• Title/Summary/Keyword: plant operation

Search Result 2,268, Processing Time 0.026 seconds

Performance Analysis of Air Operated Valve by Thermal Aging (공기구동밸브의 열노화에 따른 성능평가)

  • Lee, Sun-Ki
    • Journal of Power System Engineering
    • /
    • v.19 no.5
    • /
    • pp.93-98
    • /
    • 2015
  • Nuclear power plants has a number of valves, which are operating at a high temperature-high pressure and radiation environment conditions. Nevertheless, it is important to maintain the reliability of the valves to ensure safe operation of the nuclear power plant. However, the aging of the valves by increasing of years of plant operation and the system transients due to the sudden load change are working the failures of the reliability of the valve. In this paper, we evaluate experimentally the performance change according to the thermal aging of the valve. Results show that the valve stem and the actuator leakages were enlarged by the thermal aging.

A Control System for Solar Thermal Power Plant (태양열발전 제어시스템)

  • Park, Young-Chil
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.693-697
    • /
    • 2007
  • A control system for solar thermal power plant is the control system to coordinate the whole system's operation, including management of distributed control systems, process control for optimal operation of total system, monitoring system operating conditions and doing administrative functions. This work, as a progress report, presents the results obtained so far in building a control system for the 1MW solar thermal power plant. To make the control system, we first defined the control system's hierarchy and classified the role of each layer. Then, as the first stage of making control system, we designed and developed the sun tracking control system for heliostat.

  • PDF

The MSW Pyrolysis & Melting Plant DONGBU R21 (생활폐기물 열분해용융시설 동부 R21)

  • Choi, Sang-Sim;Kim, Seok-Hwan;Kim, Kyong-Lae
    • 한국연소학회:학술대회논문집
    • /
    • 2004.06a
    • /
    • pp.314-328
    • /
    • 2004
  • Mitsui Engineering and Shipbuilding Co., Ltd. (MES) has completed Recycling 21 (R21) pyrolysis and melting technology for municipal solid wastes. The basic technology is licensed from Siemens, but MES has made major improvements to the design and operation of the R21 system Consequently, up to now, MES has been completed six (6) R21 plants in Japan. The following text will provide a brief overview of the design & operating features of R21 technology, focused on the reliability of system and low emission of hazardous material, which have been proved by the successful construction & operation experience of the plants.

  • PDF

FTA Modeling of Water Supply System for Hydro-power Plant (수력발전소 물 공급 설비에 대한 FTA 모형)

  • Jeon, Tae-Bo;Kwon, Chang-Seob
    • Journal of Industrial Technology
    • /
    • v.26 no.B
    • /
    • pp.145-155
    • /
    • 2006
  • High level of reliability in facility operation is specifically required these days. The goal of this study is to secure a methodology for reliability analysis of hydro-power plant so that an appropriate decision for operation and investment can be made. Fault tree analysis of water supply system within hydro-power plant has been performed in this study. We briefly examined the electric power generation facility and water supply system. We then developed fault tree for the water supply system based on failure modes and effects analysis. We conclude this study and provided future research areas.

  • PDF

A Study on Estimation Flow of Information Analysis for Prevention of Human Error to the Operation (화학 공장 내 운전과 설비작업의 인적 오류에 대한 정보 분석 평가흐름의 연구)

  • Yun, Yong-Gu;Gang, Yeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.11a
    • /
    • pp.231-241
    • /
    • 2013
  • In recent years, accident induced by human error is increasing in the chemical plant. Human error analysis of the chemical plant was conducted on the basis of past accident. Some company called by A for the basis of a chemical accident. Factor analysis of human errors was separated in plant operation and work. Agency's work of occupational safety & health was classified into four types. It is based on the work before, during work, recovery work, and discontinue work. It was still separated work of human error by analysis and then was derived factor and issue. The human error factor and priority for accident prevention in the chemical plant is presented.

  • PDF

Virtual Manufacturing for an Automotive Company (II) - Constuction and Operation of a Virtual Body Shop (자동차 가상생산 기술 적용 (II) - 차체공장 가상플랜트 구축 및 운영)

  • Noh, Sang-Do;Hong, Sung-Won;Kim, Duk-Young;Sohn, Chang-Young;Hahn, Hyung-Sang
    • IE interfaces
    • /
    • v.14 no.2
    • /
    • pp.127-133
    • /
    • 2001
  • Virtual Manufacturing is a technology facilitating effective development and agile production of products via computer models representing physical and logical schema and the behavior of the real manufacturing systems. For the successful application of this technology, a virtual plant as a well-designed and integrated environment is essential. We propose a series of systematic approaches and effective methods for construction and operation of a virtual plant in this paper, such as a 3-D CAD modeling, cell and line simulations and databases. We developed key technologies for measuring and 3-D CAD modeling of many equipments, facilities and structures of the buildings. In order to study the benefit of virtual manufacturing, we constructed a sophisticated virtual plant model of a Korean automotive company's body shop, and conducted precise simulations of unit cell, lines and the whole plant. We could obtain the benefit of savings in time and cost in many manufacturing preparation activities in the new car development processes.

  • PDF

Study on Certification Policy for Stabilization of Photovoltaic Industry - A Case Study of PV Power Plant O&M - (태양광발전소 O&M 관리를 통한 발전성능 향상 방안)

  • Ahn, Hyewon;Cho, Yongsung
    • Journal of Climate Change Research
    • /
    • v.6 no.2
    • /
    • pp.105-111
    • /
    • 2015
  • With PV market extension, Operation & Maintenance (O&M) went on the floor as an effective method so solve the reduction phenomenon of Performance Ratio (PR) of PV power plant and as a new business model of photovoltaic industry. This study chose institutionalization of O&M to vitalize domestic photovoltaic industry improving level of photovoltaic technology and dominate the market in advance. The result of analyzing advanced researches and domestic cases indicates that O&M is essential of operating PV power plant, therefore, now is the time for a systematic approach to establish O&M policy.

Analytical Study on the Optimal Operating Control of A Hybrid Geothermal Plant (지열복합 열원가기 최적운전채어에 관한 해석적 연구)

  • Jeon, Jong-Ug;Park, Jong-Sam;Myung, Woo-Ho;Kim, Young-Ki;Kim, Yong-Chan
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.6 no.2
    • /
    • pp.1-7
    • /
    • 2010
  • The objective of this study is to find the optimal control algorithm of a hybrid Plant, which is combined by renewable energy plant of the GSHP(Geothermal Source Heat Pump) and the normal plant (Chiller, boiler). The work presented in this study was carried out in the EnergyPlus(Version 2.0). The EnergyPlus was modified in order to simulate the hybrid plant. The plant system was controlled by the load-range-based operation in which schemes select a user specified set of equipment for each user specified range of a particular simulation condition. In the use of the load-range-based operation, four kind of control cases were defined and simulated in order to obtain the optimal control algorithm of the hybrid plant. The result showed that the Case 2 was the optimal control algorithm which used the GSHP as a base operating plant and the normal plant as an assistant operating plant. Even though the normal plant was operated in full load and the renewable energy plant of the GSHP was operated in partial load, the annual energy consumption of the normal plant was larger than that of the GSHP plant.

Initial Operating Condition of Membrane Bioreactor with PVDF Hollow Fiber and Permeate Reuse (PVDF 중공사막을 이용한 막생물반응기의 초기 운전조건 설정 및 여과수 재활용)

  • Shin, Choon-Hwan;Kang, Dong-Hyo;Park, Hae-Sik;Cho, Hyun-Kil
    • Clean Technology
    • /
    • v.16 no.1
    • /
    • pp.39-45
    • /
    • 2010
  • In this paper, 4 bundle modules of PVDF hollow fiber membrane from Woori Tech company (Korea) were manufactured in a treatment capacity of 10 ton/day. A membrane bioreactor (MBR) pilot plant was installed at Sooyoung Wastewater Treatment Plant in Busan. An alternating aeration process was selected to avoid the concentration profile of suspended solid (SS) in the MBR. For stable operation, raw wastewater with mixed liquor suspended solid (MLSS) of about 1,000 ppm, which was in-flowed from the aeration tank of the wastewater treatment plant, was fed and filtered through the pilot plant. Subsequently the pilot plant were washed three times with washing water: once with ethanol solution, once with a solution of 5% NaOCl, and finally with washing water. After the chemical washing, the remaining water in the MBR was fed into the pilot plant. As a result, the SS removal efficiency was found to be more than 99.9%. The amount of filtrate with the aeration tank influent decreased by 16%, compared with that from the initial conditions, giving rise to 30% increase in the suction pressure. These results were used to set up continuous operation conditions. The results from the continuous operation with influent MLSS of 1,900 mg/L showed that the SS removal efficiency was about 99.99% and that the amount of filtrate and the suction pressure were $42{\sim}52L/m^2$ and 16~20 cmHg, respectively, indicating stable operation of the pilot plant. However, for the reuse of wastewater, methods need to be sought to avoid growth of algae which affects the SS removal efficiency at inlet and outlet of the permeate tank.

Development of Digital Excitation System for San-cheong Pumped Sorage Power Plant (산청양수 디지털 여자시스템 개발)

  • Ryu, Ho-Seon;Lim, Ick-Hun
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.956-957
    • /
    • 2006
  • KEPRI developed digital excitation system for San-Cheong pumped storage power plant. This is the very complicated system because of operation connected with SFC(Static Frequency Converter). Many operation modes(stating, regeneration, back to back, line charging, gird connection mode etc) during the commissioning were successfully tested at san-Cheong #2.

  • PDF