• 제목/요약/키워드: power shutdown

검색결과 301건 처리시간 0.033초

강풍 시 전력망 연계기준을 만족하는 해상풍력발전단지 강제종료 방법 (Supervised Shutdown of an Off-shore Wind Farm to meet the Grid Code in a Storm-driven Situation)

  • 유약;김연희;정태영;강용철
    • 전기학회논문지
    • /
    • 제60권7호
    • /
    • pp.1299-1304
    • /
    • 2011
  • A wind turbine (WT) should be shut down as fast as possible to minimize its own damage in a storm-driven situation. Shutdown of a large wind farm requires a power grid to have a ramp-up capability large enough to balance between generation and consumption of electrical energy. This paper proposes a supervised shutdown algorithm of a wind farm to meet a required ramp-down rate in a grid code in the case of a storm-driven situation. The information on the speed and the direction of wind is measured at a wind mast (WM) installed around a wind farm. If the wind speed exceeds a cut-out speed, the number of WTs to be shut down simultaneously is decided to meet a required ramp-down rate of a grid-code. Arrival times to each WT from the WM are calculated and sorted in the order of time. Then a sequence of groups is generated. The shutdown start/end times of each group are decided to avoid superposition between adjacent two groups. The performance of the proposed shutdown algorithm is verified under various storm scenarios. Results indicate that the proposed algorithm can not only protect the wind farm in the case of a storm-driven situation but also meet the required ramp-down rate. In addition, the algorithm can produce more energy than that of a conventional shutdown algorithm.

원전 케이블 화재 열속평가 및 열화 진단방법에 관한 연구 (A Study on Heat-Flux Evaluation for Cable Fire Including Diagnostic Methodology for Degradation in Nuclear Power Plants)

  • 임혁순;김두현
    • 한국안전학회지
    • /
    • 제26권2호
    • /
    • pp.20-25
    • /
    • 2011
  • The fire event occurred in fire proof zone often causes serious electrical problems such as shorts, ground faults, or open circuits in nuclear power plants. These would be directed to the loss of safe shutdown capabilities performed by safety related systems and equipments. The fire event can treat the basic design principle that safety systems should keep their functions with redundancy and independency. In case of a multi-core cable fire, operators can not perform their mission properly and can misjudge the situation because of spurious operation, wrong indication or instrument. These would deteriorate the plant capabilities of safety shutdown and make disastrous conditions. In this paper, the characteristic of cable fire is investigated and the heat-flux evaluation for cable fire is studied. Moreover, a diagnostic methodology for degraded cable in nuclear power plants is presented.

Evaluation of Shutdown LOCA for OPR1000

  • Choi, Han-Rim;Kim, Se-Chang;Kim, Eun-Kee;Yoon, Duk-Joo;Jun, Hwang-Yong
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 2005년도 춘계학술발표회
    • /
    • pp.577-578
    • /
    • 2005
  • PDF

Decay Heat Evaluation of Spent Fuel Assemblies in SFP of Kori Unit-1

  • Kim, Kiyoung;Kim, Yongdeog;Chung, Sunghwan
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2018년도 추계학술논문요약집
    • /
    • pp.104-104
    • /
    • 2018
  • Kori Unit 1 is the first permanent shutdown nuclear power plant in Korea and it is on June 18th, 2017. Spent fuel assemblies began to be discharged from the reactor core to the spent fuel pool(SFP) within one week after shutdown of Kori unit 1 and the campaign was completed on June 27th, 2017. The total number of spent nuclear fuel assemblies in SFP of Kori Unit-1 is 485 and their discharging date is different respectively. So, decay heat was evaluated considering the actual enrichment, operation history and cooling time of the spent fuel assemblies stored in SFP of the Kori Unit-1. The code used in the evaluation is the ORIGEN-based CAREPOOL system developed by KHNP. Decay heat calculation of PWR fuel is based on ANSI/ANS 5.1-2005, "Decay heat power in light water reactors" and ISO-10645, "Nuclear energy - Light water reactors - Calculation of the decay heat power in nuclear fuels. Also, we considered the contribution of fission products, actinide nuclides, neutron capture and radioactive material in decay heat calculation. CAREPOOL system calculates the individual and total decay heat of all of the spent fuel assemblies in SFP of Kori Unit-1. As a result, the total decay heat generated in SFP on June 28th, 2017 when the spent fuel assemblies were discharged from the reactor core, is estimated to be about 4,185.8 kw and to be about 609.5 kw on September 1st, 2018. It was also estimated that 119.6 kw is generated in 2050 when it is 32 years after the permanent shutdown. Figure 1 shows the trend of total decay heat in SFP of Kori Unit-1.

  • PDF

도플러 센서를 적용한 대기전력 자동 차단복구 장치 (Development of Automatic Shutdown and Recovery Device for Standby Power using Doppler Sensor)

  • 박양재
    • 디지털융복합연구
    • /
    • 제17권10호
    • /
    • pp.243-249
    • /
    • 2019
  • 본 논문에서는 사용하지 않는 전기제품에서 불필요하게 소비되는 대기전력을 절감하기 위한 장치를 개발하였다. 도플러 센서를 사용하여 사람이 콘센트 주변에 존재 유무에 따라 콘센트의 전원공급과 차단을 자동으로 수행하는 장치이다. 도플러 센서는 동축 케이블 트랩을 사용하여 송신 안테나를 설계하였으며 10GHz 대역의 RF신호를 방사하여 대상 물체로부터 반사된 파장이 변화된 반사파 신호를 수신부로 수신하여 물체를 감지하여 사람의 접근을 인지하도록 하였다. 대기전력을 자동으로 차단 및 복구하여 불필요한 전력소모를 방지하여 에너지를 절약하고 누설전류에 의한 대형 화재의 위험성을 방지할 수 있는 대기전력 자동 차단 및 복구 장치를 개발하였다.

Energy Use Coordinator for Multiple Personal Sensor Devices

  • Rhee, Yunseok
    • 한국컴퓨터정보학회논문지
    • /
    • 제22권2호
    • /
    • pp.9-19
    • /
    • 2017
  • Useful continuous sensing applications are increasingly emerging as a new class of mobile applications. Meanwhile, open, multi-use sensor devices are newly adopted beyond smartphones, and provide huge opportunities to expand potential application categories. In this upcoming environment, uncoordinated use of sensor devices would cause severe imbalance in power consumption of devices, and thus result in early shutdown of some sensing applications depending on power-hungry devices. In this paper, we propose EnergyCordy, a novel inter-device energy use coordination system; with a system-wide holistic view, it coordinates the energy use of concurrent sensing applications over multiple sensor devices. As its key approach, we propose a relaxed sensor association; it decouples the energy use of an application from specific sensor devices leveraging multiple context inference alternatives, allowing flexible energy coordination at runtime. We demonstrated the effectiveness of EnergyCordy by developing multiple example applications over custom-designed wearable senor devices. We show that EnergyCordy effectively coordinates the power usage of concurrent sensing applications over multiple devices and prevent undesired early shutdown of applications.

원자력 발전소 RCB 내 중요배관의 KEPIC 코드에 의한 내진 안전성 설계 (A Seismic Stability Design by the KEPIC Code of Main Pipe in Reactor Containment Building of a Nuclear Power Plant)

  • 이형복;이진규;강태인
    • 한국정밀공학회지
    • /
    • 제28권2호
    • /
    • pp.233-238
    • /
    • 2011
  • In piping design of nuclear power plant facilities, the load stress according to self-weight is important for design values in test run(shutdown and starting). But sometimes it needs more studies, such as seismic analysis of an earthquake of power plant area and fatigue life and stress of thermal expansion and anchor displacement in operating run. In this paper, seismic evaluations were performed to nuclear piping system of Shin-Kori NO. 3&4 being built in Pusan lately. Results of seismic analysis are evaluated on basis of KEPIC MN code. The structural integrity on RCB piping system was proved.