• 제목/요약/키워드: planning simulation

검색결과 1,684건 처리시간 0.034초

A Simulation Based Vehicle Distribution Planning System

  • 양병희;이영해
    • 한국국방경영분석학회지
    • /
    • 제22권2호
    • /
    • pp.182-199
    • /
    • 1996
  • Many vehicle routing methods have been suggested, which minimize the routing distances of vehicles to reduce the total transportation cost. But the more considerations the method takes, the higher complexites are involved in a large number of practical situations. The purpose of this paper is to develop a vehicle distribution planning system using heuristic algorithms and simulation techniques for home electronics companies. The vehicle distribution planning system developed by this study involve so complicated and stochastic conditions such as one depot, multiple nodes(demand points), multiple vehicle types, multiple order items, and other many restrictions for operating vehicles. The proposed system is compared with the nearest neighbor method and the savings method in terms of total logistics cost and driving time. This heuristic algorithm and simulation based distribution planning system is efficient in computational complexity, and give improved solutions with respect to the cost as well as the time. This method constructs a route with a minimum number of vehicles for a given demand.

  • PDF

A Simulation Study on a Workload-based Operation Planning Method in Container Terminals

  • Jeong, Yeon-Ho;Kim, Kap-Hwan;Woo, Youn-Ju;Seo, Bo-Hyeon
    • Industrial Engineering and Management Systems
    • /
    • 제11권1호
    • /
    • pp.103-113
    • /
    • 2012
  • A yard in a container terminal is a temporary storage space before containers are loaded onto the target vessel or delivered to consignees. For improving the utilization of the space in the yard and the efficiency of loading and discharging operations, it is important that operation plans must be carefully constructed in advance. A heuristic method is suggested to solve operation space planning problems considering workloads on handling equipment as well as space availabilities. The operation plans in this paper includes quay crane (QC) schedules and space plans for multiple vessels considering the workload in the container yard of container terminals. This paper evaluates the effectiveness of a space planning method and the performance of a new QC scheduling method using a simulation model.

평면변형 H-형재의 열간단조, 공정설계 및 금형설계 (Computer-Aided Process Planning and Die Design for Hot Forging of H-Shaped Plane Strain Components)

  • Park, J.C.;Kim, B.M.;Kim, S.W.
    • 한국정밀공학회지
    • /
    • 제11권2호
    • /
    • pp.104-109
    • /
    • 1994
  • This research describes some developments of computer-aided process planning and die design for hot forging products of H-shaped plane strain produced by the press. The system is composed of three main modules(process planning module, die design module and simulation module) which are used independently or in all. Systm capabilities include as follows: 1. In die design module, using the results of process planning module, the shape and size of bolcker and finish die in each operation are determined and the ouput id generated in graphic form for manufacturing drawing. 3. In simulation module, the flow pattern of workpiece and the load/stroke curve are approximately predicted. Design rules for process planning and die design are extracted from plasticity theories, handbooks, relevant references and empirical know-how of field experts in hot forging companies. The developed system provides poweful capabilities for process planning and die design of hot forging products.

  • PDF

Formwork Productivity Analysis Model for Cost-efficient Equipment Operations

  • Hyunsu Lim;Taehoon Kim;Hunhee Cho;Kyung-In Kang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.226-230
    • /
    • 2013
  • In the tall building construction, the slab formwork largely impacts on construction cost. Because productivity of a slab formwork is influenced by a number of and the efficiency of equipment, using the equipment-based construction method, an appropriate equipment input planning is crucial for the productivity. Meanwhile, the general equipment input planning is conducted by intuition based on experience due to the lack of equipment productivity data. Thus, this study develop a simulation model to analyze table formwork productivity and to propose an optimum equipment input plan that reflects the construction process, based on the full consideration of the economic factors. This study developed a simulation model by using CYCLONE and the data for the model was collected by measuring the duration of each unit activity in the tall building where table forms were applied. It is expected that a simulation model helps users to make better decision on the equipment input planning of slab formwork.

  • PDF

연구개발 부문 적정인력 산정을 위한 확률적 모형설계에 관한 연구 (Design of Probabilistic Model for Optimum Manpower Planning in R&D Department)

  • 김종만;안정진;김병수
    • 품질경영학회지
    • /
    • 제41권1호
    • /
    • pp.149-162
    • /
    • 2013
  • Purpose: The purpose of this study was to design of a probabilistic model for optimum manpower planning in R&D department by Montecarlo simulation. Methods: We investigate the process and the requirement of manpower planning and scheduling in R&D department. The empirical distributions of necessary time and manpower for R&D projects are developed. From the empirical distributions, we can estimate a probability distribution of optimum manpower in R&D department. A simulation method of estimating the probability distribution of optimum manpower is considered. It is a useful tool for obtaining the sum, the variance and other statistics of the distributions. Results: The real industry cases are given and the properties of the model are investigated by Montecarlo Simulation. we apply the model to the research laboratory of the global company, and investigate and compensate the weak points of the model. Conclusion: The proposed model provides various and correct information such as average, variance, percentile, minimum, maximum and so on. A decision maker of a company can easily develop the future plan and the task of researchers may be allocated properly. we expect that the productivity can be improved by this study. The results of this study can be also applied to other areas including shipbuilding, construction, and consulting areas.

Optimizing Laser Scanner Selection and Installation through 3D Simulation-Based Planning - Focusing on Displacement Measurements of Retaining Wall Structures in Small-scale Buildings -

  • Lee, Gil-yong;Kim, Jun-Sang;Yoou, Geon hee;Kim, Young Suk
    • 한국건설관리학회논문집
    • /
    • 제25권3호
    • /
    • pp.68-82
    • /
    • 2024
  • The planning stage of laser scanning is crucial for acquiring high-quality 3D source data. It involves assessing the target space's environment and formulating an effective measurement strategy. However, existing practices often overlook on-site conditions, with decisions on scanner deployment and scanning locations relying heavily on the operators' experience. This approach has resulted in frequent modifications to scanning locations and diminished 3D data quality. Previous research has explored the selection of optimal scanner locations and conducted preliminary reviews through simulation, but these methods have significant drawbacks. They fail to consider scanner inaccuracies, do not support the use of multiple scanners, rely on less accurate 2D drawings, and require specialized knowledge in 3D modeling and programming. This study introduces an optimization technique for laser scanning planning using 3D simulation to address these issues. By evaluating the accuracy of scan data from various laser scanners and their positioning for scanning a retaining wall structure in a small-scale building, this method aids in refining the laser scanning plan. It enhances the decision-making process for end-users by ensuring data quality and reducing the need for plan adjustments during the planning phase.

재작업과 불확실성을 고려한 일정 시뮬레이션 방법론 (A Method for Schedule Simulation Considering Rework and Uncertainty)

  • 김찬묵;박영원
    • 한국철도학회논문집
    • /
    • 제12권1호
    • /
    • pp.135-143
    • /
    • 2009
  • 대부분의 개발 프로젝트는 목표 비용과 일정을 $40{\sim}200%$ 초과한다. 이러한 초과 현상은 계획시 업무를 과소 평가하거나 재작업을 고려하지 않음으로써 발생한다. 현재 국내에서 사용되는 대표적인 일정 계획/관리 기법(Gantt Chart, PERT/CPM 등)들은 재작업을 반영할 수 없다. 이 논문은 일정 계획시 보다 현실적인 일정 계획 값을 예측하기 위해서 재작업을 고려하는 방법을 고안하구 또한 과업의 과소평가를 방지하기 위해 수행시간의 불확실성을 확률변수로 나타내어 다루기 위해서 시뮬레이션을 수행하여 최종 완료 날짜의 예상치와 분산도를 계산하는 방법을 제안한다.

Motivation-based Hierarchical Behavior Planning

  • 송웨이;조경은;엄기현
    • 한국게임학회 논문지
    • /
    • 제8권1호
    • /
    • pp.79-90
    • /
    • 2008
  • 본 논문에서는 동기 기반의 계층적 행동 계획 시스템을 제안한다. 가상 시뮬레이션 게임 환경에서 에이전트는 행동 계획 시스템을 통해 적합한 행동을 선택하게 된다. 행동 선택 시스템은 동기를 추출하고 목표를 선택하고 행동을 생성하고 최적화를 수행한다. 동기를 평가할 때 갑작스럽게 발생하거나 누적된 이벤트에 대해 계산한다. 동기를 선택할 때는 확률 분포를 사용하여 무작위로 선택한다. 계층적 목표 트리를 탐색한 후에 목표를 실행할 수 있다. 행동들을 비교한 후 가장 적합한 행동을 선택하게 된다. 선택을 할 때 안전도 값과 만족도 값을 비교하여 최적화된 행동을 선택한다. 본 연구에서 제안한 시스템을 식당경영 게임에 적용했다.

  • PDF

외고정법을 이용한 컴퓨터이용 및 로봇지원 골절수술 및 골변형교 정술에 대한 연구 (Research on Computer-aided and Robotic-assisted Surgery of Fracture Reduction and Bone Deformity Correction under External fixation)

  • 김윤혁
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 추계학술대회 논문집
    • /
    • pp.131-134
    • /
    • 2005
  • This paper presents a computer-aided simulation and robotic-assisted execution technology of external fixation method to achieve fracture reduction and deformity correction in long bones. Combining the kinematic analysis with a graphic model of the tibia and the fixator allowed 3D simulation and visualization of the adjustments required to reduce fracture or correct bone deformity as a pre-operative planning tool. The developed robot model provided accurate deformity correction with small residual deformity based on the results of the planning. By incorporating the robot model with image-guided system and computer-aided planning, the integrated system could be useful for computer-aided pre-operative planning and robotic-assisted execution in fracture treatment and bone deformity surgery.

  • PDF