• Title/Summary/Keyword: power of test

Search Result 10,072, Processing Time 0.044 seconds

The Study on the Temperature Distribution for 154kV Power Transformers (154kV 전력용 변압기의 온도분포에 관한 연구)

  • Woo, Jung-Wook;Koo, Kyo-Sun;Kwak, Joo-Sik;Kim, Kyung-Tak;Kweon, Dong-Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.9
    • /
    • pp.56-61
    • /
    • 2011
  • The temperature of power transformers is very important factor for power system operation in substation because load capacity and limited lifetime of power transformers are determined by winding temperature. Also, The temperature of power transformers varies with the structure, capacity, operation condition and manufacturers. Thus, it is necessary for temperature distribution to be exactly investigated because of efficient load management and prediction of limited lifetime. Nevertheless, there was no case of analysis as well as measurement of the temperature of power transformers. In this paper, we manufactured the 154kV standard power transformer for the test. And we measured the temperature by the heat run test and analyzed the temperature distribution of transformer.

Study on Development & Implementation of Online Generator Frequency Response Test (On-line 발전기 주파수응답시험 개발 및 적용에 관한 연구)

  • Oh, Chang-Soo;Kwak, Wol-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.48-49
    • /
    • 2006
  • Recently, Importance of Generator's Active/Reactive Power Control Capability is highly emphasized for prevention of Large Blackout. Especially, Generator's frequency Response Capability is important to the Power System Frequency Stability. This paper deals with the Development & Implementation of Each Generator Frequency Response Capability Test via the Injection of Artificial Frequency to the Online Generator. Actual On-line Generator's frequency Response Test was successfully implemented to 13 Generator having various fuel source.

  • PDF

The correlation between the physical power of golf players and the Titleist Performance Institute Level 1 test

  • Kim, Jaeeun;Yim, Jongeun;Do, Kwangsun
    • Physical Therapy Rehabilitation Science
    • /
    • v.7 no.1
    • /
    • pp.13-17
    • /
    • 2018
  • Objective: This was a correlation study for predicting the power to improve the distance of golf players and developing an effective power program. Design: Cross-sectional study. Methods: The subjects of this study were 24 healthy males and females in their 20s and 30s who were golf athletes living in Seoul and Gyeonggi-do. In the Titleist Performance Institute (TPI) Level 1 test, the twelve swing characteristics include components of stability, mobility, body conditioning ability, and balance. The power test consisted of a vertical jump (VJ) in order to examine the power of the lower body, the seated chest pass (SCP) was used to examine upper body power, and the sit up and throw (SUAT) was used to examine the power of the upper body and core for the TPI Level 2 test. Results: The results of this study showed that the 90/90 was correlated with VJ, SUAT, and SCP scores (p<0.05). Single leg stance was correlated with VJ, SUAT, over head deep squat, and bridge with leg extension were correlated with VJ (p<0.05). The toe touch was correlated with SUAT results (p<0.05). Conclusions: The results of this study showed that the TPI Level 1 test and power test were correlated with the performance of the golf players. Future studies have shown that fitness program development and further research are needed.

Seismic Qualification Test on Motor Control Center for Use in Nuclear Power Plants (원자력발전소용 Motor Control Center의 내진검증시험)

  • 김병현
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1997.04a
    • /
    • pp.217-224
    • /
    • 1997
  • The safety related equipments for use in nuclear power plants should be subjected to the seismic qualification in order to insure the safety of the nuclear power plant. This paper summarizes the seismic qualification test on the Low Voltage Motor Control Centers(MCC's) for use in Wolsong Nuclear Power Plants, Units 2, 3 and 4. The seismic qualification test was performed on the two prototype MCC's(a two-bay wide unit for Phase #1 Test and a five-bay wide unit for Phase #2 Test). The specimens were electrically powered and monitored during the test process. It was demonstrated that the specimens possessed sufficient structural and electrical integrity to withstand the required seismic conditions.

  • PDF

Loss of a Main Feedwater Pump Test Simulation Using KISPAC Computer Code

  • Jeong, Won-Sang;Sohn, Suk-Whun;Seo, Ho-Taek;Seo, Jong-Tae
    • Nuclear Engineering and Technology
    • /
    • v.28 no.3
    • /
    • pp.265-273
    • /
    • 1996
  • Among those tests performed during the Yonggwang Nuclear Power Plant Units 3 and 4 (YGN 3&4) Power Ascension Test period, the Loss of a Main Feedwater Pump test at l00% power is one of the major test which characterize the capability of YGN 3&4. In this event, one of the two normally operating main feedwater pumps is tripped resulting in a 50% reduction in the feedwater flow. Unless the NSSS and Turbine/Generator control systems actuate properly, the reactor will be tripped on low SG water level or high pressurizer pressure. The test performed at Unit 3 was successful by meeting all acceptance criteria, and the plant was stabilized at a reduced power level without reactor trip. The measured test data for the major plant parameters are compared with the predictions made by the KISPAC computer code, an updated best-estimate plant performance analysis code, to verify and validate its applicability. The comparison results showed good agreement in the magnitude as well as the trends of the major plant parameters. Therefore, the KISPAC code can be utilized for the best-estimate nuclear power plant design and simulation tool after a further verification using other plant test data.

  • PDF

The Development and Experimental Evaluation of 100kVA Unified Power Quality Conditioner interconnected to the Li-Battery System (리튬 배터리를 연계한 100kVA UPQC 개발 및 성능시험)

  • Lee, Hak-Ju;Chae, Woo-Kyu;Park, Jung-Sung;Sohn, Jin-Man;Choi, Eun-Sik
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.10
    • /
    • pp.102-110
    • /
    • 2012
  • This paper propose the advanced topology of UPQC, its DC link is connected with Lithium battery, to compensate the momentary interruptions. The proposed system can be operated as UPS mode using the parallel inverter, which control the charge or discharge of battery, in case of the interruption. We dvelop 100kVA UPQC using the proposed topology to rise the power quality and the reliability of Microgrid. We verify its usefulness through voltage compensation test, UPS operation test and etc. using Microgrid test facility.

The Mock-Up Test for Applying Rebar Modularization to the Wall of Nuclear Power Plant (원전 벽체구조물의 철근모듈화 적용을 위한 Mock-Up 실험연구)

  • Lee, Byung-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.7-8
    • /
    • 2016
  • We are developing the technology for applying the Rebar Modularization Method to the Nuclear Power Plant Structures. To achieve this, we had developed the elementary technology for applying this method to Nuclear Power Plant Structures efficiently and performed the Mock-Up Test by using the developed elementary technology. By analysing this test result, we deduced the problems and found solutions to solve them.

  • PDF

Dynamic Performance Test of Power Transformer Protective Relay using 345kV Transformer Modelling of PSCAD/RTDS (PSCAD/RTDS에서 345kV 변압기 모델링을 통한 변압기용 보호계전기의 동특성 시험)

  • Kwon, Gi-Baek;Kim, Cjul-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.120-123
    • /
    • 2005
  • This paper, for the establishment of power system models and test procedures for the dynamic performance test of transformer protective relay, presents power system model, environment establishement between RTDS and protective relay, and the dynamic performance test generated internal fault or external fault.

  • PDF

Testing Items Change on Characteristics of Protective relays (보호계전기 특성시험기술의 시험항목 변화)

  • Jang, Byung-Tae;Lee, Nam-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.161-162
    • /
    • 2008
  • The steady state performance test for the digital protective relay using general relay test equipment has been main test methods. Because of the development of advanced power system testing equipments, dynamic performance test has been carried out additionally using a digital simulator such as RTDS(Real Time Digital Simulator). For the case of newly adopted digital protective relay with IEC 61850 and network, performance testing items need supplementing. This report displays testing items change according to newly protective relay.

  • PDF

Performance Evaluation with Protective Function test of Inverter for Solar Power Generation (태양광발전용 인버터 보호기능시험 성능평가)

  • Yoon, Yong-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.11
    • /
    • pp.1570-1575
    • /
    • 2018
  • The increased penetration of PV is impacting on grid operation and in particular the voltage within the local grid can be significantly influenced by the various PV systems. The increased penetration of PV is impacting on grid operation and in particular the voltage within the local grid can be significantly influenced by the various PV systems. This paper describes domestic technical standard of Photovoltaic(PV) PCS(Power Conditioning Systems)- Characteristics of the utility interface. Especially protective function test items of 1) Output overvoltage protection test, 2) Output undervoltage protection test, 3) Frequency rise protection test, 4) Frequency fall protection test, 5) System voltage's momentary interruptions, 6) System voltage distortion capability test. Therefore in this paper protective function test item of facilities evaluation detailed standards for new renewable energy, small, medium and large photovoltaic inverter standard is studied and analyzed and finally full tested by PV inverter performance function.