The purpose of this paper is to introduce case studies on 2 projects for the construction of port facilities in Colombo, Sri lanka. In Queen Elizabeth quay development project in 2000, the damage at the bottom of steel tubular piles were occurred when piles were driven into subsoil for piled wharf structure in Stage 1. In order to prevent same incident in Stage 2 & 3, the pile driveability analysis were executed by dynamic formulas, analysis program, test driving and pile load tests. Through pile driveability analysis, prevention plans were proposed. In Colombo port expansion project in 2008, the mv method was applied to predict a primary consolidation settlement of a subsoil under a breakwater in the calculation stage. The $m_v$ was estimated from results of cone penetration tests and the final settlement by consolidation was calculated with it.
The aim of this study is to determine the critical factors and construction requirements for a new deep-water seaport system in the Lach Huyen area in northern Vietnam. In this study, the Analytic Hierarchical Process (AHP ) method was used to evaluate the importance of the criteria and subcriteria. The results were as follows: the principal criterion "geographical location (0.151)" ranked as the most important criterion for building a new deep-water port system, which is affected by the subcriteria "direct sea route with mega-vessel" and "good liner connectivity index". The principal criterion "port competency (0.145)" ranked second; thus, it can be concluded that good competitiveness of a port' will provide many benefits to the port and the region. Regarding the implication, the established evaluation framework can be used for port construction to make a more reasonable judgment. In a future study, the scope of evaluation factors should be widened, involving participation of broader stakeholders, such as shipping companies, forwarders, and logistics companies.
부산항 신항의 배후단지는 복잡한 관련법 및 관련기관의 다원화로 항만설립 취지에 맞지 않는 사업이 시행되는 등 항만사업이 원활이 운영되지 못하고 있다. 예를 들어, 관련기관 간 협의 없이 공급된 대규모 아파트 단지는 항만배후부지의 물류기능 수행에 지장을 주고 있으며, 각종 교통편의시설의 설치 및 관리 기능은 여러 기관에 분산되거나 중복되어 있어 업무 수행 상의 혼란과 책임 떠넘기기 현상이 초래되고 있다. 부산항 신항과 배후단지가 항만으로서의 고유기능을 제대로 수행하기 위해서는 이러한 문제점에 대한 해결책이 반드시 필요한 실정이다. 이와 같은 문제의식 하에서 본 연구는 정부 간 기능배분의 원칙(이론)에 기초하여 부산항 신항 배후단지 개발 및 관리관련 기능의 정부 간 배분 상의 문제를 분석하고, 기능배분의 개선방안을 제시하는 것을 목적으로 하였다. 분석결과, 특히 주거시설의 공급, 교통편의시설 설치 및 관리 등과 관련된 기능배분이 행정책임 명료화, 효율성, 보충성, 포괄성 등의 기능배분 원칙에 맞지 않아 많은 문제가 야기되고 있음을 발견할 수 있었다. 이와 같은 문제점 분석 결과에 기초하여, 관련 기관 간 행정협의회의 제도화, 광역행정 방식의 활용(사무위탁, 지방자치단체 간 조합 등), 특별지방자치단체의 설립(지방자치단체 간 조합, BPA 등) 등과 같은 기능배분과 관련된 개선방안을 제시하였다.
As a part of the development program of Ulsan Port, construction of detached breakwater is planned. In Ulsan Port, several oil-buoys exist. If the detached breakwaters have been constructed, these oil-buoys will be located within 1 km from the planned breakwaters. Construction of the breakwaters gives rise to changes of wave conditions on the sea areas, especially in front of the breakwater and it affects mooring of tankers, which supply oil to the oil-buoy In this study, in order to calculate standing wave distribution after construction of a breakwater, numerical model is proposed based on unsteady mild slope equation. Calculation is performed by testing different wave heights, directions and reflection coefficients of breakwater. In addition, the influence to working condition of tanker moored at the oil-buoy is evaluated by using measured wave conditions and calculated results.
재난 및 재해에 의해 파손 또는 기능이 훼손된 항만인프라 시설의 복구와 시공작업 작업을 지원하기 위하여 항만 내 정기순시, 수중환경 모니터링, 항만 내 수중 형상정보 취득 등의 임무수행을 기반으로 작업장비와 연계, 시공지원이 가능한 AUV 플랫폼 분석과 설계에 관련한 내용을 정의한다.
열악한 작업환경 때문에 수중항만공사를 기계화하려는 많은 노력들이 시도되고 있다. 본 논문은 수중항만공사 중 사석 고르기 작업을 수행하는 수중건설로봇에 대해 기술한다. 로봇의 블레이드는 울퉁불퉁한 지형에서도 사석 마운드를 기준면에 대해 평편하게 고르고, 다목적암은 사석을 파고, 채울 수 있게 설계되었다. 본 연구는 로봇에 설치된 위치 및 방위 센서와 동기를 이루면서 주행과 스윙운동이 포함된 다목적암과 블레이드의 기구학을 해석한다. 기준수심센서에 부여된 월드좌표에 대해서 블레이드와 다목적암의 위치와 방위를 나타내고, 기준면과 나란한 고르기 작업을 위한 형상을 찾는다. 고르기 작업을 위한 유압제어시스템을 개발하며, 로봇에 의한 육상 및 수중 사석 고르기 작업을 실시해 실험결과를 보인다. 로봇의 작업속도는 잠수부보다 8배 정도 빠르며 작업품질도 우수한 것으로 평가된다. 잠수부가 작업할 수 없는 대수심에서는 효율성이 더 좋을 것으로 기대된다.
The extensive construction works of container terminals progressed since 2006 was converted to small scaled construction works or reclaiming works since 2012 in Busan New Port area. To investigate changes in activity of otters with the change of construction work scales, the linear densities of spraints at 15 localities of 5 areas (I-V) near the Busan New Port construction areas were surveyed during the period from 2012 to 2016. As the results, the average linear density of spraints has a tendency to increase since 2014. That is, the linear densities of spraints have increased at the area II and IV where the reclaiming works have been progressed, although have decreased or unchanged in the areas I, III and V where small scaled construction works have been progressed. Based on the fact that there were habitats at the Honamdo in the area II and the Yeondo in the area IV, otters seemed to restore their activities around the habitats as the center regardless of the reclaiming works.
This paper investigates the circumstances and conditions of Mokpo Port to develop it as an international logistics stronghold and seeks scheme to maximize the local economic ripple effect through construction and activation of Mokpo New Port. Under the circumstances in which neighboring ports vying with each other have built broad spheres of influence, and competition among ports becomes fierce, a priority cargo attraction strategy should be established by using Mokpo's favorable location compared to other ports in order to ensure that a large quantity of goods is transported from Mokpo New Port. Especially, Mokpo New Port needs to be developed as a vehicles-only exporting port, as well as a port for used car exports and an import port for stones and timber.
The expansion of old road is needed in construction the entrance at the $\bigcirc$$\bigcirc$I/C road in $\bigcirc$$\bigcirc$city. To strength the national competition, many agents who concerned do their best for finishing that construction early as soon as possible. In generally, soil embankment on soft foundation is caused to reduce the stability by making the settlement of ground surface due to the over load. Thus, we try to make it stable by building EPS embankment construction which in our working place is one kind of the method of light embankment construction after excavating the original ground.
Northeast Asia logistics hub strategy was undertaken by Korean Government to gain a national competitive advantage in Northeast Asia. Current Government has Northeast Asian Economic Hub Strategy including construction of SOC in Northeast Asia for promoting peace, promotion of formation of Northeast Asia Community, logistics hub, Financial hub and national innovation for R&D Cluster. To realize Northeast Asian logistics hub, the Northeast Asia logistics hub road map has undertaken as follows: expansion of logistics infra in Incheon Airport, Busan Port and Gwangyang Port, systematic improvements such as adjustment of investment distribution, special logistics companies, transparent customs in logistics transactions, logistics manpower, improvement of system supporting global logistics and attraction of international logistics companies to the logistics center, construction of seamless and paperless logistics information network, Northeast Asia railway infra. The purpose of this paper is to study investment priority and improvements in the Northeast Asia Logistics Hub Road Map and to contribute to gain the national competitive advantage as logistics hub in Northeast Asia
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.