• Title/Summary/Keyword: planning phase

Search Result 744, Processing Time 0.032 seconds

Investigation of the behavior of an RC beam strengthened by external bonding of a porous P-FGM and E-FGM plate in terms of interface stresses

  • Zahira Sadoun;Riadh Bennai;Mokhtar Nebab;Mouloud Dahmane;Hassen Ait Atmane
    • Structural Monitoring and Maintenance
    • /
    • v.10 no.4
    • /
    • pp.315-337
    • /
    • 2023
  • During the design phase, it is crucial to determine the interface stresses between the reinforcing plate and the concrete base in order to predict plate end separation failures. In this work, a simple theoretical study of interface shear stresses in beams reinforced with P-FGM and E-FGM plates subjected to an arbitrarily positioned point load, or two symmetrical point loads, was presented using the linear elastic theory. The presence of pores in the reinforcing plate distributed in several forms was also taken into account. For this purpose, we analyze the effects of porosity and its distribution shape on the interracial normal and shear stresses of an FGM beam reinforced with an FRP plate under different types of load. Comparisons of the proposed model with existing analytical solutions in the literature confirm the feasibility and accuracy of this new approach. The influence of different parameters on the interfacial behavior of reinforced concrete beams reinforced with functionally graded porous plates is further examined in this parametric study using the proposed model. From the results obtained in this study, we can say that interface stress is significantly affected by several factors, including the pores present in the reinforcing plate and their distribution shape. Additionally, we can conclude from this study that reinforcement systems with composite plates are very effective in improving the flexural response of reinforced RC beams.

An empirical study of the risk-benefit perceptions between the nuclear and non-nuclear groups towards the nuclear power plant in Bangladesh

  • Md Shafiqul Islam;Swapnil Roy;Sadia Lena Alfee;Animesh Pal
    • Nuclear Engineering and Technology
    • /
    • v.55 no.12
    • /
    • pp.4617-4627
    • /
    • 2023
  • Public perception of benefit over risk is the de facto factor in planning, construction, operation, halting, or phase-out of a nuclear power plant in any country. Even if there are multiple pathways of perceiving risk/benefit among different stakeholders, the perception of nuclear and non-nuclear groups needs to be individually tracked to help understand sectoral influence. Related studies were basically performed between the STEM (Science, Technology, Engineering, and Mathematics) and non-STEM groups. However, there are no such studies between the nuclear and non-nuclear groups. This study investigated the risk-benefit perceptions between the nuclear group (N = 102) and the non-nuclear group (N = 467) using survey data to measure their stake and identify the underlying factors by validating the hypotheses, through descriptive analysis, and structural equation modeling (SEM). Results showed that risk perception is significantly high in the non-nuclear group (as the P-value is > 0.001 to <0.01) while the benefit perception is slightly low in the nuclear group (as the P-value is > 0.01 to <0.05). The non-nuclear group was significantly influenced by risk perception due to a lack of involvement in nuclear activities. Notably, the nuclear group is less interactive in disseminating nuclear energy benefits to the non-nuclear group. Surprisingly, misperceptions and lack of confidence about the benefits of nuclear energy also exist in the nuclear group. The study emphasizes debunking nuclear myths in the nuclear and non-nuclear groups through meaningful interactions and demands effective public awareness-building programs by competent authorities for the growth of the nuclear industry.

Analysis on the Decrease of Planning Target Volume in the Case of Lung Radiation Surgery with the Application of Respiratory Gated Radiotherpy Method (폐암 환자의 방사선수술 시 호흡연동 방사선치료 방법의 적용을 통한 계획용표적체적 감소 효과 분석)

  • Song, Ju-Young;Nah, Byung-Sik;Chung, Woong-Ki;Ahn, Sung-Ja;Nam, Taek-Keun;Yoon, Mee-Sun;Jung, Jae-Uk
    • Progress in Medical Physics
    • /
    • v.19 no.4
    • /
    • pp.263-268
    • /
    • 2008
  • The application of a respiratory gated radiotherpy method to the lung radiation surgery was evaluated compared with the conventional method in which the whole tumor motion range is considered in the delineation of PTV (Planning target volume). The four dimensional CT simulation images were acquired for the five NSCLC (Non-small cell lung cancer) patients for radiation surgery. The respiratory gated plan was prepared with the 50% phase CT images and the conventional method was planned based on the ITV (Internal target volume) which include all the target volumes created in each phase CT images within a whole respiratory period. The DVH (Dose volume histogram) of OAR (Organ at risk) which calculated in each method was compared for the evaluation of the plan properness. The relative decrease of OARs' DVH were verified in the application of respiratory gated method. The average decrease rate were $16.88{\pm}9.97%$ in the bronchus, $34.13{\pm}19.15%$ in the spinal cord, $28.42{\pm}18.49%$ in the chest wall and $32.48{\pm}16.66%$ in the lung. Based on these results, we can verified the applicability and the effectiveness of the respiratory gated method in the lung radiation surgery.

  • PDF

Approach to improve construction management using Information Technology (IT) (정보기술(IT) 기반을 통한 시공관리 선진화 방안)

  • Lee Woo-Bang;Moon Jin-Yeong;Moon Byeong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.115-122
    • /
    • 2002
  • There is various points that should be improved in Fairness such as our contract practice to propose construction projects, project managing and the stakeholders' way of thinking and culture. We consider that the revision of construction related provisions and systems is required but even more, an overall change in business management through the implementation of Integrated Construction Information Management System that will enable the owner, which drives the project, and contractor sharing construction information is required. To mange construction related information in an integrated manner, designing information should be smoothly transferred to purchasing information, and changes are required in order to move ahead to process-oriented work system. Finally information created from various construction organizations should be delivered in an aligned and standardized manner as well. The domestic Nuclear Power Plant Construction has been accepting various technology transfers from U.S, France, Canada and UK, which enabled us to self-support technology and recently even proceeded to the phase exporting our technology to others. However, continuous effort is required to improve internal business efficiency and to respond to external environmental change such aselectricity market deregulation. Recently, in accordance with the result in number of CEO's intention to make progress in IT and improve business efficiency, the number of enterprises introducing Enterprise Resource Planning is increasing. ERP is an innovative tool which changes the way of performing work from organization and department orientation to process-orientation in order to optimize the resources, such as human and material resources, through out the Enterprise by performing BPR which will maximize overall business efficiency of the enterprise, such includes not only construction management, but also business management. KHNP continued to performing large scaled construction projects such as nuclear power plant construction for past 30 years and took the initiatives of large scale project management and Quality management ability in domestic industry by having independent capability of over all construction planning, purchasing and, construction and start up management etc. To maintain our leading position of improving construction management technology based on our accumulated project management experience and technology, KHNP included construction into our ERP project in purpose of innovating construction business. We would like to discuss the characteristics of nuclear construction business, project management system, information system infrastructure and information sharing system among construction related entities, and implementation practices for information system, and consider how to resolve our practice that should be improved in this thesis.

  • PDF

Design Strategies and Processes through the Concept of Resilience (리질리언스 개념을 통해서 본 설계 전략과 과정)

  • Choi, Hyeyoung;Seo, Young-Ai
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.46 no.5
    • /
    • pp.44-58
    • /
    • 2018
  • Cities face new challenges not only in natural disasters by climate change but also in social and economic fluctuations. With the existing simple reconstruction method, it is difficult to solve the overall problems that a city or region may face. As a new approach to cope with various changes, the concept of resilience is emerging. Resilience is also one of the themes of recent major urban design projects. Design with the concept of resilience is a new strategy that can deal with various changes of urban space, rather than a temporary trend. The purpose of this paper is to explore the design method by analyzing cases where the concept of resilience is employed. We aim to examine what kind of design strategies are needed for the resilience design and how this design process differ in character, as compared to general design projects. Cases for this study include the "Rebuild by Design" competition held in 2013 and the "Resilient by Design/Bay Area Challenge" competition held in 2017. This paper consists of literature reviews and case studies. The latter is divided into two aspects: content analysis based on the theory of resilience and characteristics of the design process. Cases are analyzed through literature reviews and process characteristics of resilience design in response to the general design process. The main categories for urban resilience used as the framework for analysis include: Urban Infrastructure, Social Dynamics, Economic Dynamics, Health and Wellbeing, Governance Networks, and Planning and Institutions. As a result, the aspects of resilience concepts considered and design strategies undertaken by each team were identified. Each team tried to connect all 6 categories to their design strategies, placing special value on the role of governance, a system that enables collaborative design and project persistency. In terms of the design process, the following characteristics were found: planning the whole project process in the pre-project phase, analyzing predictable socioeconomic risk factors in addition to physical vulnerabilities, aiming for landscape-oriented integrated design, and sustainable implementation strategies with specific operations and budget plans. This paper is meaningful to connect the concept of resilience, which has been discussed in various articles, to design strategy, and to explore the possibility of constructing a practical methodology by deriving the characteristics of the resilience design process. It remains a future task to research design strategies that apply the concept of resilience to various types of urban spaces, in addition to areas that are vulnerable to disasters.

A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment (공공주택 실적공사비 분석을 통한 공사비 리스크에 관한 연구)

  • Yoon, Woo-Sung;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.65-78
    • /
    • 2011
  • Construction business, which is complex and long-term business, requires accurate estimation and verification in construction costs and payment procedure from project planning to the completion of construction phase. And more importantly, it is necessary to investigate and determine the risk factors related to construction costs during the entire process including design planning, construction drawings, and quantity calculating. But, currently, it is not seem to be adequate to cope with the risk and increased construction costs against the operational budget in terms of actual costs when screening and estimating the bidding cost of public apartment. Therefore, this study selected and analyzed 40 sites' report of construction completion account from 2004 to 2010 focused on the adequacy on the modification of contract and design planning and on the complication of the budget in the beginning of the project. This study deducted various risk causes and results by analyzing actual costs according to year, architectural area, region, construction cost and sale/lease classification. We could find out construction risk according to annual variation of government policy and economy, and also deducted risk items by construction characteristic according to region and architectural area. Study result, we first found out the problems of lowest price award system according to the construction costs. The weight of the cost increase risk was analyzed that subcontract and material costs are very high. Roof and tile work were analyzed highly in subcontract cost risk and reinforcing bar and cement were analyzed highly in material cost risk, among direct construction cost. Finally, this study results could be used in comparing the categories of the construction costs made by specific construction process, belonging to the construction costs, with the operational budget made in the beginning of the project that can enable to grasp unpredictable risks over the construction costs and making quantitative analysis for it through analyzing the range of fluctuation and variations led by the fluctuations in the actual construction costs.

Changes of Ecosystem Services in Agricultural Area According to Urban Development Scenario - For the Namyangju Wangsuk District 1, the 3rd Phase New Town - (도시개발 시나리오에 따른 농업지역의 생태계서비스 변화 분석 - 3기 신도시 남양주 왕숙1지구를 대상으로 -)

  • Kim, Sukyoung;Choi, Jaeyeon;Park, Chan;Song, Wonkyong;Kim, Suryeon
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.2
    • /
    • pp.117-131
    • /
    • 2021
  • Urban development is continuously being carried out to stabilize housing supply. The importance of ecosystem services assessments considering the various urban spatial structures is emerging as land use change in the wake of urban development has impact on the provision of ecosystem services. However, few studies are available as to the effects of land use transition in agricultural land due to urban development on ecosystem services. The purpose of this study is to examine the applicability of decision-making in the urban planning process by analyzing the impact of land use change on ecosystem services due to urban development. Therefore, the scenario was set on before and after the city development, targeting Namyangju Wangsuk Zone 1 and InVEST model was used to compare and analyze changes in value of ecosystem services. Analysis results of ecosystem services before the urban development, it turned out that habitat quality and water yield increased overtime but carbon storage and crop production decreased. Analysis results of ecosystem services after the urban development indicated that all items in ecosystem services by scenario decreased more than in 2018. Among the scenarios of urban development, compact city had the lowest value of water resource supply but had the highest value in terms of habitat quality, carbon storage amount, and crop production. The study results demonstrate that the compact city has positive effects on ecosystem services and is expected to be used as the basic data for supporting policy decision-making in the establishment of future urban development and management plans.

4-Dimensional dose evaluation using deformable image registration in respiratory gated radiotherapy for lung cancer (폐암의 호흡동조방사선치료 시 변형영상정합을 이용한 4차원 선량평가)

  • Um, Ki Cheon;Yoo, Soon Mi;Yoon, In Ha;Back, Geum Mun
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.30 no.1_2
    • /
    • pp.83-95
    • /
    • 2018
  • Purpose : After planning the Respiratory Gated Radiotherapy for Lung cancer, the movement and volume change of sparing normal structures nearby target are not often considered during dose evaluation. This study carried out 4-D dose evaluation which reflects the movement of normal structures at certain phase of Respiratory Gated Radiotherapy, by using Deformable Image Registration that is well used for Adaptive Radiotherapy. Moreover, the study discussed the need of analysis and established some recommendations, regarding the normal structures's movement and volume change due to Patient's breathing pattern during evaluation of treatment plans. Materials and methods : The subjects were taken from 10 lung cancer patients who received Respiratory Gated Radiotherapy. Using Eclipse(Ver 13.6 Varian, USA), the structures seen in the top phase of CT image was equally set via Propagation or Segmentation Wizard menu, and the structure's movement and volume were analyzed by Center-to Center method. Also, image from each phase and the dose distribution were deformed into top phase CT image, for 4-dimensional dose evaluation, via VELOCITY Program. Also, Using $QUASAR^{TM}$ Phantom(Modus Medical Devices) and $GAFCHROMIC^{TM}$ EBT3 Film(Ashland, USA), verification carried out 4-D dose distribution for 4-D gamma pass rate. Result : The movement of the Inspiration and expiration phase was the most significant in axial direction of right lung, as $0.989{\pm}0.34cm$, and was the least significant in lateral direction of spinal cord, as -0.001 cm. The volume of right lung showed the greatest rate of change as 33.5 %. The maximal and minimal difference in PTV Conformity Index and Homogeneity Index between 3-dimensional dose evaluation and 4-dimensional dose evaluation, was 0.076, 0.021 and 0.011, 0.0 respectfully. The difference of 0.0045~2.76 % was determined in normal structures, using 4-D dose evaluation. 4-D gamma pass rate of every patients passed reference of 95 % gamma pass rate. Conclusion : PTV Conformity Index was more significant in all patients using 4-D dose evaluation, but no significant difference was observed between two dose evaluations for Homogeneity Index. 4-D dose distribution was shown more homogeneous dose compared to 3D dose distribution, by considering the movement from breathing which helps to fill out the PTV margin area. There was difference of 0.004~2.76 % in 4D evaluation of normal structure, and there was significant difference between two evaluation methods in all normal structures, except spinal cord. This study shows that normal structures could be underestimated by 3-D dose evaluation. Therefore, 4-D dose evaluation with Deformable Image Registration will be considered when the dose change is expected in normal structures due to patient's breathing pattern. 4-D dose evaluation with Deformable Image Registration is considered to be a more realistic dose evaluation method by reflecting the movement of normal structures from patient's breathing pattern.

  • PDF

Study on Tree Growth and Soil Environment Relations of Sudokwon Landfill (수도권매립지수목생육과토양환경의관계연구)

  • Kang, Seong-Chil;Han, Bong-Ho;Choi, Jin-Woo;Jang, Jae-Hoon;Kim, Hong-Soon
    • Korean Journal of Environment and Ecology
    • /
    • v.29 no.3
    • /
    • pp.431-440
    • /
    • 2015
  • This study investigated the correlation between the trees planted on the slope of the first landfill where the landfill was completed and the soil environment. 69 plots (($7{\sim}20m{\times}5{\sim}20m$) were planted with 26 kinds of major trees in the first landfill slopes for vegetation survey. The survey was conducted from 2007 to 2009. Soil analysis from 2007 to 2008 was made on the basis of the injured index and the indicator species were selected. Depending on the rate of growth of the indicator species, seven survey locations were selected for soil sample analysis. 10 tree species appeared to adapt to the landfill environment. Among them, the coniferous trees were Pinus thunbergii (Seedling) and Juniperus chinensis and the deciduous trees were Quercus aliena, Salix preudo-lasiogyne, Castanea crenata (Seedling), Prunus armeniaca var. ansu, Quercus acutissima, Chionanthus retusus, Liriodendron tulipifera (Seedling) and Celtis sinensis. 8 species of trees did not adapt well to the landfill environment. Among them, two kinds were coniferous, the other six kinds were deciduous. In addition, judgment on the other 8 species of trees as to whether they adapted well or not was postponed. The species for which judgment was postponed included one coniferous tree and seven deciduous trees. Indicator species of injured index was the species that have more than 25 % of the defect. The soil was collected from where Catalpa ovata, Sophora japonica, Albizzia julibrissin and Acer palmatum were planted for analysis. According to the soil analysis, the soil pH showed that the soil was alkaline. Regarding the three phases of the soil, most sample soil showed 60 % for the solid phase or 55 % for the solid phase but with less than 10 % of gas phase. The organic matter content was found to be 0.14 to 2.52 %.

The Yellow Sea Ecoregion Conservation Project : the Present Situation and its Implications (황해생태지역 보전사업 추진현황 및 시사점)

  • Kim, Gwang Tae;Choi, Young Rae;Jang, Ji Young;Kim, Woong-Seo
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.15 no.4
    • /
    • pp.337-348
    • /
    • 2012
  • The Yellow Sea Ecoregion Conservation Project is a joint international project which is carried out under the purposes of conserving the habitats in the Yellow Sea Ecoregion and biodiversity from various threats that damage ecosystems, informing the importance and value of the Yellow Sea Ecoregion, and promoting the understanding and interests of Korea, China and Japan. Subsequent to the Yellow Sea Ecoregion Planning Programme which had been performed during the period from 2002 to 2006, the Yellow Sea Ecoregion Support Project has been performed over 7 years in total from 2007 to 2014. Panasonic is sponsoring the financing of the project, and the organizations in charge of the project by country are Korea Institute of Ocean Science & Technology for Korea and World Wide Fund for Nature branches for China and Japan. While the Yellow Sea Ecoregion Planning Programme was focused on the biological assessment and the selection of potential priority area by scientific review, the Yellow Sea Ecoregion Support Project is oriented toward practical activities targeting more diversified stakeholder. Especially, this project plans to support direct conservation activities in the region and participation and cooperation from local residents. The project plan is comprised of 3 phases. During the first period from 2008 to 2009, small grant projects were operated targeting 16 institutions of Korea and China, and for the second period from 2010 to 2012, one place each was selected as demonstration site for habitat conservation in Korea and China respectively and supported for three years to introduce the conservation method based on international standards such as the management of marine protected areas, ecosystem-based management and community-based management and simultaneously to develop habitat conservation activities suitable for national and regional characteristics. During the period from 2013 to 2014 which is the last phase, the project plans to distribute the performance of small grant projects and demonstration site activities through a series of forums among stakeholder. Through the activities described above, the recognition of general public on the conservation of the Yellow Sea Ecoregion was changed positively, and community-based management began to be reflected in the policies for the marine protected areas of central and local government.