• Title/Summary/Keyword: pilot plant

Search Result 713, Processing Time 0.028 seconds

A study on the BAC pilot plant in the Duk-san water works (덕산(德山) 정수장(淨水場)에서의 BAC Pilot plant에 관한 연구(硏究))

  • Lee, Sang-Bong;Kim, Dong-Youn;Lim, Jung-A;Lee, Won-Gwon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.9 no.2
    • /
    • pp.97-107
    • /
    • 1995
  • Today a conventional water treatment system has many problems. The ozone/GAC process, sometimes termed Biological Activated Carbon(BAC), appeared to be effective for the removal of soluble organic matters in the drinking water. The water quality of Nak-dong river in Pusan, generally shows BDOC 30-40% and NBDOC 60-70%. The pilot plant installed at the Duk-san water works that was been largest treatability(1,650,000ton/day) in Pusan. A experimental water in the pilot plant made use of the water after sand-filteration. Following results are drawn from this study. Initial adsorption velocity($DOC/DOC_o/T$) in the pure adsorption of GAG had a 0.0225, it's velocity changed to 0.006 after ozone added and the optimum ozone dose ranged of $1.4-2.0mgO_3/L$. A experimental water in the pilot plant composed with humic material(78%). Humic material composed with humic acid(20%) and fulvic acid(56%), and it's rate changed to 18 and 50% respectively after ozone added. DOC constantly decreased in the EBCTs and removal efficieny in the 15min of EBCT was 45-50%. It showed the largest removal rate of BDOC in the EBCT 5 and among the season, characteristics of removal varied. The HPC distributed over $10^6-10^7CFU/cm^3$ in the bed depth and among the season, distribution of HPC were differential.

  • PDF

The First Introduction of UPFC to the KEPCO Power Network in Korea : Pilot Plant (UPFC의 국내 계통 적용에 관한 연구 : Pilot Plant)

  • Yoo, H.H.;Kim, J.M.;Lee, H.S.;Lim, S.J.;Kim, S.Y.
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.307-311
    • /
    • 2002
  • 최근의 전력 공급 시장에서는 전력 공급의 유연성을 확보함과 동시에 고품질의 전력을 높은 신뢰성을 가지면서 수용가에 공급하는 송전기술에 대한 관심이 높아지고 있다. 이러한 시장의 요구에 부응하여 송전 시스템의 유효전력 및 무효전력을 능동적으로 제어할 수 있는 FACTS(Flexible AC Transmission System) 기기의 개념이 도입되었다 FACTS기술의 개념은 기존에 수동적으로 제어하였던 선로의 전압, 임피던스 및 위상각을 능동적으로 제어함으로써 전력공급의 유연성 및 신뢰성을 높이는 것이다 국내에서는 과거 일련의 project를 통하여 인버터형 FACTS 기기외 국내 적용을 위한 연구를 수행해 왔으며, 그 결과를 토대로 한전 전력연구원, (주)효성, 미국 Siemens사 및 국내 연구소와 협동연구의 형태로 한전의 154kV 계통에 적용되는 80MVA급 UPFC(Unified Power Flow Controller) pilot plant project를 진행하고 있다. 본 pilot plant project를 통하여 인버터형 FACTS 기기인 UPFC를 실제계통에 설치, 운영함으로써 향후 한국의 기간 계통인 345kV 송전 시스템에 적용할 시스템의 사양 및 운용전략을 도출할 계획이다. 본 논문에서는 국내 계통의 특징, pilot plant가 설치될 지역의 계통현황 및 기기의 사양을 소개하고 기기의 현장 설치 및 시험 진행 상황에 대하여 설명하였다.

  • PDF

A Pilot Plant Study of Industrial Wastewater Recycling Technology for Disc-Tube Membrane (DISC-TUBE MEMBRANE을 이용한 산업폐수 재활용 기술의 PILOT PLANT적 연구)

  • 김동일;한성욱;김호식;김인환
    • Journal of environmental and Sanitary engineering
    • /
    • v.12 no.3
    • /
    • pp.81-86
    • /
    • 1997
  • In case of Industrial Wastewater, It was various pollutions, high concentration and different physical, chemical properties each other in accordance with classification of wastewater. Therefore, after inquiring into the influence on the membrane of the dissolved pollutants, we should select the membrane of best efficient quality. As results of experiments on pilot plant test, optimum operating pressure for fouling removal was 34BAR, when continues operating was 34 BAR, recovery rate was 75% and permeate water flux was $32.9{\;}{\ell}/hr{\cdot}m^{2}$.

  • PDF

Gasification melting characteristics of Automobile shredder residue in 5t/d shaft pilot plant (5톤/일 shaft형 pilot plant에서 자동차 폐차 잔재의 가스화 용융 특성)

  • Roh, SeonAh;Kim, WooHyun;Yun, JinHan;Hong, ByeongKwon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.160-160
    • /
    • 2010
  • ELVs (End-of-Vehicles) in Korea incrasease continusely because of increase of used car. Automobile Shredder Residue (ASR) is final product of ELVs (End-of-Vehicles) after recycling. Automobile Shredder Residue are composed of light and heavy fluffs and soil/dust. In this study, 5 ton/day pilot plant of shaft type has been designed and constructed and 15 times of test run were performed. For the stable operation, operation conditions such as the amount of fed ASR and cokes, air flow and temperature in the gasification melting system have been changed and the composition of the produced gas such as $H_2$, CO and $CH_4$ and air pollution compound including dioxin discharged from the stack have been analyzed.

  • PDF

In-situ Measurements of Time-dependent Rock Deformations at the Waste Isolation Pilot Plant in USA (미국 Waste Isolation Pilot Plant에서의 시간변동 거동 계측)

  • Sangki Kwon;Chul-Hyung Kang;Jongwon Choi
    • Tunnel and Underground Space
    • /
    • v.9 no.3
    • /
    • pp.175-184
    • /
    • 1999
  • Systematic measurements in the field are the key component in the design process to ensure that optimal and safe designs result. The instruments installed at the Waste Isolation Pilot Plant, a underground nuclear waste repository in U.S., for measuring rock deformation was reviewed. Also discussions about installation and measurement for better understanding the complex time-dependent deformational behavior of underground excavation were made.

  • PDF

Comparative performance evaluation of two UF pilot plants at the Alto da Boa Vista WTP (São Paulo, Brazil)

  • Oliveira, T.F.;Mierzwa, J.C.
    • Membrane and Water Treatment
    • /
    • v.2 no.3
    • /
    • pp.175-185
    • /
    • 2011
  • Ultrafiltration is an emerging technology for drinking water treatment because it produces better water quality as compared with conventional treatment systems. More recently, the combination of UF technology with other processes in order to improve its performance has been observed. These associations aim to maximize the contaminants removal and reduce membrane fouling. The operational performance of contaminants removal and water production of two UF pilot plants was compared. The first plant (Guarapiranga) was fed with raw water and the second plant (ABV) with pre-treated water by the coagulation, flocculation and sedimentation processes at Alto da Boa Vista WTP (Sao Paulo, Brazil). Both units operated continuously for approximately 2,500 hours, from September/2009 to January/2010. The results showed that the ABV UF pilot plant was able to operate at higher specific fluxes (6.2 $L.d^{-1}.m^{-2}.kPa^{-1}$ @ $25^{\circ}C$) than Guarapiranga (3.1 $L.d^{-1}.m^{-2}.kPa^{-1}$ @ $25^{\circ}C$). However, the number of chemical cleanings conducted in both pilot units during the considered operation period was the same (4 chemical cleanings for each plant), which shows that the pre-treatment reduced the membrane fouling. The water quality at ABV for all the variables analyzed was better, but the feed water quality was also better due to pretreatment. The rejection values for the different contaminants were higher at Guarapiranga mainly because of a pollution load reduction after pre-treatment at ABV. Even with the better performance of the ABV UF pilot plant, it is necessary to take into consideration the complexity of the complete treatment system, and also the costs involved in the construction and operation of a full-scale treatment unit.

Protozoa as an Indicator of Activated In Sludge Plant Effluent Quality (원생동물을 이용한 하수처리장의 수질 예측)

  • 이찬형;문경숙
    • Microbiology and Biotechnology Letters
    • /
    • v.28 no.6
    • /
    • pp.361-366
    • /
    • 2000
  • Genera and number of protozoa were investigated in the conventional activated sludge pilot plant used for the treatment of municipal sewage and pre-treated night soil-containing sewage. In both case, the predominant protozoa was ciliates and among them Vorticella was the most common. In the pilot plant where pre-treated night soil was mixed with municipal sewage, genera of free-swimming ciliates, flagellates and amoeba was higher than in those withour night soil. Correlation analysis on the quality of effluent and protozoa indicates that municipal sewage has positive correlation with protozoa. However in the pilot plan 샐 sewage contatinin pre-treated night coil soil more samples show negative correlation. Followed equations were derived by the regression analysis of BOD in both the pilot plants. In case of pilot plant A of municipal sewage, the analysis B of munici-pal and pre-treated night soil-containing sewage, the analysis of BOD was $6.731$\times$10_{-2}$ $\times$Bodo+0.306(Adjusted $R^2$=0.864). At low temperature, number of protozoa was decreased to 35% and among therm, Aspidisca was the most common genus. Therefore, protozoa can be used as indicator of quality of the effluent in sewage treatment plants.

  • PDF

Optimal Design and Development of a Rice Mill Pilot Plant by Computer Simulation -Simulation of a Rice Mill Pilot Plant- (컴퓨터 시뮬레이션에 의한 미곡 도정공장의 적정설계 및 개발(I) -미곡 도정 시스템의 시뮬레이션-)

  • 정종훈;김보곤
    • Journal of Biosystems Engineering
    • /
    • v.20 no.1
    • /
    • pp.47-57
    • /
    • 1995
  • Rice Processing Complex(RPC) have being constructed with a rice mill plant and a facility of drying and storage to overcome problems caused by UR and to produce good quality of rice. An optimal design of a rice mill plant was required to successfully construct and operate it. The development of a simulation model was essential to the design of a rice mill plant. So, all the objectives of this study were to develop a simulation model for the design of a rice mill plant and to develop and evaluate the rice mill system. In this study the simulation model was developed to design a rice mill plant using SLAMSYSTEM, one of simulation languages. The results of this study were as followings. 1. A simulation model was developed with SLAMSYSTEM to represent the processes of a rice mill plant. The simulation model was used to design a rice mill pilot plant with the capacity of 0.5 ton per hour. The rice mill pilot plant was analyzed by the model with alternatives. 2. In the simulation the rice mill system was much influenced by the separating efficiency of a brown rice separator. Especially, the bottleneck of grain flow occurred at the buffer tank for brown rica. separator under 50% separating efficiency of brown rice separator. Hence, as the alternative simulation was conducted under 60% , 70% separating efficiency of brown rice separator, the bottleneck of the system could be minimized at the 60% separating efficiency of brown rice separator. 3. In the alternative simulation the bottleneck of the system was minimized under the hulling capacity of 1 t/h and 60% separating efficiency of brown rice separator with the capacity of 1 t/h. Under such a condition the max. weight of waiting entities at buffer tanks was less 250kg. So, the capacities of the buffer tanks were determined in the basis of simulation results. 4. The milled rice recovery and head rice recovery of the milling system were 74% and 92% in the simulation, respectively. These results of simulation almost corresponded to those of actual rice mill plants. The developed simulation model could be well applied to design a rice mill plant.

  • PDF