• 제목/요약/키워드: power system restoration

검색결과 167건 처리시간 0.029초

배전선로 회선별단선도 자동생성 알고리즘 (An Auto-drawing Algorithm for the Single Line Diagram of Distribution Systems)

  • 손주환;임성일
    • 전기학회논문지
    • /
    • 제59권5호
    • /
    • pp.854-859
    • /
    • 2010
  • Distribution Automation System(DAS) is designed to improve operational efficiency by acquisition and control of remote data using its components such as central computation units, communication network and feeder remote terminal units. A conventional human machine interface of the DAS adopts a schematic diagram which is made by drawing power equipments on the geographic information system map. The single line diagram is more useful than the schematic diagram for the main tasks of distribution system operation such as protective relay coordination, service restoration and loss minimization. Since the configuration of the distribution line is changed according to the relocation of the open tie switches, the auto-drawing algorithm based on the connection between the sections and the switches is an essential technique. This paper proposes a new auto-drawing algorithm for a single line diagram of distribution systems based on tertiary tree and collision avoidance method. The feasibility of the proposed algorithm has been testified for various cases using practical distribution system with 12 feeders.

배전 계통에서의 고장점 진단 전문가 시스템 개발 (An Exper System for Dignosis of Fault Location on Electric Power Distribution System)

  • 진보건;이덕수;이승재;강상희;최면송;안복신;윤남선
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.319-321
    • /
    • 2001
  • When the fault occurred at distribution system, the restoration was late. There are 2 reasons The one is the error of fault location the other is multiple possible candidates of fault location. This paper presents two of new techniques for diagnosing fault regions. The proposed diagnosis scheme is capable of accurately identifying the location of fault upon its occurrence. based on the integration of information available from protective devices and measured load current change at the substation. In this paper expert system for real fault region is presented using these facts. Testing of the developed system using EMTP Simulation Model has demonstrated.

  • PDF

Hierarchical Control Scheme for Three-Port Multidirectional DC-DC Converters in Bipolar DC Microgrids

  • Ahmadi, Taha;Hamzeh, Mohsen;Rokrok, Esmaeel
    • Journal of Power Electronics
    • /
    • 제18권5호
    • /
    • pp.1595-1607
    • /
    • 2018
  • In this paper, a hierarchical control strategy is introduced to control a new three-port multidirectional DC-DC converter for integrating an energy storage system (ESS) to a bipolar DC microgrid (BPDCMG). The proposed converter provides a voltage-balancing function for the BPDCMG and adjusts the states of charge (SoC) of the ESS. Previous studies tend to balance the voltage of the BPDCMG buses with active sources or by transferring power from one bus to another. Furthermore, the batteries available in BPDCMGs were charged equally by both buses. However, this power sharing method does not guarantee efficient operation of the whole system. In order to achieve a higher efficiency and lower energy losses, a triple-layer hierarchical control strategy, including a primary droop controller, a secondary voltage restoration controller and a tertiary optimization controller are proposed. Thanks to the multi-functional operation of the proposed converter, its conversion stages are reduced. Furthermore, the efficiency and weight of the system are both improved. Therefore, this converter has a significant capability to be used in portable BPDCMGs such as electric DC ships. The converter modes are analyzed and small-signal models of the converter are extracted. Comprehensive simulation studies are carried out and a BPDCMG laboratory setup is implemented in order to validate the effectiveness of the proposed converter and its hierarchical control strategy. Simulation and experimental results show that using the proposed converter mitigates voltage imbalances. As a result, the system efficiency is improved by using the hierarchical optimal power flow control.

LFG Utilization in Hong Kong (Case study of the Shuen Wan and Urban Landfills)

  • Lloyd, Bryce;Chan, Louis;Nardelli, Ray;Sullivan, Kevin
    • 한국자원리싸이클링학회:학술대회논문집
    • /
    • 한국자원리싸이클링학회 2001년도 정기총회 특별강연 및 춘계학술연구발표회(2)
    • /
    • pp.85-91
    • /
    • 2001
  • This paper provides a case study of landfill gas (LFG) utilization fer direct use as process fuel, and for electrical power generation at restored landfills in the Hong Kong Special Administrative Region of China (HKSAR). The paper specifically covers the LFG utilization schemes, which are required under landfill restoration contracts at the Shuen Wan and Urban Landfills. These contracts provide for the restoration and aftercare of six landfills, and are administered by the Environmental Protection Department (EPD) of the Hong Kong Government. The LFG utilization scheme at the Shuen Wan Landfill incorporates the direct use of LFG by compressing and dehumidifying the LFG prior to conveyance through a 1.6-kilometer (1-mile) pipeline. The pipeline provides an alternate fuel source to naphtha during process heating for gas production at the Tai Po Gas Production Plant of the Hong Kong and China Gas Limited (HKCC). The LFG utilization scheme at the Jordan Valley Landfill (one of the Urban Landfills) beneficially uses the LFG as fuel for electrical power generation with reciprocating internal combustion engines. The LFG is compressed, cooled, and filtered prior to delivery to two engine/generator sets. This system provides power to operate the leachate pre-treatment plant, which processes leachate from all of the Urban Landfill sites. The case study will examine the technical and non-technical considerations, including harriers, for developing, designing and implementing the LFG utilization projects in Hong Kong. Specific regulatory considerations and external governmental agency approvals are discussed, including the requirement to register as a gas-producing utility. While the paper focuses on LFG utilization applications in Hong Kong, many of the considerations discussed are also applicable to development of LFG utilization in other regions of Asia.

  • PDF

PSCADI/EMTDC를 이용한 시송전계통의 고조파 공진현상 분석 II (Analysis of the Harmonic Resonance of Primary Restorative Transmission System Using PSCAD/EMTDC PART II)

  • 이흥재;유원근;이경섭;박성민
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.48-50
    • /
    • 2004
  • The energization of high voltage transmission lines and transformers, that is an inevitable process in most countries as the first restorative action for wide-area blackout, may induce overvoltages such as sustained overvoltage, transient overvoltage and harmonic resonant overvoltage. And these may cause damages to power system equipments or failure of surge arresters. The harmonic resonant overvoltage originates in switching operations and nonlinear characteristics of equipments. Actually it is difficult to predict the occurrence of harmonic overvoltage, since they result from nonlinear characteristics of transformers and other equipments. This paper describes the analysis of domestic primary restorative transmission system using PSCAD/EMTDC. The harmonic resonance is verified and the solution to prevent harmonic resonance is proposed in this paper. As a result, the PSCAD/EMTBC simulation showed slightly conflictive results that had been presented by IEEE Power System Restoration Working Group report.

  • PDF

3상 3선식 Plug-In MCCB의 인장력 및 접촉저항 평가에 관한 연구 (Study on the Evaluation of the Tension and Contact Resistance of a 3 Φ 3 W Plug-In MCCB)

  • 이병설;최충석
    • 한국안전학회지
    • /
    • 제28권4호
    • /
    • pp.43-47
    • /
    • 2013
  • The purpose of this paper is to evaluate the performance of a Plug-In MCCB developed for rapid power supply restoration when the MCCB is installed in a power system and to verify its reliability. Since the developed 3 ${\Phi}$ 3 W Plug-In MCCB can be installed on and removed from a bus bar by one touch using a plug housed at the rear, it can be replaced in a short period of time. Therefore, it can quickly respond to the normalization of a power system. When the Plug-In MCCBB is installed on a bus bar, the resistance between each phase and plug was measured to be 0.46 $m{\Omega}$ in average. When the Plug-In MCCB is installed, the tension in the vertical direction was measured to be 112.78 N in average, which is greater than the tension of 50 N specified in the related regulation. The withstanding voltage tests performed 5 times repeatedly by applying 6 kV to the developed Plug-In MCCB for 60 seconds shows good withstanding voltage characteristics. In addition, both the general waterproof test using a water injection method and the insulation resistance analysis using a Mega meter showed good waterproof and insulation characteristics.

지역급전원을 위한 고장복구교육시스템 GUI 및 자동 DB 시스템 개발 (Development of the Power System Restoration and Training system GUI and Auto DB System for the System Dispatcher)

  • 정광호;윤병주;최승일;송인준;이남호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.246-247
    • /
    • 2006
  • 전력계통에 발생되는 사고 및 이상 현상에 대해한 계통운용자의 빠르고 정확한 복구 조치 능력 향상을 위해서 사전에 모의 훈련을 통한 교육이 절실히 필요하고 교육시스템의 활용을 통해 광역정전 시 전력계통운용원의 사고 조치 능력의 향상을 도모하고 이를 통해 대규모 정전으로 인한 경제적 손실과 사회적 혼란 감소하고자 고장복구 교육시스템이 필요하다. 본 논문에서는 지역급전원이 사전모의 할 수 있는 전력계통 고장복구 교육시스템의 효과적인 GUI(Graphical User Interface) 대해서 설명한다.

  • PDF

2009년 전계통 정전시 전력계통 복구계획 수립에 관한 연구 (Study on establishing 2009 System Restoration Plan)

  • 전재룡;송광헌
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.129_130
    • /
    • 2009
  • 우리나라는 전계통 정전 또는 광역 정전에 대비하여 매년 전계통정전시복구계획을 수립하고 있다. 우리나라는 다른 나라와 연계되지 않은 단독계통으로 전계통 정전이 발생할 경우 외부 수전을 활용하여 복구를 진행할 수 없다. 따라서 전국을 7개 지역으로 나눠서 13개 자체기동발전기를 지정하여 운영하고 있다. 각 지역은 주 시송전계통과 예비 시송전계통을 지정하여 주 시송전계통이 휴전 또는 고장으로 가압불가시 예비 시송전계통을 활용하여 가압하도록 하여 신뢰도를 높이고 있다. 2009년부터는 EMTP-RV를 활용하여 차과도상태를 검토하여 신뢰도를 더욱 높일 계획이다.

  • PDF

배전자동화 시스템의 FI 오류에 대한 개선 알고리즘 적용 (Application of Algorithm for Improving FI Error in DAS)

  • 임일형;최면송;윤준석;안태풍
    • 전기학회논문지
    • /
    • 제59권6호
    • /
    • pp.1025-1033
    • /
    • 2010
  • This paper proposes a method to improve and analysis error cause of FI(Fault Indicator) information to be used for detecting fault section in distribution automation system. FI error cause is made by consideration fault current magnitude and time. So, a new method to prevent FI error is proposed to include fault current magnitude, time and direction. Therefore, it's considered network environments that grounded and ungrounded network in distribution automation system. The proposed method is proved by Matlap Simulink. By the result in this research, it's possible to quickly restoration, supplying stability and reliability power to customer.

Binary Power Amplifier with 2-Bit Sigma-Delta Modulation Method for EER Transmitter

  • Lim, Ji-Youn;Cheon, Sang-Hoon;Kim, Kyeong-Hak;Hong, Song-Cheol;Kim, Dong-Wook
    • ETRI Journal
    • /
    • 제30권3호
    • /
    • pp.377-382
    • /
    • 2008
  • A novel power amplifier for a polar transmitter is proposed to achieve better spectral performance for a wideband envelope signal. In the proposed scheme, 2-bit sigma-delta (${\Sigma}{\Delta}$) modulation of the envelope signal is introduced, and the power amplifier configuration is modified in a binary form to accommodate the 2-bit digitized envelope signals. The 2-bit ${\Sigma}{\Delta}$ modulator lowers the noise of the envelope signal by fine quantization and thus enhances the spectral property of the RF signal. The Ptolemy simulation results of the proposed structure show that the spectral noise is reduced by 10 dB in a full transmit band of the EDGE system. The dynamic range is also enhanced. Since the performance is improved without increasing the over-sampling ratio, this technique is best suited for wireless communication with high data rates.

  • PDF