• Title/Summary/Keyword: overall cost method

Search Result 369, Processing Time 0.03 seconds

A Study on the Optimum Operating Cost of Driveless LRT System (무인운전 경량전철의 최적 운영비 산출에 대한 연구)

  • Chung, Su-Young;Lee, Jong-Seong;Cho, Jin-Hwan;Ahn, Young-Hwan;Baek, Seung-Heon
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2051-2057
    • /
    • 2008
  • This paper is a feasibility study on the calculation of operating cost in regards to the overall operation following the completion of a number of LRT lines currently in progress. Owing to the absence of operating experience in driveless LRT system at home, the difficulties lie in the assumption of the optimal operating budget applying domestic real situation. Nevertheless, with 34 years of accumulated operating experience in heavy rail transit system, Seoul Metro, the nation's biggest urban rail transit operator, performs O&M consultancy services for several on-going projects along with every effort to acquire know-how where the appropriateness of the cost estimation as a required deliverable is reviewed and a more efficient way is provided. The main focus of this study is to seek a method to calculate the optimal amount of operating expenses as well as a cost-effective alternative for possible weaknesses from the standpoint of the operator. The body of this paper discusses the five issues such as personnel cost, overhead, maintenance cost, additional purchase price, alternative investment fee from a more macroscopic point of view, and the conclusion deals with the adequacy of the reason for selection of institutions with various operating know-how.

  • PDF

Optimization of Maintenance and Retrofit Planning for Reliable Seismic Performance of the Bridges (교량의 내진성능확보를 위한 유지보수계획의 최적화)

  • 고현무;박관순;김동석;이선영
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2002.03a
    • /
    • pp.284-293
    • /
    • 2002
  • Using the life cycle cost concept, optimum maintenance and retrofit planning for reliable seismic performance is suggested the overall life cycle cost to be minimized including the initial cost, the costs of inspection, repair, and failure. Limit states of the bridges are defined. And failure probabilities are computed through crossing theory. The effect of maintenance and retrofit is represented using the probability of damage detection and event tree analysis. Optimization of maintenance and retrofit planning method proposed from this research was applied to numerical examples. The analysis incorporates the acceleration and site conditions prescribed in the code, and the quality of inspection methods.

  • PDF

The Study on Program for Happy House Sanjeon District Center in Jung-gu, Ulsan City (해피하우스지역센터 프로그램에 관한 연구)

  • Kim, Sun-Joong
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2011.04a
    • /
    • pp.161-166
    • /
    • 2011
  • This research was conducted in order to suggestion management program of Happy house center which facility of detached housings, multi family housing, and semi-detached housing management. This study's purpose is to systematically help create a district customized co-management housing management system among detached housing area by reflecting resident opinion and simultaneously provide basic research. The area of research is Sanjoen district in Ulsan city that compact old detached houses. The research study's results are follows: First, the overall survey results showed that most respondents demanded program of happy house center for housing energy deduction method and support of house insulation cost and heating fuel cost. Second, happy house center try to order of priority or housing maintenance and seek of cost deduction plan. Third, happy house center propose the Maeulmandeulgi(Machizkuri) program or housing management plan for residents' talent contribution.

  • PDF

Evaluation of Building Construction Management in Sylhet City, Bangladesh

  • Anamul, Hasan Md.
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.40-47
    • /
    • 2012
  • Construction management is essential for a achieving any pre-determined objective. It is however seen that in spite of construction management, majority of the project do not keep up their original time schedule and their completion cost is also higher as compared with the estimated cost The main reason for overrun in time and cost is that the planning at the outset of the project was not adequate or method of planning was not a refined one. In this research work, I showed the overall conditions of construction work and management in Sylhet city of Bangladesh and found many drawbacks in the construction management after completing my research. I found several factors affecting proper construction management and I have provided brief results. I have also provided some recommendations after my research work.

Economic Evaluation of Various Cooling Systems (냉방기기별 경제성 평가)

  • Kim, Young-Il;Cho, Keum-Nam
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.214-219
    • /
    • 2008
  • In this study, medium capacity EHP and GHP for air-conditioning a building with a floor area of $1,200\;m^2$ are compared economically. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. For the initial cost, equipment, construction, installation, electric facility, financial subsidy and tax cut are considered. Basic electricity, energy(electricity and gas), space charge, labor, insurance and repair are considered for the operation cost. Under the assumptions made in this study, overall cost of EHP is less than that of GHP. However, different outcome may result if different assumptions are made. This study is useful for performing an economic evaluation of various air-conditioning systems.

  • PDF

Optimal design of reinforced concrete beams: A review

  • Rahmanian, Ima;Lucet, Yves;Tesfamariam, Solomon
    • Computers and Concrete
    • /
    • v.13 no.4
    • /
    • pp.457-482
    • /
    • 2014
  • This paper summarizes available literature on the optimization of reinforced concrete (RC) beams. The objective of optimization (e.g. minimum cost or weight), the design variables and the constraints considered by different studies vary widely and therefore, different optimization methods have been employed to provide the optimal design of RC beams, whether as isolated structural components or as part of a structural frame. The review of literature suggests that nonlinear deterministic approaches can be efficiently employed to provide optimal design of RC beams, given the small number of variables. This paper also presents spreadsheet implementation of cost optimization of RC beams in the familiar MS Excel environment to illustrate the efficiency of the exhaustive enumeration method for such small discrete search spaces and to promote its use by engineers and researchers. Furthermore, a sensitivity analysis is performed on the contribution of various design parameters to the variability of the overall cost of RC beams.

Allocation of Transmission Loss for Determination of Locational Spot pricing

  • You, Chang-Seok;Min, Kyung-Il;Lee, Jong-Gi;Moon, Young-Hyun
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.2
    • /
    • pp.194-200
    • /
    • 2007
  • The deregulation problem has recently attracted attentions in a competitive electric power market, where the cost must be earmarked fairly and precisely for the customers and the Independent Power Producers (IPPs) as well. Transmission loss is an one of several important factors that determines power transmission cost. Because the cost caused by transmission losses is about $3{\sim}5%$, it is important to allocate transmission losses into each bus in a power system. This paper presents the new algorithm to allocate transmission losses based on an integration method using the loss sensitivity. It provides the buswise incremental transmission losses through the calculation of load ratios considering the transaction strategy of an overall system. The performance of the proposed algorithm is evaluated by the case studies carried out on the WSCC 9-bus and IEEE 14-bus systems.

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.12 no.1
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

Integration of Multiple Segmentation Methods based on Evaluation Functions for Segmentation of Visible Human Color Images (평가함수에 의해 혼합된 다수의 분할 방법을 적용한 Visible Human컬러 영상의 분할)

  • 김한영;김동성;강흥식
    • Journal of KIISE:Software and Applications
    • /
    • v.30 no.3_4
    • /
    • pp.308-315
    • /
    • 2003
  • This paper proposes an approach integrating multiple segmentation methods in a systematic way, which can improve overall accuracy without deteriorating accuracy of highly confident segments of boundaries generated by constituent methods. A segmentation method produces boundary segments, which are then evaluated with an evaluation function considering pros/cons of the current and next methods to apply. Boundary segments with low confidence are replaced by a next method while the other segments are kept. These steps are repeated until all segmentation methods are applied. The proposed approach is implemented for the segmentation of muscles in the Visible Human color images. A Balloon method, a minimum cost path finding method, and a Seeded Region Growing method are integrated. The final segmentation results showed improvements in both overall evaluation and segment-based evaluation.