outside of the risk assessment system, and also analyzed accidents of domestic laboratory that occurred in 2014. In addition, we targeted the 24 laboratories in 21 universities to investigate the management of harmful factors of the laboratory and performed applying test for 12 domestic laboratories. Existing risk evaluation system, such as PMS, SMS, off-site impact assessment, since the industrial site is the subject, is a difficult problem to be directly applied to the laboratory of the research institute. So, we implemented management status and harmful factors survey and classified the research and development activities based on this data. Finally we developed "pre-hazards risk analysis method" to create each of the safety management measures. In addition, research activities personnel conducted voluntarily risk assessment, which is shared by institutions and government. It is presented the institutional system for safety management of laboratory. Its result, pre-hazards risk analysis method and institutionalization scheme will be able to achieve laboratory accident prevention system.

The study on improving the regulation for industrial accident rate level assessment of construction companies (건설업 산업재해발생률 산정·평가기준 개선방안 연구)

  • Park, Yong-Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.3
    • /
    • pp.17-24
    • /
    • 2016
  • The regulation for industrial accident rate level assessment of construction companies was introduced to the construction industry in the Republic of Korea since 1993 and has brought positive outcome on industrial accidents reduction at construction work sites. There were considerable decrease of industrial accident ratio and enforcing of contrators' safety organizations from the beginning of the regulation for industrial accident rate level assessment. In spite of these positive outcomes, there were some negative effects such as contractors' shrinking accident reports to keep good accident ratios since these figures had a great impact on pre-qualification stage of bidding when general contractors were competing for new construction projects. In addition, Comprehensive evaluation bid system, which replaces the lowest price bid system is applied to government-ordered construction projects since 2016. Comprehensive evaluation bid system includes construction company's accident rate as one of the evaluation items and carries out with the industrial accident rate level assessment of construction companies at the same time. The regulations of two systems have been called for improvement to unify these different procedures and standards which have led business stakeholders to confusion for several years. This study aims to devote on lessening shrinking accident reports and to reduce the waste of business stakeholders through changing the regulation for industrial accident rate level assessment.

Research on construction safety assessment topic areas -Focusing on domestic construction site- (건설안전 분야 평가항목에 대한 연구 -국내 건설공사현장을 중심으로-)

  • Ahn, Kwang Yong;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.4
    • /
    • pp.1-12
    • /
    • 2015
  • Recent construction site large disaster occurs in, even normal disaster not be reduced, the efforts of pre-disaster prevention for this is also a need to study the evaluation index. By comprehensive examination zero reform the current lowest bid system has included the social responsibility index is scheduled, objective and quantitative evaluation indicators making construction safety areas that are included in the item of social responsibility is required ing. In this study, the construction, in order to prevent disasters, efforts pre disaster prevention be presented metrics in the construction safety in the field of comprehensive examination system and the evaluation index, it is intended to examine the evaluation items for the evaluation indices.

- Development of a Safety Assessment System Model in the Manufacturing Industry - (제조업에 대한 안전성평가시스템 모델 구축에 관한 연구)

  • 성호경
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.2
    • /
    • pp.11-26
    • /
    • 2003
  • While a number of Korean companies have undergone ceaseless restructuring to survive today's rapidly changing global economy, the brick and mortar industry has been exerting their efforts to enhance the productivity through the development of new products, quality improvement, cost reduction measures. At present, various risk-evaluation measures have been taken in the fields at the discretion of an enterpriser, though, the effective methods enabling quantitative analysis are insufficient. Accordingly, this study is intended to contribute to the synthetic safety manage -ment in the factory fields and to suggest the quantitative -risk-analysis system by introducing such safety-estimation steps as assortment of processes, pre-assessment of risk factors, decision of risks, counter measures against studied risks, establishment of remedies.

Ontology-based Safety Risk Interactions Analysis for Supporting Pre-task Planning

  • Tran, Si Van-Tien;Lee, Doyeop;Pham, Trang Kieu;Khan, Numan;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.96-102
    • /
    • 2020
  • The construction industry remains serious accidents, injuries, and fatalities due to it's unique, dynamic, and temporary nature. On workplace sites, Safety pre-task planning is one of the efforts to minimize injuries and help construction personnel to identify potential hazards. However, the working conditions are complicated. Many activities, including tasks or job steps, are executing at the same time and place. It may lead to an increase in the risks from simultaneous tasks. This paper contributes to addressing this issue by introducing a safety risk interaction analyzing framework. To accomplish this objective, accident reports of the Occupational Safety and Health Administration (OSHA) are investigated. The pairs of task incompatibility, which have time-space conflicts and lead to incidents, are found. Ontology technology is applied to build the risk database, in which the information is acquired, structuralized. The proposed system is expected to improve pre-task planning efficiency and relieve the burdens encountered by safety managers. A user scenario is also discussed to demonstrate how the ontology supports pre-task planning in practice.

  • PDF

Safety Assessment of Foods Produced Using Recombinant DNA Techniques

  • Toyoda, Masatake
    • Toxicological Research
    • /
    • v.17
    • /
    • pp.167-171
    • /
    • 2001
  • The introduction of genetically modified crops has raised concerns regarding safety issues over the insertion of foreign genes into plant genomes using recombinant DNA technology. Since 1991 in Japan, 29 foods and 6 food additives have been evaluated, based on the "Guideline for Safety Assessment", before these foods were marketed. The MHW, however, decided that safety assessment of such foods and food additives should be legally imposed. because soon such foods and food additives are expected to circulate globally and a new system for assessing safety of such foods and food additives at a pre-market stage is necessary, in order to avoid the distribution of any genetically modified foods that have had no safety assessment. The MHW published relevant announcements to amend existing regulations on 1 May 2000. "Standards for safety assessment of seed plant" is established based on a concept of substantial equivalence, and applicable to the products which are regarded as equivalent to the existing products used as foods and food additives. The characterization of the food products entails consideration of the molecular characterization. phenotypic and compositional characteristics, key nutrients and toxicants, and toxicity and allergenicity of the introduced proteins, and if there are indications of unintended effects of the modification, whether further safety testing (animal studies etc.) is needed should be considered. Safety and wholesomeness studies with whole foods should be care fully designed in order to avoid nutritional imbalances causing artifacts and uninterpretable results as was the case of Dr. Pusztaiis report. A case study of genetically modified soybeans (glyphosate-tolerant soybeans) on the immune system of rats and mice is shown. Chemical compositions were also compared with those of the non-GM soybeans. The studies failed to detect any differences in immuno-toxic activity.muno-toxic activity.

  • PDF

농식품안전 정책방향

  • Jo, Jang-Yong
    • 한국환경농학회:학술대회논문집
    • /
    • 2009.07a
    • /
    • pp.3-18
    • /
    • 2009
  • It is difficult for consumers to satisfy high safety request with post-management method such as inspection and surveillance, as various changes in-and-out of the country associated with food safety. In terms of food safety problems related to foods, it is crucial to recognize public health and consumer protection and construct pre-preventive Food Control System. A joint committee, FAO/WHO made the following consultations to the National Food Safety System. ${\circ}$ Approach entirely from farm to table ${\circ}$ Get ready for Risk Analysis System ${\circ}$ Secure transparency ${\circ}$ Establish the optimal policy by evaluating the effect of regulation When it comes to summarizing the consultation, it would be accumulated as two key words; "Efficiency" and "Credibility". Whereas the problem of efficiency focuses on precaution rather than post-management, it requires policy option to maximize consumer's benefit by evaluating the cost for the Food Safety Management and its benefit. Also, analyzing risk's character and amount, demanding an optimal means, and introducing scientific analysis system put much value on the stakeholder's communications are procedure's security which can satisfy both "Efficiency" and "Credibility" simultaneously. Especially, it is emphasized here that Risk Assessment need to be separated from Risk Management. This action is a valid means of credibility security throughout improving transparency. A number of nations and organizations have reformed the method of food management passing through reflection and examination of the prior National Food Safety Management since BSE occurred in Britain, 1996. FSA; Food Standard Agency, AFFSA, EFSA, BfR, and FSC are Risk Assessment Organization functionally separated from Risk Management Organization, JECFA, JMCFA, JMPR, JEMRA in Codex charge Risk Assessment internationally. In case of advanced countries excluding several those such as The U.S. and so forth, though these Risk Assessment Organizations are either separated functionally within Risk Management Organization or operated as apart organ, common factors are in which it has independence as Science Base. While securing independence of Risk Assessment Function, it is a tendency Risk Management should be functionally unified into efficiency as well. Though Germany constructs integral Risk Management System of diverse ways according to social and political conditions of each country such as GFOCP, DVFA, SNFA, CFIS and AQIS, there is a key word in the center, "Securing efficiency of Food Safety Management". However our nation has a representative plural;diversified system with The U.S., we took a step forward for unification as empowering policy's generalization;adjustment and Risk Assessment Function by means of enacting the "Food Safety Fundamental Law" in 2008 and establishing the "Food Safety Policy Commission" with private and governmental sectors in the Prime Minister's office. Even though the unification of Risk Management hereby increased, there is the lack of strengthening function of Risk Assessment and securing independence. It needs to be required for the professional committee in Food Safety Policy Commission to develop as a exclusive office of Risk Assessment by separating from a policy decision. Administrative Branches should reinforce feeble functions such as fundamental investigation;research for carrying out Risk Assessment with securing efficiency throughout reassessment of prior Risk Management Means.

  • PDF

A Study on the Pre-process for Developing Railway Safety Requirement (철도시스템의 안전성 요구사양 작성을 사전 절차 연구)

  • Joung, Eui-Jin;Lee, Jong-Woo;Kim, Yang-Mo
    • Proceedings of the KIEE Conference
    • /
    • 2002.07b
    • /
    • pp.1272-1274
    • /
    • 2002
  • It is very important to ensure system safety during the process of developing a system, Railway system is also devoting a great portion for the safety. Nowadays many countries leading railway industry have their own system assessment process according to the situation of their train control system. In this paper, a preprocess to establish system safety requirement is represented in the railway signalling system. We also adopt electronic interlocking system for an example.

  • PDF

Compensation Method of eLoran Signal's Propagation Delay and Performance Assessment in the Field Experiment

  • Son, Pyo-Woong;Fang, Tae Hyun;Park, Sul Gee;Han, Younghoon;Seo, Kiyeol
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.11 no.1
    • /
    • pp.23-28
    • /
    • 2022
  • The eLoran system is a high-power terrestrial navigation system that is recognized as the most appropriate alternative to complement the GNSS's vulnerability to radio frequency interference. Accordingly, Korea has conducted eLoran technology development projects since 2016. The eLoran system developed in Korea provides 20 m positioning accuracy to maritime user in Incheon and Pyeongtaek harbor. To accurately calculate the position with the eLoran signal, it is necessary to apply a compensation method that mitigates the propagation delay. In this paper, we develop the compensation method to mitigate the eLoran signal propagation delay and evaluate the positioning performance in Incheon harbor. The propagation delay due to the terrain characteristics is pre-surveyed and stored in the user receiver. Real-time fluctuations in propagation delay compared to the pre-stored data are mitigated by the temporal correction generated at a nearby differential Loran station. Finally, two performance evaluation tests were performed to verify the positioning accuracy of the Korean eLoran system. The first test took place in December 2020 and the second in April 2021. As a result, the Korean eLoran service has been confirmed to provide 20 m location accuracy without GPS.