  • The cautious blasting works had been used with emulsion explosion electric M/S delay caps. Drill depth was from 3m to 6m with Crawler Drill ${\phi}70mm$ on the calcalious sand stone (soft -modelate -semi hard Rock). The total numbers of test blast were 88. Scale distance were induced 15.52-60.32. It was applied to propagation Law in blasting vibration as follows. Propagtion Law in Blasting Vibration $V=K(\frac{D}{W^b})^n$ were V : Peak partical velocity(cm/sec) D : Distance between explosion and recording sites(m) W : Maximum charge per delay-period of eight milliseconds or more (kg) K : Ground transmission constant, empirically determind on the Rocks, Explosive and drilling pattern ets. b : Charge exponents n : Reduced exponents where the quantity $\frac{D}{W^b}$ is known as the scale distance. Above equation is worked by the U.S Bureau of Mines to determine peak particle velocity. The propagation Law can be catagorized in three groups. Cubic root Scaling charge per delay Square root Scaling of charge per delay Site-specific Scaling of charge Per delay Plots of peak particle velocity versus distoance were made on log-log coordinates. The data are grouped by test and P.P.V. The linear grouping of the data permits their representation by an equation of the form ; $V=K(\frac{D}{W^{\frac{1}{3}})^{-n}$ The value of K(41 or 124) and n(1.41 or 1.66) were determined for each set of data by the method of least squores. Statistical tests showed that a common slope, n, could be used for all data of a given components. Charge and reduction exponents carried out by multiple regressional analysis. It's divided into under loom over loom distance because the frequency is verified by the distance from blast site. Empirical equation of cautious blasting vibration is as follows. Over 30m ------- under l00m ${\cdots\cdots\cdots}{\;}41(D/sqrt[2]{W})^{-1.41}{\;}{\cdots\cdots\cdots\cdots\cdots}{\;}A$ Over 100m ${\cdots\cdots\cdots\cdots\cdots}{\;}121(D/sqrt[3]{W})^{-1.66}{\;}{\cdots\cdots\cdots\cdots\cdots}{\;}B$ where ; V is peak particle velocity In cm / sec D is distance in m and W, maximLlm charge weight per day in kg K value on the above equation has to be more specified for further understaring about the effect of explosives, Rock strength. And Drilling pattern on the vibration levels, it is necessary to carry out more tests.

  • PDF

Reproductive Ecology of Gobiobotia brevibarba (Cyprinidae) (돌상어 Gobiobotia brevibarba (Cyprinidae)의 산란 생태)

  • Choi, Jae-Suk;Byeon, Hwa-Kun;Kwon, Oh-Kil
    • Korean Journal of Ichthyology
    • /
    • v.13 no.2
    • /
    • pp.123-128
    • /
    • 2001
  • The reproductive ecology of Gobiobotia brevibarba was investigated at Hongchen River of Bangokri, Seomyon, Hongcheongun, Kangwondo, from March 1999 to February 2000. The favorite habitat was a stretch of river with fast flow and a stream bed mostly covered with cobbles and pebbles. The spawning ground was a riffle area 20~50 cm deep, with a current velocity of 0.6~1.3 m/sec, and a bottom consisting of cobble and boulder. The sex ratio of female to male was 1 : 0.86. Peak spawning season was May when water temperatures rose to $18{\sim}20^{\circ}C$. Male and females became sexually mature when they attained more than 40 mm and 50 mm in body length, respectively. The average number of eggs in the ovary was $2,040{\pm}400.57$ and the egg diameter was $1.98{\pm}0.06\;mm$. The matured eggs were demersal, spherical, and dimmed light yellow in color.

  • PDF

Maximum Height and Velocity of Jumping Car in The Air (공중으로 점프한 차량의 최대 높이 및 속도)

  • Shin, Seong-Yoon;Lee, Hyun-Chang
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.10
    • /
    • pp.55-60
    • /
    • 2012
  • An free-fall object is received only force of gravity. Movement that only accept gravity is free-fall movement, and a free-falling object is free falling body. In other words, free falling body is only freely falling objects under the influence of gravity, regardless of the initial state of objects movement. In this paper, we assume, ignoring the resistance of the air, and the free-fall acceleration by the height does not change within the range of the short distance in the vertical direction. Under these assumptions, we can know about time and maximum height to reach the peak point from jumping vertically upward direction, time and speed of the car return to the starting position, and time and speed when the car fall to the ground. It can be measured by jumping degree and risk of accident from car or motorcycle in telematics.

Numerical Analysis of Concrete Lining and Rockbolt Behavior of the Tunnel Associated with Blast-induced Vibration (발파진동으로 인한 터널 콘크리트 라이닝과 록볼트 거동의 수치해석적 분석)

  • Jeon, Sang-Soo;Jang, Yang-Won
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.5
    • /
    • pp.69-78
    • /
    • 2009
  • Since the blast vibration induced by explosives of the powder possibly provide damage of the nearby structures adjacent to the tunnel, the stability of the nearby structures should be estimated. In this study, the stability of the tunnel based on the allowable peak particle velocity of the structures as well as allowable stress of the structures presented in the concrete structural design standard was estimated with respect to the stress of the concrete lining and axial force of the rockbolt during the blasting operation at the ground surface of the pre-existing tunnel. The analyses were carried out by using $FLAC^{2D}$ which is one of the programs developed based on the finite difference method. The bending compressive stress and shear stress of the concrete lining and axial force of the rockbolt were rapidly increased when the blasting operation was conducted near the tunnel.

Reduction Factor for the Site Coefficient of a Building built on a Poor-backfilled Embedded Foundation (뒷채움이 부실한 묻힌기초 위에 세워진 건축물의 지반증폭계수에 대한 저감계수)

  • Kim, Yong-Seok
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.16 no.1
    • /
    • pp.1-12
    • /
    • 2012
  • In this paper, the reduction factors to calculate the site coefficients of an embedded foundation are estimated, considering the effect of a poor backfill for the seismic design of a building built on an embedded foundation. This is determined by utilizing in-house finite element software, P3DASS, which has the capability of horizontal pseudo 3D seismic analysis with nonlinear soil. The 30m thick soil on stiff rock was assumed to be homogeneous, elastic, viscous and isotropic, and equivalent circular rigid foundations with radii of 10-70m were assumed to be embedded 0, 10, 20, and 30 m in the soil. Seismic analyses were performed with 7 bedrock earthquake records de-convoluted from the outcrop records; the scaling of the peak ground accelerations were to 0.1 g. The study results show that the site coefficients of a poor-backfilled foundation are gradually reduced as the foundation embedment ratio increases, except in the case of a small foundation embedded deeply in the weak soft soil. In addition, it was found that the deviation of the site coefficients due to the foundation size was not significant. Therefore, the typical reduction factors of an embedded foundation with poor backfill are proposed in terms of the shear wave velocity and site class. This is in order to find the site coefficients of an embedded foundation by multiplying the reduction factor by a site coefficient of a surface foundation specified in the design code. They can then be interpolated to determine the intermediate shear wave velocity.

Earthquake-induced Liquefaction Areas and Safety Assessment of Facilities (지진으로 인한 액상화 지역 및 시설물 안정성 평가)

  • Jeon, Sang-Soo;Heo, DaeYang;Lee, Sang-Seung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.7
    • /
    • pp.133-143
    • /
    • 2018
  • Liquefaction is one of secondary damages after earthquake and has been rarely reported until earthquake except Mw = 5.4 15 November 2017 Pohang earthquake in Korea. In recent years, Mw = 5.8 12 September 2016 Gyeongju earthquake and Mw = 5.4 15 November 2017 Pohang earthquake, which induced liquefaction, occurred in fault zone of Yangsan City located at south-eastern part of Korea. This explains that Korea is not safe against liquefaction induced by earthquake. In this study, the distance between the centroid of administrative district and the epicenter located at Yangsan fault, peak ground velocity (PGA) induced by both Mw = 5.0 and 6.5, and liquefaction potential index (LPI), which is calculated by using groundwater level and standard penetration test results of 274 in the area of Gimhae city located in adjacent to Nakdong river and across Yangsan fault, have been estimated and then kriging method using geographical information systems has been used to evaluate liquefaction effects on the damage of facilities. This study presents that Mw = 5.0 earthquake induces a small and low level of liquefaction resulting in slight damage of facilities but Mw = 6.5 earthquake induces a large and high level of liquefaction resulting in severe damage of facilities.

Progressive Evaluation of Concrete Deterioration Caused by Chloride-Induced Steel Corrosion Using Impact-Echo Testing (충격 반향 신호 모니터링을 통한 철근 부식 진전에 따른 콘크리트 상태 평가)

  • Rizky Pitajeng;Julfikhsan Ahmad Mukhti;Seong-Hoon Kee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.3
    • /
    • pp.37-46
    • /
    • 2024
  • This study investigates the evolution of concrete damage due to chloride-induced steel corrosion through Impact-echo (IE) testing. Three reinforced concrete specimens, each measuring 1500 mm in length, 400 mm in width, and 200 mm in thickness, were fabricated using three concrete mixture proportions of blended cement types: ordinary Portland cement, ground granulated blast-furnace slag and fly ash. Steel corrosion in the concrete was accelerated by impressing a 0.5 A current following a 35-day cycle of wet-and-dry saturation in a 3% NaCl solution. Initial IE data collected during the saturation phase showed no significant changes, indicating that moisture had a minimal impact on IE signals and highlighting the slow progress of corrosion under natural conditions. Post-application of current, however, there was a noticeable decline in both IE peak frequency and the P-wave velocity in the concrete as the duration of the impressed current increased. Remarkably, progressive monitoring of IE proves highly effective in capturing the critical features of steel-corrosion induced concrete deterioration, such as the onset of internal damages and the rate of damage propagation. These results demonstrate the potential of progressive IE data monitoring to enhance the reliability of diagnosing and prognosticating the evolution of concrete damage in marine environment.