• Title/Summary/Keyword: pilot excavation

Search Result 26, Processing Time 0.021 seconds

A Study on the Excavation of Tunnel Portal Zone Located at High Steep Slope (급경사 지형에 위치하고 있는 갱구부의 굴착 방안 연구)

  • Kim, Woo-Sung;Lee, Sang-Eun
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.38-44
    • /
    • 2008
  • Recently, planning road construction in South Korea is focused on upgrading of the existing road by rerouting or restructuring. For this, roads under current construction in Korea go for more straight in its alignments and routing. Straight routing makes it all the more required to construct many mountain tunnels and bridges in Korea where mountains are so widely spread. Some portal of mountain tunnel is not rarely planed at high steep slope of mountain valley where it is not easy to secure working space for tunnel excavation. Reverse excavation is an alternative measure for excavation of tunnel portal at high steep slope. Construction in reverse excavation method has three important points requiring careful consideration: 1)planning of pilot tunnel in proper width, height, and length etc., 2)measure against the effect of one-side earth pressure to the direction of tunnel portal, 3)securing tunnel safety against shallow ground condition at portal zone. This paper intends to suggest applicable range of pilot tunnel for reverse excavation at the portal zone located at high steep slope, and shows result of study on the appropriateness of a reverse excavation by means of 3D numerical analysis. Result of 3D numerical analysis for reverse excavation at high steep slope shows that pilot tunneling will be applicable to start from the point $20{\sim}25m$ before the portal from inside the tunnel.

Pilot Test of Grid-Type Underground Space Considering Underground Complex Plant Operation (지하 복합플랜트 운영 중 확장을 고려한 격자형 지하공간 파일럿 테스트)

  • Chulho Lee
    • Tunnel and Underground Space
    • /
    • v.33 no.6
    • /
    • pp.472-482
    • /
    • 2023
  • The grid-type or room-and-pillar method is applied for the purpose of mining horizontally buried minerals. In this study, design and pilot test were performed to apply the room-and-pillar method which uses natural rock as a rock pillar to the construction of underground space. The area where the pilot test was conducted was in stone mine and had good rock conditions with an appropriate depth (about 30 m) to apply the pilot test. The pilot test site was selected by reviewing accessibility and ground conditions and then site construction was performed through detailed ground investigation and design. The pilot test was designed with a column shape of 8×8 m and a cross-section of 8×12 m. The blasting pattern was determined through test blasting at the site, and blasting of 3 m excavation with 89 holes was performed. Through field observations, the average width of 12.5 m and the average height of 8.3 m were measured. Therefore, it is possible to proceed similar to the cross-sectional shape considered in the design.

A Study on Behavior of 2-Arch Tunnel by Numerical Approach (수치해석적 접근을 통한 2Arch 터널의 거동양상 고찰)

  • 김상균;박동욱
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.225-232
    • /
    • 2003
  • The behaviour of ground induced by tunneling of 2arch tunnels may differ from the one caused by usual type tunnels. This paper describe the behaviour created by the size of pilot tunnel and the condition on the construction method of center piller Also, loads acting on the supports of the first tunnel and the center pillar during the excavation of second tunnel is investigated by numerical analyses. The results of numerical analyses are compared to the data records of measurement results, i.e. force on the support system and ground displacement.

  • PDF

In-situ Measurements of Time-dependent Rock Deformations at the Waste Isolation Pilot Plant in USA (미국 Waste Isolation Pilot Plant에서의 시간변동 거동 계측)

  • Sangki Kwon;Chul-Hyung Kang;Jongwon Choi
    • Tunnel and Underground Space
    • /
    • v.9 no.3
    • /
    • pp.175-184
    • /
    • 1999
  • Systematic measurements in the field are the key component in the design process to ensure that optimal and safe designs result. The instruments installed at the Waste Isolation Pilot Plant, a underground nuclear waste repository in U.S., for measuring rock deformation was reviewed. Also discussions about installation and measurement for better understanding the complex time-dependent deformational behavior of underground excavation were made.

  • PDF

A Study on the Hydraulic Simulation of Automatic Excavation System (자동굴삭시스템을 위한 굴삭기 유압부 시뮬레이션에 관한 연구)

  • Kwon, Soon-Kwang;Lee, Hong-Seon;Lee, Chang-Don;Yang, Soon-Young
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.32 no.11
    • /
    • pp.984-989
    • /
    • 2008
  • Hydraulic excavators have been one of the most popular devices in the various industries for construction, forestry and agriculture etc. Because the excavators generally work in poor environment, the various organizations study to automate those. In this paper, a hydraulic simulation for evaluation of automatical excavation system is presented. It is using the AMESim based on the 1.5 ton excavator with fixed displacement pumps, and operated by signals those control pilot pressure to spools of the main control valve. The main control valve is regarded that only consists of boom, arm and bucket. This simulation program is expected to apply to evaluation of the controller for automatic excavation system and to estimate of effect in accordance with change of some components or parameter.

Excavation Support Design and Stability Analysis of Shallow Tunnel in Heavily Fractured Rock Mass (연약 파쇄 지반내 터널의 굴착.보강 설계 및 안정성 분석)

  • Shin, Hee-Soon;Synn, Joong-Ho;Park, Chan;Han, Kong-Chang;Choi, Young-Hak;Choi, Yong-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.87-92
    • /
    • 2000
  • In excavation of tunnels especially located in shallow depth, it is not rare to meet geological change in excavation progress worse than expected in the initial design stage. This paper present a case study on the re-design of excavation and support system of a shallow tunnel under construction where it meets the unexpected bad geological condition during excavation. The detailed geological investigation shows that the rock mass is heavily weathered and fractured with RMR value less than 20. Considering this geological condition, the design concept is focused on the reinforcement of the ground preceding the excavation of tunnel. Two design patterns, LW-grouting & forepoling with pilot tunnelling method and the steel pipe reinforced grouting method, are suggested. Numerical analysis by FLAC shows that these two patterns give the tunnel and roof ground stable in excavation process while the original design causes severe failure zone around the tunnel and floor heaving. In point of the mechanical stability and the degree of construction, the steel pipe reinforced grouting technique proved to be good for the reinforcement of heavily fractured rock mass in tunnelling. This assessment and design process would be a guide in the construction of tunnels in heavily weathered and fractured rock mass situation.

  • PDF

A Field Case on the Pilot Constructions and Changes of a Braced Cut Wall in a Coastal Filled Land (해안매립지반에서의 토류가시설 시험시공 및 변경사례)

  • Hwang, Young-Chul;Kim, Ki-Rim;Kim, Yeon-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.46-55
    • /
    • 2006
  • There are many kinds of braced cut wall methods as the sheet pile, SCW, CIP and slurry wall which is adoptable for a deep excavation construction in a coastal filled land. The braced cut wall which has a strong stiffness is very stable but it has the weak point that the construction cost is high. Thus when a braced cut wall is designed, the geotechnical engineers choose the braced cut wall which has more safe and economic in the consideration of surrounding buildings near the construction site. Especially, when the sheet pile method as a braced cut wall is cheesed, the layer order and consistence of a coastal deposit stratum are considered and the pile driving method is also considered. This paper introduces the case that the originally box-type sheet pile wall was changed to U-type and high strength material after the pilot test at the subway construction site in a coastal filled land. This paper also introduces the case that the sheet pile's driving method was changed to special method in the section of the temporary coffer dam which had made when the present coastal filled land was formed.

  • PDF

Mechanical evolution law and deformation characteristics of preliminary lining about newly-built subway tunnel closely undercrossing the existing station: A case study

  • Huijian Zhang;Gongning Liu;Weixiong Liu;Shuai Zhang;Zekun Chen
    • Geomechanics and Engineering
    • /
    • v.35 no.5
    • /
    • pp.525-538
    • /
    • 2023
  • The development of a city is closely linked to the construction and operation of its subway system. However, constructing a new subway tunnel under an existing station is an extremely complex task, and the deformation characteristics and mechanical behavior of the new subway tunnel during the excavation process can greatly impact the normal operation of the existing station. Although the previous studies about the case of underpass engineering have been carried out, there is limited research on the condition of a newly-built subway tunnel that closely undercrossing an existing station with zero distance between them. Therefore, this study analyzes the deformation law and mechanical behavior characteristics of the preliminary lining of the underpass tunnel during the excavation process based on the real engineering case of Chengdu Metro Line 8. This study also makes an in-depth comparison of the influence of different excavation methods on this issue. Finally, the accuracy of numerical simulation is verified by comparing it with on-site result. The results indicate that the maximum bending moment mainly occurs at the floor slab of the preliminary lining, while that of the ceiling is small. The stress state at the ceiling position is less affected by the construction process of the pilot tunnel. Compared to the all-in-one excavation method, although the process of partial excavation method is more complicated, the deformation of preliminary lining caused by it is basically less than the upper limit value of the standard, while that of the all-in-one excavation method is beyond standard requirements.

Study on Ground Surface settlement of a 3-Arch-shaped Tunnel (3아치터널의 지표면 침하에 관한 연구)

  • Shin Kang Ho;Park Tu Sung;Park O Sung;Kim Jae Kwon
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1007-1013
    • /
    • 2004
  • A three-arch NATM tunnel with a total length of 53.5m has been constructed for a metropolitan subway station in Daejon, Korea. The tunnel, whose crown is located 22m below the ground, crosses the old Daejon station underneath. Since the tunnel comprises a very large section (10${\times}$28 m; largest in Korea), it shows complicated mechanical behaviors, especially near portal, due to its short length relative to width. As far as its construction step is concerned, the center tunnel is excavated with pre-excavated pilot tunnel, which is a unique feature of this tunnel (first in Korea) to secure safety during construction and prevent excessive settlements. The both side tunnels are then excavated along with the center tunnel. Since significant amount of settlement was predictable from the design stage, extensive monitoring was performed during construction. During excavation of the side tunnels, unexpected large settlements up to ${\~}$140mm (estimated 41.8 mm at design stage) was measured at the center tunnel. In this paper, we study the causes of this unusually large ground settlement. We believe that the extra-wide tunnel excavation increases the stress influence zone of portal in longitudinal direction and consequently add more settlements to the existing due to excavation and consolidation.

  • PDF

An Evaluation of EOCS Regarding Safety Management Effects on Buried Gas Pipelines and Convenience of the Excavators and the Operators of Gas Companies

  • Ryon, Young-Don;Chae, Chung-Keun;Bang, Hyo-Jung;Yoon, Young-Kee;Lee, Su-Kyung
    • International Journal of Safety
    • /
    • v.6 no.2
    • /
    • pp.43-48
    • /
    • 2007
  • We introduced the Excavation One Call System (EOCS) as a pilot system, in Seoul, Korea. The system utilizes the phone and internet to transfer information about digging underground and buried gas pipelines, although currently written forms are used in accordance with the City Gas Business Law. After one year, we evaluated the business model by surveying the excavators and the operators of the gas companies. This paper shows that the EOCS was more effective in preventing the buried gas pipelines from being damaged than the existing method that has to use due form. It also shows that the EOCS was more convenient and cost efficient than the present policies in place. We come to the conclusion that the EOCS should be extended nationwide and gradually include other subsurface facilities.