• Title/Summary/Keyword: power systems

검색결과 13,517건 처리시간 0.041초

A Review of Strategy to Capture Niche Marketing of HTS Power Distribution Cable

  • Park, Sang-Bong;Nam, Kee-Young;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Ryoo, Hee-Suk
    • KIEE International Transactions on Power Engineering
    • /
    • 제4A권1호
    • /
    • pp.11-17
    • /
    • 2004
  • It becomes difficult and high in cost to construct new ducts and/or tunnels for power cables in domestic areas. This paper presents possible strategy of an HTS distribution cables for distributing electric power in local areas as niche marketing. Reflected were its important distinction such as system configuration, rationale, establishment of strategy and considerably high economical efficiency compared with present underground cables. In this paper, applicable important items by using HTS distribution cables in water pumping powerhouse and distribution substation as example objective regions were reviewed. Based on this, the following items on distribution HTS system are examined. (I)A review of constructing a model system to introduce high temperature superconducting distribution cables to objective areas is presented. (2)The strategy to capture HTS distribution cable in water pumping powerhouse and distribution substation as niche marketing regions were reviewed. (3)In concrete, system configuration, rationale, establishment of strategy and considerably high economical efficiency are reviewed between existing cable and HTS one.

Study on Multi-scale Unit Commitment Optimization in the Wind-Coal Intensive Power System

  • Ye, Xi;Qiao, Ying;Lu, Zongxiang;Min, Yong;Wang, Ningbo
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권6호
    • /
    • pp.1596-1604
    • /
    • 2013
  • Coordinating operation between large-scale wind power and thermal units in multiple time scale is an important problem to keep power balance, especially for the power grids mainly made up of large coal-fired units. The paper proposes a novel operation mode of multi-scale unit commitment (abbr. UC) that includes mid-term UC and day-ahead UC, which can take full advantage of insufficient flexibility and improve wind power accommodation. First, we introduce the concepts of multi-scale UC and then illustrate the benefits of introducing mid-term UC to the wind-coal intensive grid. The paper then formulates the mid-term UC model, proposes operation performance indices and validates the optimal operation mode by simulation cases. Compared with day-ahead UC only, the multi-scale UC mode could reduce the total generation cost and improve the wind power net benefit by decreasing the coal-fired units' on/off operation. The simulation results also show that the maximum total generation benefit should be pursued rather than the wind power utilization rate in wind-coal intensive system.

Cascaded Multi-Level Inverter Based IPT Systems for High Power Applications

  • Li, Yong;Mai, Ruikun;Yang, Mingkai;He, Zhengyou
    • Journal of Power Electronics
    • /
    • 제15권6호
    • /
    • pp.1508-1516
    • /
    • 2015
  • A single phase H-bridge inverter is employed in conventional Inductive Power Transfer (IPT) systems as the primary side power supply. These systems may not be suitable for some high power applications, due to the constraints of the power electronic devices and the cost. A high-frequency cascaded multi-level inverter employed in IPT systems, which is suitable for high power applications, is presented in this paper. The Phase Shift Pulse Width Modulation (PS-PWM) method is proposed to realize power regulation and selective harmonic elimination. Explicit solutions against phase shift angle and pulse width are given according to the constraints of the selective harmonic elimination equation and the required voltage to avoid solving non-linear transcendental equations. The validity of the proposed control approach is verified by the experimental results obtained with a 2kW prototype system. This approach is expected to be useful for high power IPT applications, and the output power of each H-bridge unit is identical by the proposed approach.

실용적인 원전공학 교육을 위한 시스템즈 엔지니어 프로그램 (Systems Engineer Program for Practical Nuclear Power Plant Engineering Education)

  • 장중구;정재천
    • 시스템엔지니어링학술지
    • /
    • 제11권2호
    • /
    • pp.31-40
    • /
    • 2015
  • KEPCO International Nuclear Graduate School (KINGS) is dedicated to nurturing leadership-level professionals in nuclear power plant (NPP) engineering. KINGS have designed curriculum based on two philosophies. First, we balance aspects of discipline engineering, specialty engineering, and management engineering in the framework of systems engineering. Second, KINGS have designed the curriculum so that students can learn and experience the know-what, know-how and know-why level knowledge of NPP engineering and management. The specialization programs are opened during the 2nd year for 3 trimesters and those are a process of learning through practical project courses. The objectives of the specialization programs are to help students to learn the NPP life cycle technologies in highly structured and systematic ways. The systems engineer program (SEP) is one of the specialization programs. A practical case of the SEP which was applied to the project course for the NPP electric power system design education will be elaborated in this paper.

PHEV 시스템의 분석을 통한 신 PHEV 동력 시스템 제안 (Proposal of a Novel Plug-in-hybrid Power System Based on Analysis of PHEV System)

  • 김진성;박영일
    • 한국자동차공학회논문집
    • /
    • 제23권4호
    • /
    • pp.436-443
    • /
    • 2015
  • In order to develop the PHEV(plug-in hybrid electric vehicle), the specific power transmission systems considering the PHEV system characteristics should be applied. A PHEV applied to series-parallel type hybrid power transmission system is a typical example. In this paper, the novel hybrid power systems are proposed by analyzing the existing PHEV system. The backward simulation program is developed to analyze the fuel efficiency of hybrid power system. Quasi-static models for each components such as engine, motor, battery and vehicle are included in the developed simulation program. To obtain an optimal condition for hybrid systems, an optimization approach called the dynamic programming is applied. The simulation is performed in various driving cycles. A weakness for the existing system is found through the simulation. To compensate for a discovered weakness, novel hybrid power systems are proposed by adding or moving the clutch to the existing system. Comparing the simulation results for each systems, the improved fuel efficiency for proposed systems are verified.

장주기 대용량 전력저장장치의 부하이전에 대한 실계통 적용 경제성 평가 연구 (An Economic Assessment of Large-scale Battery Energy Storage Systems in the Energy-Shift Application to Korea Power System)

  • 박종배;박용기;노재형;장병훈;윤용범
    • 전기학회논문지
    • /
    • 제64권3호
    • /
    • pp.384-392
    • /
    • 2015
  • This paper presents an economic assessment of large-scale Li-ion battery energy storage systems applied to Korean power system. There are many applications of the battery energy storage systems (BESSs) and they can provide various benefits to power systems. We consider BESSs to the energy time-shift application to Korean power system and evaluate the benefits from the application of BESS in the social perspective. The mixed integer programming (MIP) algorithm is used to resolve the optimal operation schedule of the BESS. The social benefits can include the savings of the fuel cost from generating units, deferral effects of the generation capacity, delay of transmission and distribution infra construction, and incremental CO2 emission cost impacts, etc. The economic evaluation of the BESS is separately applied into Korean power systems of the Main-land and Jeju island to reflect the differences of the load and generation patterns.

인천국제공항 공항전력정보시스템 설계 (Airport Power Information System Design in the Inchon Inta'l Airport)

  • 오영달;민성준;임정규;문정호;이태식;윤태혁;김문호;문영현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1121-1124
    • /
    • 1998
  • Inchon International Airport(IIA) is constructed for Northeast Asia Gate as is important for IIA to become a 21 century's leader in the world, as is planned for open at december 2000 as a important economic link for unified korea. Airport Power Information System(APIS) is designed through investigation of advanced domestic and international example. In addition to power facility operation it is designed for using an information infrastructure of whole airport. APIS is newly designed for uninterupted power supply, effective power management, information infrastructure's construction. making a profit by positively introduction of new technology for collection and conservation of power related data, correlation with airport infra systems, data interrelative arrangement about related systems like outdoor lighting system and automatic measuring record, CCTV systems for remote power facility monitoring, and promotion of management ability in the emergency status.

  • PDF

A Systems Engineering Approach to Multi-Physics Load Follow Simulation of the Korean APR1400 Nuclear Power Plant

  • Mahmoud, Abd El Rahman;Diab, Aya
    • 시스템엔지니어링학술지
    • /
    • 제16권2호
    • /
    • pp.1-15
    • /
    • 2020
  • Nuclear power plants in South Korea are operated to cover the baseload demand. Hence they are operated at 100% rated power and do not deploy power tracking control except for startup, shutdown, or during transients. However, as the contribution of renewable energy in the energy mix increases, load follow operation may be needed to cover the imbalance between consumption and production due to the intermittent nature of electricity produced from the conversion of wind or solar energy. Load follow operation may be quite challenging since the operators need to control the axial power distribution and core reactivity while simultaneously conducting the power maneuvering. In this paper, a systems engineering approach for multi-physics load follow simulation of APR1400 is performed. RELAP5/SCDAPSIM/MOD3.4/3DKIN multi-physics package is selected to simulate the Korean Advanced Power Reactor, APR1400, under load follow operation to reflect the impact of feedback signals on the system safety parameters. Furthermore, the systems engineering approach is adopted to identify the requirements, functions, and physical architecture to provide a set of verification and validation activities that guide this project development by linking each requirement to a validation or verification test with predefined success criteria.

Experiences with Simulation Software for the Analysis of Inverter Power Sources in Arc Welding Applications

  • Fischer W.;Mecke H.;Czarnecki T.K.
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2001년도 Proceedings ICPE 01 2001 International Conference on Power Electronics
    • /
    • pp.731-736
    • /
    • 2001
  • Nowadays various simulation tools are widely used for the design and the analysis of power electronic converters. From the engineering point of view it is rather difficult to parameterize power semiconductor device models without the knowledge of basic physical parameters. In recent years some data sheet driven behavioral models or so called 'wizard' tools have been introduced to solve this problem. In this contribution some experiences with some user-friendly power semiconductor models will be discussed. Using special simulation test circuits it is possible to get information on the static and dynamic behavior of the parameterized models before they are applied in more complex schemes. These results can be compared with data sheets or with measurements. The application of these models for power loss analysis of inverter type arc welding power sources will be described.

  • PDF

시화 조력발전 접속에 따른 발전량 예측 (Generation Forecast for Integrating Sihwa Tidal Power into Power Systems)

  • 김규호;송경빈;권석기;김태훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.375-377
    • /
    • 2006
  • This paper presents a method to calculate generation power for integrating Sihwa tidal power into power systems. The sea levels of 1 minute interval using cubic interpolation based on the forecasted levels of high and low water offered from Nori(National Oceanographic Research Institute) are calculated. If the sea level is greater than the lake level and the difference between sea level and lake level at high tide is over the default value, it begins to calculate the tidal power. It is seen that tidal power can supply power to demand side stably and economically from assessment of effect for integrating tidal power into power systems.

  • PDF