• Title/Summary/Keyword: power distribution system

Search Result 3,026, Processing Time 0.03 seconds

New Fault Location Algorithms by Direct Analysis of Three-Phase Circuit Using Matrix Inverse Lemma for Unbalanced Distribution Power Systems

  • Park, Myeon-Song;Lee, Seung-Jae
    • KIEE International Transactions on Power Engineering
    • /
    • v.3A no.2
    • /
    • pp.79-84
    • /
    • 2003
  • Unbalanced systems, such as distribution systems, have difficulties in fault locations due to single-phase laterals and loads. This paper proposes new fault locations developed by the direct three-phase circuit analysis algorithms using matrix inverse lemma for the line-to-ground fault case and the line-to-line fault case in unbalanced systems. The fault location for balanced systems has been studied using the current distribution factor, by a conventional symmetrical transformation, but that for unbalanced systems has not been investigated due to their high complexity. The proposed algorithms overcome the limit of the conventional algorithm using the conventional symmetrical transformation, which requires the balanced system and are applicable to any power system but are particularly useful for unbalanced distribution systems. Their effectiveness has been proven through many EMTP simulations.

Performance Analysis for the UPQC(Unified Power Quality Conditioner) Interconnected to the Distributed Generation System (분산전원 연계형 UPQC(Unified Power Quality Conditioner)의 성능해석)

  • 김희중;배병열;한병문
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.3
    • /
    • pp.152-160
    • /
    • 2004
  • A novel UPQC(Unified Power Quality Conditioner), which consists of series inverter, shunt inverter, distributed generation system, is proposed. The proposing system can compensate reactive power, harmonics, voltage sag and swell, voltage interruption etc. through the change of paralleling operation mode and islanding operation mode. The control strategy for the proposing system was derived using the instantaneous power method. The performance of proposing system was analyzed by means of the PSCAD/EMTDC simulation and the experimental work with the hardware prototype. The proposing system has the ultimate capability of improving power quality at the point of installation on power distribution systems or Industrial power systems and can be utilized for the custom power device in th future distribution system.

A Study on the Voltage Sag During the EVs Charging Considering Domestic Data (국내 데이터를 고려한 전기 자동차 충전 시 순시전압강하에 관한 연구)

  • Go, Hyo-Sang;Kim, Jun-Hyeok;Kim, Eung-Sang;Kim, Chul-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.1
    • /
    • pp.37-46
    • /
    • 2015
  • In order to charge EVs, they have to be connected to distribution system. Therefore, if unprecedented numbers of EVs are connected to power systems, it could result in deterioration of power quality, overload, and other system problems. In this paper, the effects of voltage sag on the distribution system due to the connection of EVs is evaluated by considering related field data of Republic of Korea such as the number of gasoline-fueled vehicles, seasonal load of power system and the monthly and daily real-time traffic volume. The distribution system and EVs are modeled using the Electro Magnetic Transients Program (EMTP).

A study of Optimal Reconfiguration in Distribution Power System using Initial Operating Point (초기 운전점 선정을 통한 배전계통 최적 재구성에 관한 연구)

  • Seo, Gyu-Seok;Kim, Jung-Nyun;Baek, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.3
    • /
    • pp.451-456
    • /
    • 2007
  • This paper presents a problem that reconfigure distribution power system using branch exchange method. Optimal reconfiguration problem calculates line loss, voltage condition about system states of all situations that become different according to line On/off status, and search for optimum composition of these. However, result is difficult to be calculated fast. Because radiated operation condition of system is satisfied using many connection and sectionalize switches in the distribution power system. Therefore, in this paper, optimization method for reducing system total loss and satisfying operating condition of radial and constraints condition of voltage is proposed using the fastest branch exchange. And optimal solution at branch exchange algorithm can be wrong estimated to local optimal solution according to initial operating state. Considering this particular, an initial operating point algorithm is added and this paper showed that optimal solution arrives at global optimal solution.

Evaluation for Reliability of Distribution Power System taking into consideration Customer Interruption Cost (수용가 정전비용을 이용한 배전계통 공급신뢰도 산출)

  • Choi, Sang-Bong;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Kim, Ho-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.267-269
    • /
    • 2001
  • This paper presents algorithms to evaluate reliability of distribution power system taking into consideration customer interruption cost. Customer interruption cost is considered as one of the valuable index to estimate reliability of the distribution power system from customer situation. Also, this paper estimate evaluation results regarding the reliability of distribution power system using a sample model system. Finally, evaluation results of unserved energy and system interruption cost based on customer interruption cost are shown in detail.

  • PDF

Optimal Feeder Routing for Distribution System Planning Using a Heuristic Strategy (휴리스틱 탐색전략을 이용한 배전계통 계획의 급전선 최적 경로 선정)

  • Choi, Nam-Jin;Kim, Byung-Seop;Shin, Joong-Rin
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.11
    • /
    • pp.566-574
    • /
    • 2000
  • This paper propose a heuristic algorithm based on the Branch-Exchange (BE) method to solve Optimal feeder Routing(OFR) problem for the distribution system planning. The cost function of the OFR problem is consisted of the investment cost representing the feeder installation and the system operation cost representing the system power loss. We propose a properly designed heuristic strategy, which can handle the horizon-year expansion planning problem of power distribution network. We also used the loop selection method which can define the maximum loss reduction in the network to reduce calculation time, and proposed a new index of power loss which is designed to estimate the power loss reduction in the BE. The proposed index, can be considered with both sides, the low voltage side and voltage side branch connected with tie one. The performances of the proposed algorithms and loss index were shown with 32, 69 example bus system.

  • PDF

Improvement of Variable Renewable Energy Penetration of Stand-Alone Microgrid Hosting Capacity by Using Energy-Storage-System Based on Power Sensitivity

  • CHOI, DongHee
    • Journal of Advanced Information Technology and Convergence
    • /
    • v.10 no.2
    • /
    • pp.91-101
    • /
    • 2020
  • Recently, the demand for high penetration of variable renewable energy (VRE) penetration in a power system is increased. In consequence, distribution systems including microgrids confront the increased installation of VRE-based distributed generation. Despite of the high demand of VRE-based distributed generation in a distribution system, the installation of photovoltaic (PV) system in a distribution system has been restricted by various problems. In other words, the hosting capacity for high VRE penetration in a distribution system is limited. This paper analyzes the improvements of hosting capacity VRE penetration of stand-alone microgrid (SAMG) with energy storage system (ESS) by considering virtual-slack (VS) control based on power sensitivity. With the pre-defined power sensitivity, the ESS operates as virtual slack in the SAMG by controlling its bus voltage and phase angle indirectly. Therefore, the ESS enables the increase of VRE penetration in the SAMG. The proposed VS control is realized by analyzing the ESS as a virtual slack in power flow analysis based on power sensitivity. Then its validity is demonstrated with the case study on the SAMG in South Korea with practical data.

Lightning Surge Analysis on Underground System in DC Combined Distribution System (DC 혼합배전시스템에서 지중계통의 뇌과전압 해석)

  • An, Chun-Yong;Lee, Jong-Beom
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.6
    • /
    • pp.737-743
    • /
    • 2013
  • This paper describes the overvoltage through lightning surge analysis on underground system in DC combined distribution systems. It is considered that operating micro grid including distributed generation with smart grid can make possibility of composing new distribution system different from existing one. However, there are many papers about low voltage DC distribution in grids or buildings but not many about replacement or distributing 22.9kV AC distribution system to DC system. Among many research need for DC system development, overvoltage is studied in this paper. Overvoltage is simulated on DC cable when lightning strikes to overhead grounding wire which is installed at the nearest location from power cable section. Analysis as well as modeling is performed in EMTP/ATPDraw. It is evaluated that analysis results can be used to design of DC underground distribution power cable system.

Preliminary Study of HTS-FCL Application in Distribution System (초전도 한류기의 배전계통 적용 기본검토)

  • Choi, Heung-Kwan;Yoon, Jae-Young;Kim, Jong-Yeul;Lee, Byong-Jun
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.421-423
    • /
    • 2003
  • To prevent fault effect in supply of electric power distribution system and plan stable operation of electric power system, must control magnitude of fault current. Although there are various kinds of method to solvethis, approached from super conductivity Fault Current Limiter application viewpoint among them. High Temperature Superconductor-Fault Current Limiter (HTS-FCL) development is progressing according to HTS technology development, and system application is tried. For actual system application of such super conductivity FCL, so that can reflect special quality of actuality supply of electric power distribution system just as it is in this treatise supply of electric power system by two modelling do. Also, by simulation of HTS-FCL action and protection coordination with another equipment appliances, verified the effectiveness in supply of electric power system applying itself super conductivity FCL EMTDC dynamic characteristic model that is develope.

  • PDF

Optimal Capacity and Allocation Distributed Generation by Minimization Operation Cost of Distribution System (배전계통 운영비용의 최소화에 의한 분산전원의 최적 용량과 위치결정)

  • 배인수;박정훈;김진오;김규호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.9
    • /
    • pp.481-486
    • /
    • 2004
  • In operation of distribution system, $DG_s$ Distributed Generations) are installed as an alternative of extension and establishment of substations and transmission and distribution lines according to increasing power demand. In operation planning of $DG_s$, determining optimal capacity and allocation gets economical pro(it and improves power reliability. This paper proposes determining a optimal number, size and allocation of $DG_s$ needed to minimize operation cost of distribution system. Capacity of $DG_s$ (or economical operation of distribution system estimated by the load growth and line capacity during operation planning duration, DG allocations are determined to minimize total cost with power buying cost. operation cost of DG, loss cost and outage cost using GA(Genetic Algorithm).