• 제목/요약/키워드: pre-cooling

검색결과 215건 처리시간 0.05초

화재 피해를 입은 일반강도 RC 보의 보수성능 (Structural Behavior of Retrofitted RC beams with Fire Damages)

  • 안주희;신영수;이차돈;홍성걸
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.1013-1016
    • /
    • 2003
  • This paper is to evaluate practically the techniques and materials of repair for RC elements with fire damages as well as to investigate the structural behavior of RC beams according to pre- or post-repair after fire-damages. For this purpose, normal concrete flexural specimens were exposed to high temperatures by the ISO 834 specification. After natural cooling and post-fire-curing in a natural environment for 2 months, the specimens were repaired with polymer cement mortar for 1 month curing.

  • PDF

신선 표고의 수확 후 유통수명 연장을 위한 예냉조건 구명 (Initial cooling conditions that extend the shelf-life of fresh oak mushrooms (Lentinula edodes) after harvest)

  • 최지원;이지현;김창국;박미희;최현진;임수연;엄향란;장민선;홍윤표
    • 한국버섯학회지
    • /
    • 제20권3호
    • /
    • pp.138-146
    • /
    • 2022
  • 표고 수확후 적정 예냉조건을 구명하기 위해 차압예냉방법으로 2수준 (0℃에서 30분, 0℃에서 1시간), 저온실 냉각으로 3수준 (-3℃에서 1일, 0℃에서 1일, 3℃에서 1일)을 비교하여 냉각 후 랩 (PVC) 포장하여 저온 (1℃)에 6주간 보관하면서 품질 특성 및 상품성률을 조사하여 신선 표고의 유통수명을 연장할 수 있는 가장 효과적인 예냉방법을 구명하고자 하였다. 대조구로 예냉처리하지 않은 무처리를 두었다. 신선 표고의 예냉 후 저온저장시 상품성에 영향을 미치는 품질 요인은 변색과 부패 발생이었고, 이취는 6주간 저장 동안 발생하지 않거나 약하게 발생하여 상품성에 영향을 미치지 않았다. 모든 처리구에서 상품율 100%를 나타내는 저장 기한은 3주까지였다. 저온저장 5주째 표고의 상품율은 0℃ 저온실냉각처리구, 차압예냉 1시간 처리구, 무처리구에서 상품율 100% 였으며, 차압예냉 30분처리구는 80%, -3℃ 저온실 냉각처리구는 86.7% 였다. 예냉 후 1℃ 저온저장 6주째에는 0℃ 저온실 냉각처리구에서 80%, 3℃ 저온실 냉각처리구는 66.7%, 차압예냉 1시간 처리구는 46.7%, 그 외 처리구는 33% 이하의 상품율을 보였다. 따라서 표고를 6주간 보관 시 가장 적합한 예냉방법은 수확 직후 0℃ 저온실에 적재 후 강제통풍예냉을 1일간 실시하는 방법이었다.

Mn-Al계 합금의 열처리에 따른 미세조직 변화와 지기적 특성(제1보) -Mn-Al-Cu 합금을 중심으로- (The Magnetic Characteristics and Microstructure of Mn-A1 System Alloys(1st Report) -Focused on the Mn-A1 Alloys-)

  • 방만규;양현수;곽창섭
    • 한국정밀공학회지
    • /
    • 제5권4호
    • /
    • pp.48-58
    • /
    • 1988
  • This study was undertaken to observe the formation behavior of ferro- magnetic phase in Mn-Al-Cu Alloys. The alloy selected for this investigation was 70% Mn-29% Al-1% Cu. This pre-allyed pig was prepared to the cylinderical castings using an Induction furnace after homogenizing at $1100^{\circ}C$ for 2hr, the specimens were cooled by cooling methods. Subwequent isothermal heat treatments were followed at $550^{\circ}C$ for various periods of time at predetermined(1-1000min). The formation behavior of ferromagnetic phase was investigated by measurements of magnetic properties of the specimens at each stage of heat treatment, and optical microscopic esamination and X-Ray diffraction analyses were also employed. By this basic experimental results, the conclusions are as follows 1) In order to obtain much amount of ferromagnetic phase, the optimum average cooling rate was about 7.35-$16.4^{\circ}C$/sec($1100^{\circ}C$-$600^{\circ}C$). 2) We verified the decomposition of {\tau} phase to {\beta} -Mn and {\gamma} , as the specimens were homogenized at $1100^{\circ}C$ for 12hr, then heat-treased at $550^{\circ}C$ for 1-1000min. 3) A condition of optimum heat treatments in Mn-Al-Cu permanent mag-netic alloys showed that after homogenizing at $1100^{\circ}C$ for 2hr, the speciments were cooled in air or furnace(A) and subsequent heat treatments at $550^{\circ}C$ for 1-30min. The maximum magnetic properties were measured as follows: Air cooling; Br=1200(Gause), bHc=100(oe), (BH)max=0.07(MGOe) Furnace cooling(A);Br=950(Gauss), bhe=80(Oe), (BH)max=0.05(MGOe)

  • PDF

용융주조법으로 제조한 BSCCO-2212 초전도체의 공정변수 연구 (Study on the Processing Variables of BSCCO-2212 Superconductor made by Melt Casting Process)

  • 김규태;장석헌;임준형;주진호;김찬중;홍계원;김혜림;현옥배
    • 한국세라믹학회지
    • /
    • 제42권6호
    • /
    • pp.437-442
    • /
    • 2005
  • We fabricated BSCCO-2212 (2212) bulk superconductor by melt casting process, and evaluated the dependence of the critical properties on the temperature and cooling .ate of mold and the pouring methods of melt. It was observed that the critical current (Ic) of 2212 was significantly dependent on the pre-heating temperature of the mold. At the pre-heating temperature of $500^{\circ}C$ followed by air cooling condition, Ic of 48 A at 77 K was obtained which was higher than others processed at different temperatures. In addition, the Ic improved to 132 A when tilt casting method was applied. The improved Ic is probably due to the fact that the tilt casting reduced a turbulent flow of the melt during casting causing less porosity and more homogeneous microsructure. Critical temperature was measured to be 87-89 K after the first heat treatment and it improved to 90-91 K when subsequently heat treated at $650^{\circ}C$ in a nitrogen atmosphere. This improvement was considered to be due to an optimization of the oxygen content in the range of 8.16-8.2.

The effects of cold treatment on the pupal period, emergence rate, and number of Protaetia brevitarsis larvae spawned

  • JANG, Heeseung;CHOI, Moon Bo;LEE, Hyoki;KIM, Yeongbu;KWON, Ohseok
    • Entomological Research
    • /
    • 제48권6호
    • /
    • pp.550-558
    • /
    • 2018
  • To develop a system for the mass production of Protaetia brevitarsislarvae (Pbl), this study analyzed the oviposition characteristics of third instar Pbl through successive rearing and cold treatments. In the first generation, females laid 50 eggs each on average, and spawned higher numbers of eggs for the first 5 days but then fewer after this. However, all of the $2^{nd}$-generation females that were produced through the successive rearing of eggs from the $1^{st}$ generation did not spawn. When test insects (TI) were raised at $32^{\circ}C$, their $mean{\pm}SE$ pupal period and emergence rate were $28.4{\pm}1.9$ days and 87%, respectively. However, most individuals raised in cold treatments ($5^{\circ}C$ and $-5^{\circ}C$) without a pre-cooling period did not survive. Individuals exposed to a pre-cooling period, however, had a 7-10 days longer pupal period than those raised at $32^{\circ}C$, and their emergence rate (90%) was slightly higher. Different cold treatment temperatures ($0^{\circ}C$, $3^{\circ}C$, or $5^{\circ}C$) and periods (30 or 60 days) were tested in further experiments. The experimental group kept for 30 days at $0^{\circ}C$ and $3^{\circ}C$ had the shortest pupal period of all, and emergence rates exceeded 90% in most groups. With respect to the number of eggs spawned by the second generation females after cold treatments, the experimental groups held in cold treatments at $5^{\circ}C$ for 30 and 60 days were found to spawn the most eggs. Consequently, the experimental group kept at $5^{\circ}C$ for 30 days was the most effective set of conditions tested during the entire breeding period.

인천 LNG지하탱크 Sidewall의 온도균열제어 (Temperature Crack Control about Sidewall of LNG in Inchon)

  • 구본창;김동석;하재담;김기수;최롱;최웅
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1999년도 학회창립 10주년 기념 1999년도 가을 학술발표회 논문집
    • /
    • pp.329-332
    • /
    • 1999
  • The crack of concrete induced by the heat of hydration is a serious problem, particularly in concrete structures such as underground box structure, mat-slab of nuclear reactor buildings, dams or large footings, foundations of high rise buildings, etc.. As a result of the temperature rise and restriction condition of foundation, the thermal stress which may induce the cracks can occur. Therefore the various techniques of the thermal stress control in massive concrete have been widely used. One of them is prediction of the thermal stress, besides low-heat cement which mitigates the temperature rise, pre-cooling which lowers the initial temperature of fresh concrete with ice flake, pipe cooling which cools the temperature of concrete with flowing water, design change which considers steel bar reinforcement, operation control and so on. The objective of this paper is largely two folded. Firstly we introduce the cracks control technique by employing low-heat cement mix and thermal stress analysis. Secondly it show the application condition of the cracks control technique like sidewall of LNG in Inchonl.

  • PDF

Formation of globular clusters in cosmological radiation hydrodynamic simulation

  • Yi, Sukyoung K.;Kimm, Taysun
    • 천문학회보
    • /
    • 제41권2호
    • /
    • pp.36.1-36.1
    • /
    • 2016
  • This is a presentation of the paper published as Kimm et al. 2016, ApJ, 823, 52. We investigate the formation of metal-poor globular clusters (GCs) at the center of two dark matter halos with $Mhalo{\sim}4{\times}107Msun$ at z>10 using cosmological radiation-hydrodynamics simulations. We find that very compact (${\leq}1$ pc) and massive (${\sim}6{\times}105Msun$) clusters form rapidly when pristine gas collapses isothermally with the aid of efficient $Ly{\alpha}$ emission during the transition from molecular-cooling halos to atomic-cooling halos. Because the local free-fall time of dense star-forming gas is very short (${\ll}1Myr$), a large fraction of the collapsed gas is turned into stars before stellar feedback processes blow out the gas and shut down star formation. Although the early stage of star formation is limited to a small region of the central star-forming disk, we find that the disk quickly fragments due to metal enrichment from supernovae. Sub-clusters formed in the fragmented clouds eventually merge with the main cluster at the center. The simulated clusters closely resemble the local GCs in mass and size but show a metallicity spread that is much wider than found in the local GCs. We discuss a role of pre-enrichment by Pop III and II stars as a potential solution to the latter issue. Although not without shortcomings, it is encouraging that a naive blind (not tuned) cosmological simulation presents a possible channel for the formation of at least some massive GCs.

  • PDF

지하철 박스 구조물에서의 온도균열제어 (Temperature Crack Contol in Subway Box Structures)

  • 구본창;김동석;하재담;김기수;최롱;오병환
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1999년도 봄 학술발표회 논문집(I)
    • /
    • pp.293-298
    • /
    • 1999
  • The crack of concrete induced by the heat of hydration is a serious problem, particularly in concrete structures such as underground box structure, mat-slab of nuclear reactor buildings, dams or large footings, foundations of high rise buildings, etc.. As a result of the temperature rise and restriction condition of foundation, the thermal stress which may induce the cracks can occur. Therefore the various techniques of the thermal stress control in massive concrete have been widely used. One of them is prediction of the thermal stress, besides low-heat cement which mitigates the temperature rise, pre-cooling which lowers the initial temperature of fresh concrete with ice flake, pipe cooling which cools the temperature of concrete with flowing water, design change which considers steel bar reinforcement, operation control and so on. The objective of this paper is largely two folded. Firstly we introduce the cracks control technique by employing low-heat cement mix and thermal stress analysis. Secondly it show the application condition of the cracks control technique like the subway structure in Seoul.

  • PDF

건물 적용을 위한 태양열 집열기 기능을 갖는 BIPV 시스템의 기초적 연구 (A Fundamental Study of BIPV System Functioned as Solar Collector for Building Application)

  • 민성혜;서승직
    • 한국태양에너지학회 논문집
    • /
    • 제27권1호
    • /
    • pp.91-98
    • /
    • 2007
  • Perimeter zone is one of the weakest area in buildings and it makes an increase of heating and cooling loads, in addition to condensation or discomfort with cold-draft to residents in winter. Because of this, it needs to be reinforced by active systems. However, they use fossil fuel, and ultimately greenhouse effect is urged. Thus, we proposed BIPV system functioned as solar collector which can substitute active system. As an fundamental stage, heat balance equation in steady-state by Fortran was used not only, in winter for pre-heating effect and electric power capacity during the day, but also in summer, for the latter during the day and sky radiation effect during the night. Especially, we should have considered shading on PV by IES Suncast, since even a little bit of it makes the efficiency too low for the PV modules to work. As a result, in summer day, the PV panel should be tiled in 70 degrees to gain the most electric power. Moreover, we could verify that this model makes higher temperature and heat flux under 0.02 m/s. On the other hand, the PV had the high efficiency with high velocity because of cooling effect behind the PV. Therefore, we should regard the air current distribution later on.

Ti-6Al-4V 합금의 단시간 고온 노출 시 모재 및 용접부의 인장강도 특성 (Effects on Tensile Strength of Base and Weld Metal of Ti-6Al-4V Alloy in Short Time Exposure to High Temperature)

  • 채병찬
    • 한국군사과학기술학회지
    • /
    • 제17권4호
    • /
    • pp.413-421
    • /
    • 2014
  • Since the structural temperature of a flight vehicle flying at high speed rises rapidly due to aerodynamic heating, it is necessary for optimum structural design to obtain proper material properties at high temperature by taking into account of its operational environment. For a special alloy, analysis data on strength change due to exposure time to high temperature are very limited, and most of them are for an exposure time longer than 30 minutes for long term operations. In this study, base and weld metal samples of Ti-6Al-4V alloy had been prepared and high temperature tensile tests with induction heating were performed, and then high temperature strength characteristics and strength recovery characteristics through cooling have been analyzed. Pre-tests to determine maximum heating rate were performed, and response characteristics for temperature control were confirmed. As a result, high temperature tensile strength appeared to be lower than that of room temperature, but it was higher than that of high temperature of 30 minite exposure listed in MMPDS. In strength recovery through cooling Ti-6Al-4V alloy has shown higher recovery rate compared with other alloys.