• 제목/요약/키워드: parallel machines

검색결과 208건 처리시간 0.022초

A Tabu Search Methods for Minimizing Mean Tardiness In Parallel Machines Scheduling

  • Chun Tai-Woong;Park Hai-Chun
    • 산업경영시스템학회지
    • /
    • 제23권60호
    • /
    • pp.67-72
    • /
    • 2000
  • In this paper we consider to parallel machines scheduling problems for minimizing mean tardiness that is known NP-complete. This problems is classified into two cases, one of which is the case which processing time are identical and the other, nonidentical. A Tabu Search method is applied to the problems considered in this paper to get an improved solution. To this end, we design move attribute, Tabu attribute and Tabu tenure, and thereafter perform the experiments to the problems.

  • PDF

PC level 병렬 구조해석법 개발을 위한 PCG 알고리즘 (PCG Algorithms for Development of PC level Parallel Structural Analysis Method)

  • 박효선;박성무;권윤한
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1998년도 가을 학술발표회 논문집
    • /
    • pp.362-369
    • /
    • 1998
  • The computational environment in which engineers perform their designs has been rapidly evolved from coarse serial machines to massively parallel machines. Although the recent development of high-performance computers are available for a number of years, only limited successful applications of the new computational environments in computational structural engineering field has been reported due to its limited availability and large cost associated with high-performance computing. As a new computational model for high-performance engineering computing without cost and availability problems, parallel structural analysis models for large scale structures on a network of personal computers (PCs) are presented in this paper. In structural analysis solving routine for the linear system of equations is the most time consuming part. Thus, the focus is on the development of efficient preconditioned conjugate gradient (PCG) solvers on the proposed computational model. Two parallel PCG solvers, PPCG-I and PPCG-II, are developed and applied to analysis of large scale space truss structures.

  • PDF

병렬기계로 구성된 인쇄회로기판 제조공정에서의 스케쥴링에 관한 연구 (Unrelated Parallel Machine Scheduling for PCB Manufacturing)

  • 김대철
    • 산업경영시스템학회지
    • /
    • 제27권4호
    • /
    • pp.141-146
    • /
    • 2004
  • This research considers the problem of scheduling jobs on unrelated parallel machines with a common due date. The objective is to minimize the total absolute deviation of job completion times about the common due date. This problem is motivated by the fact that a certain phase of printed circuit board manufacturing and other production systems is bottleneck and the processing speeds of parallel machines in this phase are different for each job. A zero-one integer programming formulation is presented and two dominance properties are proved. By these dominance properties, it is shown that the problem is reduced to asymmetric assignment problem and is solvable in polynomial time.

여러 종류의 작업 처리가 가능한 기계 시스템에 대한 LPT 스케줄링 (LPT Scheduling for Multipurpose Machines)

  • 황학진
    • 산업공학
    • /
    • 제16권spc호
    • /
    • pp.132-137
    • /
    • 2003
  • We consider scheduling jobs on multipurpose machines where jobs can be processed by a subset of the machines operated in parallel with the objective of minimizing makespan. We apply LPT(Longest Processing Time first) algorithm and prove that its posterior worst-case performance ratio is at most $log_24m/(1+{\lambda})$, where \lambda is the number of machines eligible for processing the job with the latest completion time. In general, LPT is shown to always find a schedule with makespan at most $log_24m/3$ times optimum.

다단계 병렬 흐름생산시스템에서 이송크기가 2이상인 경우의 제품별 로트 투입순서 결정 (Transfer Batch Scheduling for a Flexible Flowshop with Identical Parallel Machines at Each Stage)

  • 김중순
    • 한국경영과학회지
    • /
    • 제25권2호
    • /
    • pp.33-46
    • /
    • 2000
  • The problem of scheduling n independent jobs on serial stages with identical parallel machines at each stage is considered. Each job lot is allocated evenly to all machines at each stage for processing and moved in transfer batches between states., This scheduling strategy is called an identical production pattern. The objective is to find a permutation schedule that minimizes makespan. A branch and bound algorithm is suggested to find an optimal permutation schedule for a transformed problem A number examples is presented to illustrate the branch and bound algorithm, Computational results for 640 problems generated randomly show that within a resonable time the suggested algorithm can be used for transfer batch scheduling in a flexible flowshop.

  • PDF

재작업이 존재하는 이종병렬기계에서 생산효율을 위해 공정소요시간 단축을 목적으로 하는 작업할당 (Dispatching to Minimize Flow Time for Production Efficiency in Non-Identical Parallel Machines Environment with Rework)

  • 서정하;고효헌;김성식;백준걸
    • 대한산업공학회지
    • /
    • 제37권4호
    • /
    • pp.367-381
    • /
    • 2011
  • Reducing waste for the efficiency of production is becoming more important because of the rapidly changing market circumstances and the rising material and oil prices. The dispatching also has to consider the characteristic of production circumstance for the efficiency. The production circumstance has the non-identical parallel machines with rework rate since machines have different capabilities and deterioration levels in the real manufacturing field. This paper proposes a dispatching method, FTLR (Flow Time Loss Index with Rework Rate) for production efficiency. The goal of FTLR is to minimize flow time based on such production environments. FTLR predicts the flow time with rework rate. After assessing dominant position of expected flow time per each machine, FTLR performs dispatching to minimize flow time. Experiments compare various dispatch methods for evaluating FTLR with mean flow time, mean tardiness and max tardiness in queue.

오디세우스 대용량 검색 엔진을 위한 병렬 웹 크롤러의 구현 (Implementation of a Parallel Web Crawler for the Odysseus Large-Scale Search Engine)

  • 신은정;김이른;허준석;황규영
    • 한국정보과학회논문지:컴퓨팅의 실제 및 레터
    • /
    • 제14권6호
    • /
    • pp.567-581
    • /
    • 2008
  • 웹의 크기가 폭발적으로 증가함에 따라 인터넷에서 정보를 얻는 수단으로서 검색 엔진의 중요성이 부각되고 있다. 검색 엔진은 사용자에게 최신의 정보를 검색 결과로서 제공하기 위해 웹 페이지를 주기적으로 수집하고 이를 데이타베이스에 저장한다. 웹 크롤러는 이러한 목적으로 웹 페이지를 수집하는 프로그램이다. 대부분의 검색 엔진은 제한된 시간 내에 많은 수의 웹 페이지를 수집하기 위해 다수의 머신을 사용하는 병렬 웹 크롤러를 이용한다. 그러나, 병렬 웹 크롤러의 아키텍처와 세부 구현 방법이 잘 알려져 있지 않기 때문에 실제로 병렬 웹 크롤러를 구현하는 데에 어려움이 많다. 본 논문에서는 병렬 웹 크롤러(parallel web crawler)의 아키텍처와 세부 구현 방법을 제시한다. 병렬 웹 크롤러는 다수의 머신에서 웹 페이지를 병렬적으로 수집하기 위해 조정자(coordinator) 대리자(agent) 구조의 2-티어(tier) 모델을 사용한다. 조정자/대리자 모델은 각 머신에서 웹 페이지를 수집하기 위한 다수의 대리자들과 이 대리자들을 관리하기 위한 하나의 조정자로 구성된다. 병렬 웹 크롤러는 웹 페이지를 수집하기 위한 크롤링(crawling) 모듈, 수집한 웹 페이지를 데이타베이스 로딩 포맷으로 변환하기 위한 컨버팅(converting) 모듈, 수집된 웹 페이지의 중요도를 계산하기 위한 랭킹(ranking) 모듈로 구성된다. 본 논문에서는 병렬 웹 크롤러의 각 모듈들을 설명하고, 세부 구현 방법을 설명한다. 마지막으로, 실험을 통해 병렬 웹 크롤러의 성능을 평가하였다. 실험 결과, 제안된 병렬, 웹 크롤러가 수집해야할 웹 페이지 개수와 머신 개수에 따라 확장 가능함을 보였다.

System Construction Method of Parallel Operation System constructed with Three Electric Power Converters

  • Ishikura, Keisuke;Inaba, Hiromi;Kishine, Keiji;Nakai, Mitsuki;Ito, Takuma
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • 제3권4호
    • /
    • pp.451-457
    • /
    • 2014
  • Parallel operation systems have an advantage in that they can be constructed quickly and inexpensively by combining existing electric power converters. However, in this case, there is a peculiar problem in that a cross current flows between the electric power converters. To design a control system more simply and commonalize the core of combination reactors, we reviewed a system construction method for parallel operation systems constructed with three electric power converters.

다단계 작업장에서의 가공경로 선정과 투입량 결정 (Machining Route Selection and Determination of Input Quantity on Multi-Stage Flexible Flow Systems)

  • 이규용;서준용;문치웅
    • 산업경영시스템학회지
    • /
    • 제27권1호
    • /
    • pp.64-73
    • /
    • 2004
  • This paper addresses a problem of machining determination of input quantity in a multi-stage flexible flow system with non-identical parallel machines considers a subcontracting, machining restraint, and machine yield. We develop a nonlinear programing with the objective of minimizing the sum of in-house processing cost and subcontracting cost. To solve this model, we introduce a single-processor parallel genetic algorithm(SPGA) to improve a weak point for the declined robustness of simple algorithm(SGA). The efficiency of the SPGA is examined in comparison with the SGA for the same problem. In of examination the SPGA is to provide the excellent solution than the solution of the SGA.

공간제약을 갖는 선박용 엔진 조립공장의 효율적인 일정계획을 위한 발견적 기법 (A Heuristic for Efficient Scheduling of Ship Engine Assembly Shop with Space Limit)

  • 이동현;이경근;김재균;박창권;장길상
    • 산업공학
    • /
    • 제12권4호
    • /
    • pp.617-624
    • /
    • 1999
  • In order to maximize an availability of machine and utilization of space, the parallel machines scheduling problem with space limit is frequently discussed in the industrial field. In this paper, we consider a scheduling problem for assembly machine in ship engine assembly shop. This paper considers the parallel machine scheduling problem in which n jobs having different release times, due dates and space limits are to be scheduled on m parallel machines. The objective function is to minimize the sum of earliness and tardiness. To solve this problem, a heuristic is developed. The proposed heuristic is divided into three modules hierarchically: job selection, machine selection and job sequencing, solution improvement. To illustrate its effectiveness, a proposed heuristic is evaluated with a large number of randomly generated test problems based on the field situation. Through the computational experiment, we determine the job selection rule that is suitable to the problem situation considered in this paper and show the effectiveness of our heuristic.

  • PDF