• 제목/요약/키워드: outage

Search Result 894, Processing Time 0.019 seconds

A Study on the Design of Prediction Model for Safety Evaluation of Partial Discharge (부분 방전의 안전도 평가를 위한 예측 모델 설계)

  • Lee, Su-Il;Ko, Dae-Sik
    • Journal of Platform Technology
    • /
    • v.8 no.3
    • /
    • pp.10-21
    • /
    • 2020
  • Partial discharge occurs a lot in high-voltage power equipment such as switchgear, transformers, and switch gears. Partial discharge shortens the life of the insulator and causes insulation breakdown, resulting in large-scale damage such as a power outage. There are several types of partial discharge that occur inside the product and the surface. In this paper, we design a predictive model that can predict the pattern and probability of occurrence of partial discharge. In order to analyze the designed model, learning data for each type of partial discharge was collected through the UHF sensor by using a simulator that generates partial discharge. The predictive model designed in this paper was designed based on CNN during deep learning, and the model was verified through learning. To learn about the designed model, 5000 training data were created, and the form of training data was used as input data for the model by pre-processing the 3D raw data input from the UHF sensor as 2D data. As a result of the experiment, it was found that the accuracy of the model designed through learning has an accuracy of 0.9972. It was found that the accuracy of the proposed model was higher in the case of learning by making the data into a two-dimensional image and learning it in the form of a grayscale image.

  • PDF

A Study on the application method of UPS's Battery Safety for battleship Command and Fire Control System (지휘무장통제체계용 UPS 배터리의 안전성 확보방안 연구)

  • Park, Gun-Sang;Kim, Jae-Yun;Kim, Dong-Gyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.3
    • /
    • pp.587-596
    • /
    • 2021
  • Naval battleships have systems to perform special purposes, such as the Command and Fire Control System (CFCS). Some of the this equipment should be equipped with an Uninterruptible Power System (UPS ) to ensure operational continuity and the backup of important data, even during unexpected power outages caused by problems with the ship's power generator. Heavy combat losses can occur if the equipment cannot satisfy the function. Therefore, it is important to design a stable UPS. The battery and Battery Management System (BMS) are two of the most important factors for designing a stable UPS. A power outage will be encountered if the battery and BMS are not stable. The customer will be exposed to abnormal situations, loss of important tactical data, and inability to operate some of the CFCS. As a result, an enhanced safety system should be designed. Thus, this study implemented and verified the improved system in terms of three methods, such as comparative analysis of the batteries, improvement about leakage current of the circuit, and tests of the aggressive environmental resistance to improve the UPS for CFCS.

Utilization of EPRI ChemWorks tools for PWR shutdown chemistry evolution modeling

  • Jinsoo Choi;Cho-Rong Kim;Yong-Sang Cho;Hyuk-chul Kwon;Kyu-Min Song
    • Nuclear Engineering and Technology
    • /
    • v.55 no.10
    • /
    • pp.3543-3548
    • /
    • 2023
  • Shutdown chemistry evolution is performed in nuclear power plants at each refueling outage (RFO) to establish safe conditions to open system and minimize inventory of corrosion products in the reactor coolant system (RCS). After hydrogen peroxide is added to RCS during shutdown chemistry evolution, corrosion products are released and are removed by filters and ion exchange resins in the chemical volume control system (CVCS). Shutdown chemistry evolution including RCS clean-up time to remove released corrosion products impacts the critical path schedule during RFOs. The estimation of clean-up time prior to RFO can provide more reliable actions for RCS clean-up operations and transients to operators during shutdown chemistry. Electric Power Research Institute (EPRI) shutdown calculator (SDC) enables to provide clean-up time by Co-58 peak activity through operational data from nuclear power plants (NPPs). In this study, we have investigated the results of EPRI SDC by shutdown chemistry data of Co-58 activity using NPP data from previous cycles and modeled the estimated clean-up time by EPRI SDC using average Co-58 activity of the NPP. We selected two RFO data from the NPP to evaluate EPRI SDC results using the purification time to reach to 1.3 mCi/cc of Co-58 after hydrogen peroxide addition. Comparing two RFO data, the similar purification time between actual and computed data by EPRI SDC, 0.92 and 1.74 h respectively, was observed with the deviation of 3.7-7.2%. As the modeling the estimated clean-up time, we calculated average Co-58 peak concentration for normal cycles after cycle 10 and applied two-sigma (2σ, 95.4%) for predicted Co-58 peak concentration as upper and lower values compared to the average data. For the verification of modeling, shutdown chemistry data for RFO 17 was used. Predicted RCS clean-up time with lower and upper values was between 21.05 and 27.58 h, and clean-up time for RFO 17 was 24.75 h, within the predicted time band. Therefore, our calculated modeling band was validated. This approach can be identified that the advantage of the modeling for clean-up time with SDC is that the primary prediction of shutdown chemistry plans can be performed more reliably during shutdown chemistry. This research can contribute to improving the efficiency and safety of shutdown chemistry evolution in nuclear power plants.

Determination of proper ground motion prediction equation for reasonable evaluation of the seismic reliability in the water supply systems (상수도 시스템 지진 신뢰성의 합리적 평가를 위한 적정 지반운동예측식 결정)

  • Choi, Jeongwook;Kang, Doosun;Jung, Donghwi;Lee, Chanwook;Yoo, Do Guen;Jo, Seong-Bae
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.9
    • /
    • pp.661-670
    • /
    • 2020
  • The water supply system has a wider installation range and various components of it than other infrastructure, making it difficult to secure stability against earthquakes. Therefore, it is necessary to develop methods for evaluating the seismic performance of water supply systems. Ground Motion Prediction Equation (GMPE) is used to evaluate the seismic performance (e.g, failure probability) for water supply facilities such as pump, water tank, and pipes. GMPE is calculated considering the independent variables such as the magnitude of the earthquake and the ground motion such as PGV (Peak Ground Velocity) and PGA (Peak Ground Acceleration). Since the large magnitude earthquake data has not accumulated much to date in Korea, this study tried to select a suitable GMPE for the domestic earthquake simulation by using the earthquake data measured in Korea. To this end, GMPE formula is calculated based on the existing domestic earthquake and presented the results. In the future, it is expected that the evaluation will be more appropriate if the determined GMPE is used when evaluating the seismic performance of domestic waterworks. Appropriate GMPE can be directly used to evaluate hydraulic seismic performance of water supply networks. In other words, it is possible to quantify the damage rate of a pipeline during an earthquake through linkage with the pipe failure probability model, and it is possible to derive more reasonable results when estimating the water outage or low-pressure area due to pipe damages. Finally, the quantifying result of the seismic performance can be used as a design criteria for preparing an optimal restoration plan and proactive seismic design of pipe networks to minimize the damage in the event of an earthquake.