• 제목/요약/키워드: pilot scale

Search Result 1,179, Processing Time 0.247 seconds

[ $CO_2$ ] Recovery from LNG-fired Flue Gas Using a Multi-staged Pilot-scale Membrane Plant (파일럿규모의 다단계 막분리 공정을 통한 LNG 연소 배가스로부터 이산화탄소의 회수연구)

  • Kim, Jeong-Hoon;Choi, Seung-Hak;Kim, Beom-Sik;Lee, Soo-Bok;Lee, Yong-Taek
    • Membrane Journal
    • /
    • v.17 no.3
    • /
    • pp.197-209
    • /
    • 2007
  • In this study, a multi-staged pilot-scale membrane plant was constructed and operated for the separation of $CO_2$ from LNG-fired boiler flue gas of 1,000 $Nm^3/day$. The target purity and recovery ratio of $CO_2$ required for the pilot plant were 99% and 90%, respectively. For this purpose, we previously developed the asymmetric polyethersulfone hollow fibers and evaluated the effects of operating pressure and feed concentration of $CO_2$ on separation performance[1,2]. The permeation data obtained were also analyzed in relation with the numerical simulation data using counter-current flow model[3,4]. Based on these results, we designed and prepared the demonstration plant consisting of dehumidification process and four-staged membrane process. The operation results using this plant were compared with the numerical simulation results on multi-staged membrane process. The experimental results matched well with the numerical simulation data. The concentration and the recovery ratio of $CO_2$ in the final stage permeate stream were ranged from $95{\sim}99%$ and $70{\sim}95%$, respectively, depending on the operating conditions. This study demonstrated the applicability of the membrane-based pilot plant for $CO_2$ recovery from flue gas.

Institutionalization of a Patient-Sitter Program in Acute Care Hospitals (보호자 없는 병원 제도화 방안)

  • You, Sun-Ju;Choi, Yun-Kyoung
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.6
    • /
    • pp.370-379
    • /
    • 2013
  • In an effort to resolve the burden of patients hiring patient sitters, this study sought to review the Ministry-of-Health-and-Welfare-initiated pilot program of running hospitals without patient-sitter to identify its background, operation method, performance results, and limitations. Based on the review, the study derived the necessity of introducing a hospital system without patient-sitter as well as its operation and systemization methods. The ministry-initiated pilot programs were conducted twice: in 2007, and in 2010. A review of the 2007 pilot program revealed that the patients and families' satisfaction score with nursing services was 9.1 points (on a 10-point scale), their intention to reuse the service was 97.8%, and their intention to recommend the service was 98.0%, all high scores. Appropriate nursing manpower, derived from the 2007 pilot project, indicated 2.3 patients per nurse and 4.0 patients per nurse aid. The 2010 pilot project results indicated that the patients and families' satisfaction was high at 8.0-9.1 points (on a 10-point scale), and that the intention to reuse and recommend the service was also high. Compared with the 2007 pilot project, however, the types of medical institutions and the nurse to patient ratios were diverse, offering limitations. In conclusion, to systemize hospitals without patient-sitter, it is necessary to develop policies designed to establish criteria for the appropriate nurse to patient ratio and skill-mix, to standardize the work, to prepare finances for securing nursing staff, to evaluate the nursing demands, and to monitor the quality management.

Alkaline Pilot Processing for Recovery of Fish Muscle Protein and Properties of Recovered Protein (어육 단백질 회수를 위한 알칼리 Pilot 공정과 회수 단백질의 특성)

  • Jang, Young-Boo;Kim, Gun-Bae;Lee, Keun-Woo;Choi, Yeung-Joon
    • Journal of the Korean Society of Food Science and Nutrition
    • /
    • v.35 no.8
    • /
    • pp.1045-1050
    • /
    • 2006
  • Optimum operation condition for pilot scale of alkaline processing for fish muscle was investigated by measuring protein solubility, yield, texture, and water-holding capacity. Recovered protein yield was 33.2% for whole fish and 61.8% for minced muscle. Optimum homogenized speed and time, using industrial scale homogenizer, were 3,000 rpm and 5 min, respectively. Limited centrifugal force of continuous cylinder type was 4,000 rpm for recovering soluble protein, and 2,000 rpm for recovering precipitated proteins. The pH control agents such as citric acid, sodium phosphate and calcium oxide decreased the breaking force and deformation of recovered protein gel. The breaking force and deformation of the recovered proteins were high compared to conventional surimi. The breaking force and deformation were decreased by addition of salt, starch and bovine plasma proteins. Whiteness of recovered protein gel was lower than that of conventional surimi. Alkaline processing greatly decreased nitrogen content and chemical oxygen demand in waste water. The results suggest that alkaline processing has a potential as industrial production for recovering the proteins from fish muscle.

Comparative performance evaluation of two UF pilot plants at the Alto da Boa Vista WTP (São Paulo, Brazil)

  • Oliveira, T.F.;Mierzwa, J.C.
    • Membrane and Water Treatment
    • /
    • v.2 no.3
    • /
    • pp.175-185
    • /
    • 2011
  • Ultrafiltration is an emerging technology for drinking water treatment because it produces better water quality as compared with conventional treatment systems. More recently, the combination of UF technology with other processes in order to improve its performance has been observed. These associations aim to maximize the contaminants removal and reduce membrane fouling. The operational performance of contaminants removal and water production of two UF pilot plants was compared. The first plant (Guarapiranga) was fed with raw water and the second plant (ABV) with pre-treated water by the coagulation, flocculation and sedimentation processes at Alto da Boa Vista WTP (Sao Paulo, Brazil). Both units operated continuously for approximately 2,500 hours, from September/2009 to January/2010. The results showed that the ABV UF pilot plant was able to operate at higher specific fluxes (6.2 $L.d^{-1}.m^{-2}.kPa^{-1}$ @ $25^{\circ}C$) than Guarapiranga (3.1 $L.d^{-1}.m^{-2}.kPa^{-1}$ @ $25^{\circ}C$). However, the number of chemical cleanings conducted in both pilot units during the considered operation period was the same (4 chemical cleanings for each plant), which shows that the pre-treatment reduced the membrane fouling. The water quality at ABV for all the variables analyzed was better, but the feed water quality was also better due to pretreatment. The rejection values for the different contaminants were higher at Guarapiranga mainly because of a pollution load reduction after pre-treatment at ABV. Even with the better performance of the ABV UF pilot plant, it is necessary to take into consideration the complexity of the complete treatment system, and also the costs involved in the construction and operation of a full-scale treatment unit.

Application of Scale-Up Criterion of Constant Oxygen Mass Transfer Coefficient ($k_La$) for Production of Itaconic Acid in a 50 L Pilot-Scale Fermentor by Fungal Cells of Aspergillus terreus

  • Shin, Woo-Shik;Lee, Dohoon;Kim, Sangyong;Jeong, Yong-Seob;Chun, Gie-Taek
    • Journal of Microbiology and Biotechnology
    • /
    • v.23 no.10
    • /
    • pp.1445-1453
    • /
    • 2013
  • The scale-up criterion of constant oxygen mass transfer coefficient ($k_La$) was applied for the production of itaconic acid (IA) in a 50 L pilot-scale fermentor by the fungal cells of Aspergillus terreus. Various operating conditions were examined to collect as many $k_La$ data as possible by adjusting the stirring speed and aeration rate in both 5 L and 50 L fermentor systems. In the fermentations performed with the 5 L fermentor, the highest IA production was obtained under the operating conditions of 200 rpm and 1.5 vvm. Accordingly, we intended to find out parallel agitation and aeration rates in the 50 L fermentor system, under which the $k_La$ value measured was almost identical to that ($0.02sec^{-1}$) of the 5 L system. The conditions of 180 rpm and 0.5 vvm in the 50 L system turned out to be optimal for providing almost the same volumetric amount of dissolved oxygen (DO) into the fermentor, without causing shear damage to the producing cells due to excessive agitation. Practically identical fermentation physiologies were observed in both fermentations performed under those respective operating conditions, as demonstrated by nearly the same values of volumetric ($Q_p$) and specific ($q_p$) IA production rates, IA production yield ($Y_{p/s}$), and specific growth rate (${\mu}$). Specifically, the negligible difference of the specific growth rate (${\mu}$) between the two cultures (i.e., $0.029h^{-1}$ vs. $0.031h^{-1}$) was notable, considering the fact that ${\mu}$ normally has a significant influence on $q_p$ in the biosynthesis of secondary metabolites such as itaconic acid.

Study on a Small-scale Wastewater Treatment System using Biological Aerated Filter (생물학적 호기성필터를 이용한 소규모 하수처리시스템에 관한 연구)

  • Park, Chan G.;Jo, Eun Y.;Kim, Young H.;Park, Sung J.
    • The KSFM Journal of Fluid Machinery
    • /
    • v.17 no.3
    • /
    • pp.41-45
    • /
    • 2014
  • The biological aerated filter (BAF) reactor is regarded as an effective biological wastewater treatment method. It can remove pollutants by carrier filtration and biodegradation. Due to its advantages, which include high biomass retention, tolerance to toxicity, excellent removal efficiency, and slurry separation, BAF has been widely used to remove COD, $NH_4{^+}-N$, phosphorus, and other harmful organic substances. In this study, the BAF reactor was used to remove organic contaminants of domestic wastewater of Korea at both the benchand pilot-scale. The main objectives of this study are to: (i) investigate the removal efficiency of organic contaminants (ex. COD, nitrate, phosphorus) in BAF reactors at both scales; (ii) characterize the small-scale wastewater treatment plant using the BAF reactor. The concentration of COD in the influent increased from 69 to 246 mg/L. During the operation period, the final effluent concentration of COD remained maximum 4.0 mg/L, and the average removal efficiency was above 88%. The present study investigated the removal efficiencies of COD, TN, TP and $NH_4{^+}-N$ from smelting wastewater by BAF system. When treating wastewater in both bench and pilot-scale reactors, the BAF worked well.

A Study on the Elimination of Microcystis sp. using Microbubble (미세기포를 이용한 Microcystis sp. 제거에 관한 연구)

  • Hyung, Sung-Hee;Lee, Kap-Du;Park, Sang-Won
    • Journal of Environmental Science International
    • /
    • v.25 no.3
    • /
    • pp.425-438
    • /
    • 2016
  • This study carried out zeta potential measurements of the Microcystis sp. under various solutions condition and investigated the characteristics of Microcystis sp. through the size control of microbubbles to eliminate algae that causes problems in aquatic ecosystems and human activities. DAF process was adopted and several coagulants were used to remove the Microcystis sp. CCD Camera was used to measure and analyze the size of microbubble, and fluorescent microscope was used to observe the particle, algae species and community. Zeta potential behavior of the algae was analyzed by using ELS-Z. Lab-scale and pilot-scale experiments were conducted to test flotation process. Polyaluminium chloride(PAC) coagulant was used, and the removal efficiency of the algae was assessed through Chlorophyll-a analysis. In the Lab-scale experiment, 2.2 ppm, 11 ppm, 22 ppm, and 44 ppm of polyaluminium chloride was injected to coagulate the algae. The coagulated algae was floated by the microbubble. The microbubbles in the experiments were generated at a air pressure of 450 ~ 550 kPa. The microbubble size was controlled in $36{\mu}m$, $100{\mu}m$, and $200{\mu}m$, respectively by using different diffuser. The results of lab-scale experiments on flotation plant indicated that the average removal rate was about 90% or above for 11 ppm, 22 ppm, and 44 ppm of polyaluminium chloride. On the other hand, in the pilot-scale experiment, the removal efficiency was in the range of 85% to 95% in all dose ranges of polyalumium chloride and aluminium sulfate coagulants.

Performance Simulation of Part Load Operation for 2MWe Circulating Fluidized Bed Boiler (2MWe 순환유동상 보일러의 부분 부하 운전 성능 모사)

  • Kim, Taehyun;Choi, Sangmin;Hyun, Ju-soo
    • 한국연소학회:학술대회논문집
    • /
    • 2012.04a
    • /
    • pp.35-36
    • /
    • 2012
  • Part load operation usually covers large periods of the total operation time on the economic ground and electricity demand in small-scale boilers. Performance analysis of part load behavior is very important for the purpose of boiler operation optimization. A simple thermal calculation approach is applied to predict performance of a pilot-scale circulating fluidized bed (CFB) boiler at part load operation. Verification has been carried out by comparing between calculation results an operation data of the boiler.

  • PDF

Bipolar Membranes and Their Applications

  • Strathmann, H.
    • Membrane Journal
    • /
    • v.11 no.3
    • /
    • pp.97-108
    • /
    • 2001
  • Bipolar membranes have gained increasing interest as a tool for an efficient production of acids and bases from the corresponding salts. A large number of potential applications have been identified in the chemical and biochemical industry have been identified and evaluated on a laboratory scale. In spite of extensive research efforts and laboratory and pilot plat test, there are hardly any large-scale commercial plants. In this paper the basic concept of the electrodialytic water dissociation with bipolar membranes are briefly reviewed. The limitations of today\`s bipolar membranes are indicated. Selected examples of successful applications of the bipolar membrane technology are discussed.

  • PDF