• Title/Summary/Keyword: phasd-change

Search Result 2, Processing Time 0.016 seconds

Electrolyte Mechanizm Study of Amorphous Ge-Se Materials for Memory Application (Ge-Se의 스위칭 특성 향상을 위한 Sb-doping에 관한 연구)

  • Nam, Ki-Hyun;Chung, Hong-Bay
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.06a
    • /
    • pp.69-69
    • /
    • 2009
  • In other to progress better crystallization transition and long phase-transformation data of phase-change memory (PRAM), we investigated about the effect of Sb doping and Ag ions percolating into Ge-Se-Te phase-change material. Doped Sb concentrations was determined each of 10 wt%, 20 wt% and 30 wt%. As the Sb-doping concentration was increased, the resistivity decreased and the crystallization temperature increased. Ionization of Ag was progressed by DPSS laser (532 nm) for 1 hour. The resistivity was more decreased and the crystallization temperature was more increased in case of adding Ag layer under Sh-(Ge-Se-Te) thin film. At the every condition of thin films included Ag layer more stable states were indicated compare with just Sh-doped Ge-Se-Te thin films.

  • PDF

The Dessing and Implementation of the SPR/SCR Management System for Reliability Data Collection and Analysis (신뢰성 데이터 수집 및 분석을 위한 SPR/SCR 관리 시스템의 설계 및 구현)

  • Lee, Chang-Hui;Han, Pan-Am
    • The Transactions of the Korea Information Processing Society
    • /
    • v.4 no.2
    • /
    • pp.409-429
    • /
    • 1997
  • Problems encountered during software development or pteration nay result from defects in the software,ghrdware,or their oterations.Because of their diversity,the determination of the sources of a problem and its corrective adtion requires a centrally controlled system for monitoring provlems and detemining systematiccauses. In the paper,the SPR/SCR management system was developed and applied for the collection and analysis of the error data,process data and product data delected by each phasd in SDLC.There are four objectibes in the SPR/SCR management system.The first is to assure that software errors are documented,corrected,and vot forgottem. The second is to assure that SPR.are assessed for their validity.The third is to provide feedback on SPR status to the developer and the user.The fourth is ot prvide data for measuring and prediciting sofware quality and reliability.These goals could be satisfied by the application of the SPR/SCR mangement system.Also,the accomplishment rate of software reliability,criterion of test completion,estimation of release time, efficient development and management can be reflected by applying the SPR/SCR management system.

  • PDF