• Title/Summary/Keyword: post-construction evaluation

Search Result 174, Processing Time 0.031 seconds

The Analysis for Development Evaluation System of G-SEED Building Maintenance and Management (녹색건축인증 건축물 유지관리 평가제도 발전을 위한 연구)

  • Kim, Yu-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.261-262
    • /
    • 2016
  • In Korea, Green building certification system had been operated for more than 10 years and Expired certification buildings are ever-increasing. However, post management of building and qualification standard for re-certification(G-SEED) aren't exist, certificated green building don't have smoothly maintenance and management. Therefore, analysing the status and situation of similar system such as building maintenance and management, to suggest the direction of evaluation for green standard for energy and environmental design.

  • PDF

Improvement of Construction Manager Selection Method (건설사업관리자 선정방식 개선 방안)

  • Park, Yong-Woo;Lim, Nam-Gi
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.108-115
    • /
    • 2011
  • This study investigates the construction management selection methods for fair competition within the construction management market by analyzing the current status of domestic construction management, the 2010 publication on the status of construction management, and the construction management evaluation criteria. Also, the 2009 publication of top CM service establishments, the average proportion of tender for 120 CM services from 2002 to 2010, and six assessment results which are open to the parties directly involved were statistically analyzed to review the adequacy of the evaluation criteria. This analysis shows that the evaluation criteria for the CM service impedes the development of the construction management industry and companies, since the criteria are decided by the service payment, and the technical skills assessed by technical proposals have no ties with contract prices. Therefore, this study proposes an improvement of the selection methods in accordance with the project characteristics and the technical requirements. However, more research is still needed to derive a detailed classification method of the technical requirement, the owner's evaluation criteria selection, and the preparation of an institutional foundation for the construction manager's post-evaluation.

Linkage of Damage Evaluation to Structural System Reliability (손상평가와 구조물 신뢰성과의 연계)

  • Park, Soo Yong
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.1
    • /
    • pp.41-50
    • /
    • 2003
  • Nondestructive Damage Evaluation (NDE) techniques yield the damage location and its size from the modal characteristics of pre-damaged and post-damaged structures. To predict the system reliability of the aging structure, results from the NDE are integrated into the element/component failure probabilities. The element/component failure probabilities can be calculated from failure functions for each element/component with the aid of techniques from a structural reliability analysis. In this paper, a method to estimate the system reliability of a structure that is based on the reliabilities of elements/components in a given structure is presented. The efficacy of the combination of the nondestructive damage detection and the structural reliability evaluation is demonstrated using pre-damaged and post-damaged modal data obtained from numerical simulations of a rigid frame.

Post-earthquake assessment of buildings using displacement and acceleration response

  • Hsu, Ting-Yu;Pham, Quang-Vinh
    • Earthquakes and Structures
    • /
    • v.17 no.6
    • /
    • pp.599-609
    • /
    • 2019
  • After an earthquake, a quick seismic assessment of a structure can facilitate the recovery of operations, and consequently, improve structural resilience. Especially for facilities that play a key role in rescue or refuge efforts (e.g., hospitals and power facilities), or even economically important facilities (e.g., high-tech factories and financial centers), immediately resuming operations after disruptions resulting from an earthquake is critical. Therefore, this study proposes a prompt post-earthquake seismic evaluation method that uses displacement and acceleration measurements taken from real structural responses that resulted during an earthquake. With a prepared pre-earthquake capacity curve of a structure, the residual seismic capacity can be estimated using the residual roof drift ratio and stiffness. The proposed method was verified using a 6-story steel frame structure on a shaking table. The structure was damaged during a moderate earthquake, after which it collapsed completely during a severe earthquake. According to the experimental results, a reasonable estimation of the residual seismic capacity of structures can be performed using the proposed post-earthquake seismic evaluation method.

A Study on the BIM Data Guidelines for the Review of Constructability and Economic Evaluation of Apartment Houses (공동주택 시공성 검토 및 경제성 평가를 위한 BIM 데이터 구축 가이드라인 작성에 관한 연구)

  • Lee, Hae-Chan;Kim, Jin-Man;Lee, Dong-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.149-150
    • /
    • 2019
  • Recently, major public owner and general contractors in Korea are actively preparing and improving BIM manuals and guidelines to effectively apply BIM technology in construction projects. These guideline has a purpose to define the scope of the applying BIM technology to each construction phase and to explain the minimum technology guidance required for the initial stage. In situations where BIM data are to be submitted within a limited time and cost at the design stage, a BIM data preparing process should be carried out in advance to meet the BIM interoperability between the pre and post of construction precess. In this research, we propose the scope of the BIM guidelines to meet and to be considered for the BIM based review of constructability and economic evaluation of Apartment.

  • PDF

Improvement of Detailed Indicators and Application of Methodology for Post-Evaluation of National River Project (국가하천사업 사후 평가를 위한 세부지표 개선 및 방법론 적용)

  • Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.188-196
    • /
    • 2021
  • Korea has invested heavily in projects related to national rivers, but there is no evaluation technique and system to manage river projects that can evaluate the effectiveness of the river projects after they are completed. Their absence leads to the inability of information on river construction sections, analysis of project effects, and benchmarking between projects. This may cause over-budget, overlapping investment problems due to the implementation of similar projects in the same section, and incorrect business elements may be repeatedly utilized. In order to solve this shortcoming, this study developed river project evaluation techniques and a river project (construction) management system. The development of evaluation techniques enables comparison and analysis between projects and can be utilized in establishing maintenance plans. The system can also provide inquiry of construction information, visualization of construction, and management of performance items. In this study, the evaluation techniques developed through prior research were modified and supplemented, and the effectiveness was verified by applying them to national river projects in A river and B river. It is expected that the evaluation techniques and system utilization measures presented will increase the work efficiency of river projects and enhance the efficiency of river projects.

ESTIMATES OF THE CONSUMER SATISFACTION INDEX USING THE POST OCCUPANCY EVALUATION

  • Kyungsook Kim;Jeong hack Kim;Hana Kim;Jaejun Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1070-1075
    • /
    • 2005
  • The evaluation items to assess the consumer needs are thought to be varied depending on their age, education and income. It should be noted that consumer needs are getting too diversified to notice them in time due to the rapid economic, social and cultural development. It is, therefore, considered improper to try to assess the level of consumer satisfaction and correct consumer needs by employing one evaluation method for the vastly diversified consumer types. This research is going to conduct a written questionnaire survey to the apartment dwellers in order to identify like dweller groups according to their age, income and education. Then the scope of personal characteristics of each group will be identified and the importance assessment model will be developed. Then the items on the POE will be weighted according to the assessed importance. Finally a method of developing the customer satisfaction index will be produced to quantify how much the consumers are satisfied with the project.

  • PDF

HOUSING SATISFACTION IN SUBSIDIZED HOUSING SCHEMES: A SOUTH AFRICA PERSPECTIVE

  • Clinton O. Aigbavboa;Wellington D. Thwala
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.636-646
    • /
    • 2011
  • Post-occupancy evaluation (POE) techniques have been developed to provide a means for evaluating occupant responses to changes in an environment and linking this response to physical measures of that environment. POE has been used to systematically evaluate the performance of buildings after they have been built and occupied for some time. This paper present findings on factors (social and physical), which influences housing residential satisfaction of a sample of occupants in four different government Housing Subsidy locations in the Gauteng Province of South Africa. Descriptive statistics were carried out on the data obtained through the use of occupant survey. Findings emanating from the survey revealed that the respondents were satisfied with their overall housing situation, but had complaints about certain aspects of the housing unit. However, the respondents felt that most of their housing needs were not being met. Also, a comparison is also made of the perceived factors of dissatisfaction amongst the housing subsidy occupants. It is recommended that a wider systematic coverage of the subject through investigation and diagnostic POE and occupants need assessment should be carried in housing subsidy schemes in South Africa.

  • PDF

A Study on the Characteristics of the Floor Impact Noise and Vibration According to Structure Types of Apartment House (공동주택 구조 유형별 바닥진동 및 바닥충격음 특성)

  • Lee, Ku-Dong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.35-39
    • /
    • 2009
  • Recently, the flat-plate structure is widely used because it has many advantages such as reduction of story height, long span etc than the RC rahmen structure. Furthermore, application of the flat-plate is on the increase because of flexible plan unlike wall structure. Long span have been at a disadvantage for vibration serviceability evaluation, however studies about vertical direction vibration of flat-plate structure has not been carried out. This study analysis the characteristics according to slab structure to make an experiment on vibration and floor impact noise for the flat-plate structure in construction performance laboratory in Kolon E&C R&D center, the flat-plate structure applied to the post-tension method, and the wall structure in apartment houses.

  • PDF