• Title/Summary/Keyword: pit sand

Search Result 20, Processing Time 0.055 seconds

Behavior of the ground in rectangularly crossed area due to tunnel excavation under the existing tunnel (I) (기존터널에 근접한 직각교차 하부터널의 굴착에 따른 교차부지반의 거동 (I))

  • Kim, Dong-Gab;Kim, Seung-Hyun;Hong, Suk-Bong;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.1
    • /
    • pp.3-12
    • /
    • 2005
  • The behaviors of the ground in crossed zone and the existing upper tunnel in shallow cover due to the excavation of new lower tunnel Rectangularly crossed to that was studied. Model tests were performed in the large scale test pit, the size was '$4.0m(width){\times}3.8m(height){\times}4.1m(length)$'. Test ground was constructed uniformly by sand in middle density. Results of the model tests show that earth pressure and settlement of the ground in crossed zone were redistributed due to the longitudinal arching effect by the excavation of lower tunnel. Upper tunnel blocks stress flow due to the longitudinal arching effect by excavation of lower tunnel.

  • PDF

Stability of A Surcharged Tunnel under the Effect of Pre-Loading on the Adjacent Braced Wall (근접한 흙막이벽체에 가하는 선행하중의 영향을 받는 상재하중 재하 터널의 안정)

  • Kim, IL;Lee, Sang Duk
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.2
    • /
    • pp.10-27
    • /
    • 2008
  • When the ground is excavated adjacent to the existing tunnel, which is loaded by the surcharge on the ground surface, the tunnel stability would be very sensitive to the deformation of the ground induced by the horizontal displacement of braced wall. The stability of the existing surcharged tunnel could be controlled by pre-loading on the braced wall. In this paper, it was investigated, if it would be possible to keep the existing surcharged tunnel stable by preventing the horizontal displacement of a braced wall by imposing the pre-loading during the ground excavation. For this purpose, large scale model tests were performed in a scale 1/10 at the test pit which was 2.0m in width and 6.0m in height and 4.0m in length. Isotropic test ground was constructed homogeneously by wet sand. Model tunnel was constructed in the test ground. Surcharge was loaded on the ground surface above the tunnel. During the tests, the behavior of model tunnel and model braced wall was measured. Numerical analyses were also performed in the same condition as the tests. And their results were compared to that of the model tests. Consequently, the effect of a surcharge could be compensated by imposing the pre-loading on the braced wall. The existing tunnel and the braced wall could be kept stable by preventing the horizontal displacement of the braced wall through pre-loading, although the tunnel is surcharged.

  • PDF

Evaluation of Field Application and Estimation of Bedload Discharge in the Forest Watershed using the Hydrophone (하이드로폰을 이용한 산림유역 소류사 유출량 산정 및 현장 적용성 검토)

  • Seo, Jun-Pyo;Kim, Ki-Dae;Woo, Choong-Shik;Lee, Chang-Woo;Lee, Heon-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.807-818
    • /
    • 2020
  • In this study, hydrophones using acoustic sensors were used to estimate the amount of bedload discharge in a forested watershed. The reaction characteristics were analyzed through hydrophone flume tests and field tests, and the quantitative bedload discharge was calculated and compared with that measured by a pit sampler. The hydrophone reaction changed the pulse according to the flow rate change, but did not react to standard sand. The pulse was different depending on the particle size and weight, and accordingly, there was a specific channel showing a suitable response. For a hydrophone installed in the field, by using an automatic impact device, the reaction characteristics of each channel were analyzed to confirm normal operation of the sensor and the suitability of the output value of each channel. In addition, a suitable channel was selected for the estimation of bedload discharge. The bedload discharge formula was developed using a hydrophone pulse and the average flow rate, and was compared with the measured data in the pit sampler in the study site. As a result of the study, if a hydrophone is used for monitoring the bedload in forested watersheds, it is considered effective in quantitatively estimating the weight of bedload discharge.

Behavior of tunnel under the influence of pre-loading on braced wall during the adjacent ground excavation (근접굴착 시 벽체에 선행하중 재하에 따른 터널의 거동)

  • Kim, Il;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.4
    • /
    • pp.331-341
    • /
    • 2007
  • Pre-loads could be imposed on the braced wall to prevent the horizontal displacements during the ground excavation adjacent to the existing tunnel. For this purpose, new pre-loading system through which large pre-loads could be applied to the braced wall was used in the model tests. Large scale model tests were performed in the real scale test pit which was 2.0 m in width and 6.0 m in hight and 4.0 m in length. Test ground was constructed by sand. Model tunnel in 1.2 m diameter was constructed before test ground excavation. Test ground was excavated adjacent to existing tunnel and was braced. To investigate the effect of pre-loading, tests without pre-load were also performed. During the ground excavation were the behavior of braced wall, test tunnel, and ground measured. Model tests were also numerically analysed and their results were compared to that of the real scale tests. As a result, it was found that the stability of the existing tunnel was greatly enhanced when the horizontal displacements of braced wall was reduced by applying pre-load larger than the design load.

  • PDF

GPR using optical electric field sensor (광전계 센서(optical electric field sensor)를 이용한 GPR)

  • Cho Seong-Jun;Tanaka Ryohey;Sato Motoyuki;Kim Jung-Ho
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2005.05a
    • /
    • pp.215-220
    • /
    • 2005
  • In order to apply to land mine detection effectively, GPR using an optical electric field sensor as a receiver has been developed. The optical electric field sensor is very small and uses optical fiber instead of metallic coaxial cable. With the combination of these advantages and the bistatic radar system, it can be possible for an operator to measure quite flexible and safely. The sensor has been tested in stepped frequency radar system with frequency which consists of a vector network analyzer, a fixed double ridged horn antenna as transmitter. For considering effectiveness in real field, we applied impulse radar system, which consist of a digital oscilloscope and a impulse generator to produce the impulse. Detection of a PMN2 mine model was carried out by the impulse radar system at a sand pit. The PMN2 were detected clearly with sufficiently high resolution, the target contrast was almost the same while the scanning time decreased down to 1/100.

  • PDF

Behavior of the Ground in Obliquely Crossed area Due to Tunnel Excavation Under the Existing Tunnel (기존터널에 근접하여 경사로 교차되는 하부터널굴착에 따른 교차부지반의 거동)

  • Kim, Dong-Gab;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.4
    • /
    • pp.285-294
    • /
    • 2005
  • The behaviors of the ground in crossed zone and the existing upper tunnel in shallow cover due to the excavation of new lower tunnel crossed to that was studied. Model test was performed in the large scale test pit, the size was '$4.0m(width){\times}3.8m(height){\times}4.1m(length)$'. Test ground was constructed uniformly by sand in middle density and test with the crossed angle of $56^{\circ}$ (obliquely) were performed. The numerical analysis was performed on equal condition with model test. Results of the study by model test and numerical analysis show that earth pressure and settlement of the ground in crossed zone were redistributed due to the longitudinal arching effect by the excavation of lower tunnel. Model test shows that upper tunnel blocks stress flow due to the longitudinal arching effect by excavation of lower tunnel.

  • PDF

Brief Review of Tailings Treatments in Oil Sands Field (오일샌드 테일링 처리 동향연구)

  • Kyeongseok Oh
    • Journal of the Korean Applied Science and Technology
    • /
    • v.40 no.2
    • /
    • pp.332-341
    • /
    • 2023
  • The controversy is becoming a hot issue after informed that the water release from Canadian oil sands tailings may initiate within a few years. The surface-mined bitumen extraction in open pit generates wastewater inevitably, which has been conveyed to store in tailings ponds. Currently, the size of tailings pond is getting seriously larger. It is known that tailings treatment is very difficult because the generation of MFT (mature fine tailings) layer is hardly processable. It would be the key process to separate solids and liquid placed within MFT where fine particles are well dispersed. In this paper, the surface-mined bitumen extraction process was first introduced, and followed by presenting the components of tailings as well as the characteristics of MFT. In addition, MFT process options were evaluated. It is expected that successful MFT treatments may be achieved by dewatering process using effective polymer flocculants in near future.

Geochemical exploration for REE occurrence in Nghe An Area within Northern Vietnam (베트남 북부 네안 희토류 산출지의 지구화학탐사)

  • Heo, Chul-Ho;Chung, Ho Tien;Lee, Jae-Ho
    • Economic and Environmental Geology
    • /
    • v.45 no.6
    • /
    • pp.599-622
    • /
    • 2012
  • The phase I soil geochemical exploration was carried out targeting around Chau Binh area far from about 14 km with southeastern direction from Quy Chau within Nghe An province. The interval of sampling are horizontal 300 m with 14 line and longitudinal 500 m with 15 line, resulting in 194 soil samples. Based on the result of the phase I soil geochemical exploration, the phase II detailed pitting survey was carried out targeting the grid point with high TREO content, resulting in 56 soil samples within 7 pits. The geology of survey area are consisted of Ban Chieng biotite granite complex and Dai Loc gneissic granite complex intruding Bu Khang formation comprising of schist, gneiss and limestone. Main mineralization in the study area have the characteristics of occurrence with tin, ruby and REE-bearing monazite(about 300 g/t) and xenotime(about 10 g/t) to be thought as occurring at the alteration zone of granite complex. In order to elucidate the source rock of monazite and xenotime confirmed from heavy sand, soil geochemical exploration was carried out. As a analysis result with ICP-MS on the soil samples from the phase I soil geochemical exploration, total REE oxide content of background amount to about 2 times of crustal abundance, enriching the heavy rare earth(about 2 times) and light rare earth(about 1.84 times). As a analysis result with ICP-MS on the soil samples from the phase II soil detailed pit survey, we identified outcrop considering as economic ore body at the grid point 4-7 pit with N40W attitude. As a synthetic consideration on the phase I soil geochemical exploration and phase II detailed pit survey, we tentatively designated areas considering as the extension of economic ore body with REE anomaly. In the near future, we have the plan to carry out the geophysical exploration and test drilling targeting the interval anticipated to the economic ore body.

Geochemical Exploration for Tri Le REE Occurrence in Nghe An Province within Northern Vietnam (베트남 북부 네안성 칠레 희토류 산출지의 지구화학탐사)

  • Heo, Chul-Ho;Ho, Tien Chung;Lee, Jae-Ho
    • Economic and Environmental Geology
    • /
    • v.47 no.2
    • /
    • pp.147-168
    • /
    • 2014
  • The soil geochemical exploration was carried out targeting around Tri Le area far from about 30 km with northwestern direction from Que Phong within Nghe An province. The interval of sampling are horizontal 200 m interval with 23 line and longitudinal 300 m with 10 line, resulting in 228 soil samples. Based on the result of the soil geochemical exploration, the detailed pitting survey was carried out targeting the grid point with high TREO content, resulting in 75 soil samples within 7 pits. The geology of survey area are consisted of Ban Chieng biotite granite complex and granitic gneiss intruding Ban Khang formation comprising of quartz schist and marble. Main mineralization in the study area have the characteristics of occurrence with tin, ruby and REE-bearing monazite and xenotime to be thought as occurring at the alteration zone of granite complex. In order to elucidate the source rock of monazite and xenotime confirmed from heavy sand, soil geochemical exploration was carried out. As a analysis result with ICP-MS on the soil samples from the soil geochemical exploration, total REE oxide content of background amount to about 2 times of crustal abundance, enriching the heavy rare earth(about 2 times) and light rare earth(about 1.5 times). As a analysis result with ICP-MS on the soil samples from the soil detailed pit survey, we only identified outcrop considering as economic weathered granite body at the grid point 1-10 pit among 7 pits. As a synthetic consideration on the soil geochemical exploration and detailed pit survey, we tentatively designated Tri Le area as no promising target for REE. In 2014, we have the plan to carry out the soil geochemical exploration targeting the extended economic REE ore body in Quy Chau as project area from 2011 to 2012.

REE Mineralization of Quy Hop Area in Nghe An Province, Northern Vietnam (베트남 북부 네안성 뀌홉지역 희토류 광화작용)

  • Lee, Jae-Ho;Jin, Kwang-Min;Heo, Chul-Ho
    • Journal of the Mineralogical Society of Korea
    • /
    • v.31 no.3
    • /
    • pp.193-213
    • /
    • 2018
  • Soil geochemical exploration to check anomalies related to mineralization was carried out targeting around Quy Hop area within Nghe An province, Northern Vietnam. The interval of sampling are horizontal 250 m with 13 line and longitudinal 300 m with 25 line, resulting in 325 soil samples. Based on the result of soil geochemical exploration, the pitting survey was carried out targeting the grid point with high TREO content, resulting in 73 soil samples within 8 pits. The geology of the survey area are consisted of Ban Chieng biotite granite complex intruding Bu Khang formation comprising of schist, gneiss and limestone. In order to elucidate the source rock of monazite and xenotime confirmed from heavy sand, soil geochemical exploration was carried out. By ICP-MS result of soil samples, total REE oxide content of background amount is about 1.4 times of crustal abundance, depleting the light rare earth (about 0.2 times) and enriching the heavy rare earth (about 1.5 times). By ICP-MS result of pit soil samples, we identified TREO more than 1,000 ppm in 6 pits. It may be considered that REE ore bodies may develop in NE-SW direction, compared with the geochemical results of Quy Chau area.