• Title/Summary/Keyword: plant operation

Search Result 2,268, Processing Time 0.03 seconds

Suggestion of Logic to Control Power Plant Equipped ESS in case of Full Open Turbine Control Valve (ESS를 이용한 발전소 터빈제어밸브 전개 운전 제어로직 제안)

  • In Young Chung;Jae-Heon Lee
    • Plant Journal
    • /
    • v.18 no.4
    • /
    • pp.66-72
    • /
    • 2023
  • In order to respond to the demand for flexible operation of thermal power generation, development of natural sliding pressure operation that minimizes throttle loss by opening the turbine control valve 100% and maximize power generation efficiency in conjunction with ESS in order to quickly respond to fluctuations in the system frequency is required. The logic development of natural sliding pressure operation with ESS was developed to modify the existing logic at the power plant's top-level control logic such as the unit master, the boiler master and the turbine master. Cooperative control algorithms that complement the advantages and disadvantages of ESS operation (quick response, limited capacity) and power plant operation (slow response, continuous operation) not only improve efficiency when applied to actual power plants, but also respond quickly and flexibly to load demands to ensure system stability.

  • PDF

Prediction of Tidal Regime According To Garolim Tidal Power Plant operation (가로림만 조력발전소 가동에 따른 조석체계 변화 예측)

  • Kang, Sok-Kuh;Lee, Kwang-Soo;Park, Jin-Soon;Yum, Ki-Dai
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.639-643
    • /
    • 2007
  • Tidal regime change with general hydrolic condition change is examined, according to Garolim Tidal Power Plant (TPP) operation. Numerical model has been developed for the Yellow and East China Seas region, in order to consider the tidal regime change by the TPP operation. The changes of tidal elevation and tidal current inside the Garolim bay are also investigated in details, along with examining the change of the tidal flat area with operation. The field measurement for the tide and current have been carried out for the validation of the numerical model and for understanding the state of current system in the present state.

  • PDF

Prediction of Tidal Regime According To Garolim Tidal Power Plant operation (가로림만 조력발전소 가동에 따른 조석체계 변화 예측)

  • Kang, Sok-Kuh;Lee, Kwang-Soo;Park, Jin-Soon;Yum, Ki-Dai;Jung, Kyung-Tae;Jang, Chan-Joo
    • New & Renewable Energy
    • /
    • v.3 no.2 s.10
    • /
    • pp.3-10
    • /
    • 2007
  • Tidal regime change with general hydrolic condition change is examined, according to Garolim Tidal Power Plant (TPP) operation. Numerical model has been developed for the Yellow and East China Seas region, in order to consider the tidal regime change by the TPP operation. The changes of tidal elevation and tidal current inside the Garolim bay are also investigated in details, along with examining the change of the tidal flat area with operation. The field measurement for the tide and current have been carried out for the validation of the numerical model and for understanding the state of current system in the present state.

  • PDF

A dynamic simulation study on SCR (Stream Carbon dioxide Reforming) process for pilot plant operation (파일럿 플랜트 최적운전을 위한 SCR공정 동적 모사)

  • Kim, Yong Heon;Bae, Ji Han;Park, Myoung Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.136.2-136.2
    • /
    • 2011
  • A dynamic simulation study on SCR process in GTL process was carried out in order to find optimum operation conditions for pilot plant operation. Optimum operating conditions for SCR synthesis gas process were determined by changing operation variables such as feed temperature and pressure. It was also assumed that physical properties of reaction medium were governed by RKS (Redlich-Kwong-Soave) equation. The effect of temperature and pressure on synthesis gas process $H_2$/CO ratio were mainly examined. Dynamic simulation results were fed back to feed operation condition for optimizing productivity, especially for appropriate condition to FT (Fischer-Tropsch) synthesis unit.

  • PDF

A development of reliability evaluation model for power plant fan pitch blade control actuator (발전설비 통풍기 날개각 제어작동기 신뢰성평가 모델 개발)

  • Son, Tae-Ha;Huh, Jun-Young
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.3259-3263
    • /
    • 2007
  • This paper describes the proceedings of creating countermeasures after analysis and maintenance be able to conduct operation safely in a power plant. in order to operate the power plant in a stable and reliable way, the best condition of the govemor system can be maintained through the response characteristic analysis of the control device for the pitch blade control hydraulic actuator. The fan pitch blade control hydraulic actuator of a 500MW large-scale boiler is frequently operated under normal operation conditions. Common problems or malfunctions of the pitch blade control hydraulic actuators leads to the decline of boiler thermal efficiency and unexpected power plant trip. The inlet and outlet gas can be controlled by using the fan pitch blade control hydraulic actuator in order to regulate the internal pressure of the furnace and control the frequency in the power plant facility which utilizes soft coals as a power source.

  • PDF

A Study on the Optimal Weakly Operation Planning of Pumped Hydrostorage Plant (함수발전기의 주간운용계열에 관한 연구)

  • 송길영;김영태
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.34 no.5
    • /
    • pp.193-200
    • /
    • 1985
  • Increased attention has been given in recent years to the use of pumped hydrostorage plant to meet the requirements for peak generation and bottom pumping. Once a pumped hydrostorage plant is installed, its economic operation as an integral component of a steam generating system requires the selection of a pumping and generating schedule which will result in the most effective use of the hydro generating capacity. The general object of coordination of pumped hydrostorage plants with electric power system is the minimization of the overall procduction cost and the maximization of generation reserves. This paper presents a method for the optimal scheduling of pumped hydrostorage plant and a computer program which determines weekly operating schedules for a pumped hydrostorage plant by dynamic programming method.

  • PDF

A Study on Optimal Operation for Soot Blower of Power Plant (발전용 Soot Blower 최적운전에 관한 연구)

  • Kim, Sung-Ho;Jung, Hae-Won;Yook, Sim-Kyun
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.541-543
    • /
    • 2004
  • An optimal soot blowing system has been developed for an optimal operation of power utility boilers by both minimization of the use of steam and the number of soot blowers worked during soot blowing. Traditionally, the soot blowing system has been operated manually by operators. However, it causes the reduction of power and thermal performance degradation because all soot blowers installed in the plant should be worked simultaneously even there are lots of tubes those are not contaminated by slagging or fouling. Heat transfer area is divided into four groups, furnace, convection area including superheater, reheater and economizer, and air preheater in the present study. The condition of cleanness of the tubes is calculated by several parameters obtained by sensors. Then, a part of soot blowers works automatically where boiler tubes are contaminated. This system has been applied in a practical power plant. Therefore, comparison has been done between this system and manual operation and the results are discussed.

  • PDF

Experience in Combustion of Various Dewatered Sludges at a Commercial-Scale Fluidized Bed Incinerator

  • Gu, Jae-Hoi;Yoo, Byung-Sang;Yeo, Woon-Ha;Seo, Yong-Chil;Lee, Jea-Keun
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 2000.11a
    • /
    • pp.91-96
    • /
    • 2000
  • A commercial-scale Fluidized Bed Incinerator(FBI) to treat dewatered sludges has been developed by Jindo Corporation, Korea, as one of the governmental R&D project during 1990 to 1997. The FBI plant was constructed at Kunsan city and fully in operation after finishing the successful test-burn period since June 1998. The company now has a capability of the design, construction and operation of commercial FBI plants. This paper introduces the experiences of design and operation of Kunsan FBI plant, which has the capacity of 60 ton/day and incinerates various sludges from waste water treatment facilities and liquid waste such as waste oil or waste solvent.

  • PDF

Operation Aiding System for Abnormal Situation in Chemical Plant (화학공정 비정상상황 발생시의 조업자 운전지원 시스템에 관한 연구)

  • Park Kyoung-Chan;An Dae-Myung;Hwang Kyu-Suk
    • Journal of the Korean Institute of Gas
    • /
    • v.1 no.1
    • /
    • pp.64-72
    • /
    • 1997
  • A strategy is proposed for the systematic synthesis of goal-tree to support the operation of abnormal situation in chemical plant. A knowledge base using the heuristics of operators is organized for synthesizing goal tree to take appropriate safety precautions with properties of accident. A computer-based system which utilizes artificial intelligence technique is developed to evaluate the effectiveness of the methodology and applied to the model plant.

  • PDF