An efficiency improving method for Uninterruptible Power Supply System(UPS) was developed by using OP-AMP based application circuits such as voltage detection device, current detection device and static switch control device. The efficiency improving algorithm was made by mixing the operating concepts of On-Line type UPS with the operating concepts of Off-Line type UPS. The UPS' inverter does not work if the UPS' output load current is not higher than the low load operating current which is about 0-30(%) of the UPS' output load capacity. The low load operating current is adjustable within the half of the UPS' output load capacity. If the UPS' output load current is rising over than the low load operating current, the UPS' inverter starts working and the inverter output power feeds to the loads of UPS. If UPS' input power breaks out while UPS' inverter does not operate because the load current is low, the inverter starts working within 4(ms) with excessive output voltage which is ${\pm}$8(%) of normal UPS' output voltage. Like these. UPS can continuously feeds power to it's load device and reduce power consumptions.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.1
/
pp.18-22
/
2009
Short-term load forecasting (STLF) is an important task in power system planning and operation. Its accuracy affects the reliability and economic operation of power systems. STLF is to be classified into load forecasting for weekdays, weekends, and holidays. Due to the limited historical data available, it is more difficult to accurately forecast load for holidays than to forecast load for weekdays and weekends. It has been recognized that the forecasting errors for holidays are large compared with those for weekdays in Korea. This paper presents a polynomial regression with data mining technique to forecast load for holidays. In statistics, a polynomial is widely used in situations where the response is curvilinear, because even complex nonlinear relationships can be adequately modeled by polynomials over a reasonably small range of the dependent variables. In the paper, the coefficient of determination is proposed as a selection criterion for screening weekday data used in holiday load forecasting. A numerical example is presented to validate the effectiveness of the proposed holiday load forecasting method.
Effective link quality estimation is a vital issue for reliable routing in wireless networks. This paper studies the performance of expected transmission count (ETX) under different traffic loads. Although ETX shows good performance under light load, its performance gets significantly worse when the traffic load is high. A broadcast packet storm due to new route discoveries severely affects the link ETX values under high traffic load, which makes it difficult to find a good path. This paper presents the design and implementation of a variation of ETX called high load - ETX (HETX), which reduces the impact of route request broadcast packets to link metric values under high load. We also propose a reliable routing protocol using link quality metrics, which is called link quality distance vector (LQDV). We conducted the evaluation of the performance of three metrics - HETX, ETX and minimum hop-count. The simulation results show that HETX improves the average route throughput by up to 25% over ETX under high traffic load. Minimum hop-count has poor performance compared with both HETX and ETX at all of the different traffic loads. Under light load, HETX and ETX show the same performance.
Quantitative condition assessment of structures has been traditionally using proof load test leading to an indication of the load-carrying capacity. Alternative approaches using ultrasonic, dynamics etc. are based on the unloaded state of the structure and anomalies may not be fully mobilized in the load resisting path and thus their effects are not fully included in the measured responses. This paper studies the effect of the load carried by a reinforced concrete beam on the assessment result of the crack damage. This assessment can only be performed with an approach based on static measurement. The crack damage is modelled as a crack zone over an area of high tensile stress of the member, and it is represented by a damage function for the simulation study. An existing nonlinear optimization algorithm is adopted. The identified damage extent from a selected high level load and a low load level are compared, and it is concluded that accurate assessment can only be obtained at a load level close to the one that creates the damage.
Magazine of the Korean Society of Agricultural Engineers
/
v.44
no.2
/
pp.136-147
/
2002
Characteristics of unit loads of pollutants were investigated at a paddy fields area(Soro-ri) with large-scaled plots on loam soil during irrigation seasons of 1999 ∼2000. The average irrigation requirement of experimental paddy area are estimated at over 3,000 mm. The unit loads of pollutants in paddy fields area are determined by subtracting irrigation water load from outflow load (percolated and surface outflow loads). Surface outflow load in rainy days was calculated using the relationships of discharge and load, which are grouped into fertilizing and non-fertilizing periods. The ratios of the surface outflow load in rainy days to the total surface outflow load are 16.4% for T-N, 26.8% for T-P, and 23.3% far CODc,. The unit loads of pollutants show month-to-month and year-to-year variations, and monthly unit load of pollutants can show negative values, indicating that the paddy area acts as the pollutants sink. The average unit loads of the pollutants during irrigation seasons were estimated at 18.2 kg/ha fur T-N, 0.31 kg/ha for T-P, and 43.3 kg/ha for CODc,, which are smaller than the reported values for Kosei area in Japan.
Journal of the Korea institute for structural maintenance and inspection
/
v.17
no.5
/
pp.49-58
/
2013
Eight small scale circular reinforced concrete columns were tested under cyclic lateral load with constant axial load. Test specimens were designed with 4.5 aspect ratio. The selected test variables are longitudinal steel ratio, transverse steel ratio, yielding strength of longitudinal steel and axial load ratio. The test results of columns with different longitudinal steel ratio, transverse steel ratio and axial load ratio showed different seismic performance such as equivalent damping ratio, residual displacement and effective stiffness. It was found that the column with low strength of longitudinal steel showed significantly reduced seismic performance, especially for equivalent damping ratio and residual displacement. The regulation of flexural over-strength is adopted by Korea Bridge Design Specifications (Limited state design, 2012). The test results are compared with nominal strength, result of nonlinear moment-curvature analysis and the design specifications such as AASHTO LRFD and Korea Bridge Design Specifications (Limited state design).
To prevent over-testing of the test-item during random vibration testing Scharton proposed and discussed the force limited random vibration testing (FLVT) in a number of publications. Besides the random vibration specification, the total mass and the turn-over frequency of the load (test item), $C^2$ is a very important parameter for FLVT. A number of computational methods to estimate $C^2$ are described in the literature, i.e., the simple and the complex two degrees of freedom system, STDFS and CTDFS, respectively. The motivation of this work is to evaluate the method for the computation of a realistic value of $C^2$ to perform a representative random vibration test based on force limitation, when the adjacent structure (source) description is more or less unknown. Marchand discussed the formal description of getting $C^2$, using the maximum PSD of the acceleration and maximum PSD of the force, both at the interface between load and source. Stevens presented the coupled systems modal approach (CSMA), where simplified asparagus patch models (parallel-oscillator representation) of load and source are connected, consisting of modal effective masses and the spring stiffness's associated with the natural frequencies. When the random acceleration vibration specification is given the CSMA method is suitable to compute the value of the parameter $C^2$. When no mathematical model of the source can be made available, estimations of the value $C^2$ can be find in literature. In this paper a probabilistic mathematical representation of the unknown source is proposed, such that the asparagus patch model of the source can be approximated. The chosen probabilistic design parameters have a uniform distribution. The computation of the value $C^2$ can be done in conjunction with the CSMA method, knowing the apparent mass of the load and the random acceleration specification at the interface between load and source, respectively. Data of two cases available from literature have been analyzed and discussed to get more knowledge about the applicability of the probabilistic method.
KSII Transactions on Internet and Information Systems (TIIS)
/
v.12
no.9
/
pp.4103-4121
/
2018
Quality of Service (QoS) awareness is recognized as a key point for the success of Internet of Things (IOT).Realizing the full potential of the Internet of Things requires, a real-time task scheduling algorithm must be designed to meet the QoS need. In order to schedule tasks with diverse QoS requirements in cloud environment efficiently, we propose a task scheduling strategy based on dynamic priority and load balancing (DPLB) in this paper. The dynamic priority consisted of task value density and the urgency of the task execution, the priority is increased over time to insure that each task can be implemented in time. The scheduling decision variable is composed of time attractiveness considered earliest completion time (ECT) and load brightness considered load status information which by obtain from each virtual machine by topic-based publish/subscribe mechanism. Then sorting tasks by priority and first schedule the task with highest priority to the virtual machine in feasible VMs group which satisfy the QoS requirements of task with maximal. Finally, after this patch tasks are scheduled over, the task migration manager will start work to reduce the load balancing degree.The experimental results show that, compared with the Min-Min, Max-Min, WRR, GAs, and HBB-LB algorithm, the DPLB is more effective, it reduces the Makespan, balances the load of VMs, augments the success completed ratio of tasks before deadline and raises the profit of cloud service per second.
Kim, Hongjin;Park, Young-Jun;Park, Ju-Hyun;Ryu, Ho-Cheol;Pu, Young-Gun;Lee, Minjae;Hwang, Keumcheol;Yang, Younggoo;Lee, Kang-Yoon
Journal of Power Electronics
/
v.16
no.6
/
pp.2024-2034
/
2016
This paper presents a DC-DC buck converter with a Phase-Locked Loop (PLL) that can compensates for power efficiency degradation over a wide input range. Its switching frequency is kept at 2 MHz and the delay difference between the High side driver and the Low side driver can be minimized with respect to Process, Voltage and Temperature (PVT) variations by adopting the PLL. The operation mode of the proposed DC-DC buck converter is automatically changed to Pulse Width Modulation (PWM) or PWM frequency modes according to the load condition (heavy load or light load) while supporting a maximum load current of up to 1.2 A. The PWM frequency mode is used to extend the CCM region under the light load condition for the PWM operation. As a result, high efficiency can be achieved under the light load condition by the PWM frequency mode and the delay compensation with the PLL. The proposed DC-DC buck converter is fabricated with a $0.18{\mu}m$ BCD process, and the die area is $3.96mm^2$. It is implemented to have over a 90 % efficiency at an output voltage of 5 V when the input range is between 8 V and 20 V. As a result, the variation in the power efficiency is less than 1 % and the maximum efficiency of the proposed DC-DC buck converter with the PLL is 95.4 %.
In this paper, the characteristics of LCL set-up parameters for the satellite load distribution are analyzed under the electrical system environment, implemented the LCL circuits and evaluated the performance and its behaviour. Recently, it is implemented the load distribution circuit by latching current limiter(LCL) rather than conventional fuse and relay for the protection of the satellite power system from a fault load. The LCL circuit is composed of the electrical components, not mechanical parts with the fuse and relay. When detected the over current on a fault load, it is activated to maintain the trip-off level for set-up time and then cut-off the load power by the active control. It is more flexible and provided a chance to reuse of the load in case of temporarily event, but the fuse and relay can't be used again after activating due to the physical disconnection. However, for implementation of LCL circuit, it should be carefully considered the behavior of the LCL circuit under the worst electrical system environment and applied it to define the set-up parameters related with over-current inhibition.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.