• Title/Summary/Keyword: order priority

Search Result 1,656, Processing Time 0.03 seconds

- A Study on the Priority Evaluation Model to Improve the Reliability & Feasibility of Public Projects - (정책사업 신뢰성과 타당성 향상을 위한 우선순위 의사결정모형)

  • Seo Jang Hoon;Jang Hyeon Soo;Park Myeong Kyu
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.4
    • /
    • pp.107-122
    • /
    • 2004
  • This study aims to examine the usefulness on the Evaluation Process for the Feasibility & Priority of A Certain Public Projects. and the Methodology used AHP(Analytic Hierarchy Process) which used pairwise comparisons of the alternatives and criteria for solving discrete alternative multicriteria decision problems. In this paper, we present a similar phenomenon, rank reversal problem, when we apply the AHP to group decision making process. The problem is identified by an example problem in that the previous rank order of Public Projects choices. we also present three different methods to prevent the undesirable characteristic of the original AHP in appling to Decision Making Process.

Priority Rankings of the System Modifications to Reduce Core Damage Frequency of Wolsong NPP Units 2/3/4

  • Kwon, Jong-Jooh;Kim, Myung-Ki;Seo, Mi-Ro;Hong, Sung-Yull
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1998.05a
    • /
    • pp.899-905
    • /
    • 1998
  • The analysis priority makings the recommendation to reduce the total core damage frequency (CDF) of Wolsong nuclear Power Plant nits 2/3/4 was Performed in this paper. In order to derive the recommendation, the sensitivity analysis of CDF on which major contributors effect m performed based on the accident quantification results during Level 1 Probabilistic safety assessment (PSA). Priorities were ranked in tile way that compares the CDF reduction rate with efforts required to implement those recommendations using risk matrix

  • PDF

The MAC Scheme Based on Retransmission Probability and Priority for WATM (무선 ATM LAN에서 재전송 확률과 우선순위를 고려한 MAC 연구)

  • An, Seok;Ahn, Yun-Shok;Kim, Jae-Ha;Suh, Seung-Woo;Seo, Young-Seok;Kim, Byung-Gi
    • Proceedings of the KIEE Conference
    • /
    • 1998.11b
    • /
    • pp.633-636
    • /
    • 1998
  • The next generation of wireless communication seems to be multimedia communications based on ATM and requires the efficient MAC(Medium Access Control) protocol to support multimedia traffic with the various characteristics of QoS(Quality of Service). A Proposed D-PRMA++ MAC protocol is operated dynamically by the retransmission probability and the number of reservation channel on the side of MS(Mobile Station) Also, On the side of BS(Base Station) it analyzes the parameters receive d from all MS and allocates the slots by priority in order to guarantee QoS.

  • PDF

Study of the BIM technology, market trends and visions in the design phase (설계단계에서 BIM 기술, 시장 동향 및 비전에 관한 연구)

  • Lee, Da-un;Yun, Seok-heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.215-216
    • /
    • 2015
  • In order to facilitate the introduction of BIM technology in the construction project of fact, many countries such as Singapore and the United States, is developing a roadmap of BIM technology development. To develop this, recently, it must be analyzed in advance the state of BIM technology domestic projects. In this study, we define the elements of technology BIM, and analyzed the current situation. In addition, I was evaluated and priority importance to the elemental technology derived. As a result, elemental technology most was the level inferior to foreign countries, and the field of ordering standard planning and has been highly valued and priority of particular importance, but currently, the level of domestic, analysis and most delayed has been. These results are judged to be useful in the development of the roadmap and direction of technological development of BIM in the future.

  • PDF

A Study on Priority Setting for Promising Technology in Division of Senior Friendly Product using the AHP (AHP를 이용한 고령친화제품 유망기술의 우선순위 설정에 관한 연구)

  • Yoo, Jae Seong
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.207-214
    • /
    • 2015
  • The purpose of this paper is an application of AHP(Analytic Hierarchy Process) in the priority setting of promising technology in division of senior friendly product based on the previous studies. In this paper, the decision criteria for evaluating promising technologies in division of senior friendly product are identified and the hierarchical structure of decision making process is developed systematically. Subsequently the values of weights for relative importance among decision criteria are derived using AHP methodology, and the score of importance of promising technology in division of senior friendly product with respect to each criterion is evaluated. Finally the score of each promising technology in division of senior friendly product is quantified in order to prioritize them. We discuss implications of our results with a viewpoint of technology policy in division of senior friendly product.

Software structure design for processing various tactical data

  • Kim, Jin Woo;Lee, Woo Sin;Lee, Seung Chan;Kim, Young Don;Jin, So Yeon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.22 no.11
    • /
    • pp.39-47
    • /
    • 2017
  • In this paper, we propose a message transmission processing structure for efficient use of radio resources. Existing tactical data links have more data and accumulate more data than the amount of tactical data planned according to the situation. This may result in delays in operations and additional problems. To prevent this, priority is assigned to the message and transmission is performed according to the priority on a single basis. And we design a processing structure that can update duplicate messages and delete old messages in order to prevent waste of radio resources. Experiments are conducted to verify that these structures can be implemented and applied to data links.

SCHEDULING TECHNIQUE FOR CONTROL STEP (스케듈링 기법 연구)

  • JeongYoungSong;NamWooBack
    • Journal of the Korean Geophysical Society
    • /
    • v.4 no.3
    • /
    • pp.163-173
    • /
    • 2001
  • This paper deals with scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informaion trom the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth - order elliptic wave filter of a standard benchmark moedl, and then it is drawing up T.N matrix table by the number resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource th use this table. All of existing list scheduling techniques determine the priority function first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

Optimal Offset-Time Decision for QoS in Optical Burst Switching Networks

  • Kim, Sung-Chang;Choi, Jin-Seek;Yoon, Bin-Yeong;Kang, Min-Ho
    • Journal of Communications and Networks
    • /
    • v.9 no.3
    • /
    • pp.312-318
    • /
    • 2007
  • In this paper, we propose the optimal offset-time decision (OOD) algorithm which can effectively reduce the pre-transmission delay compared to the perfect isolation model, and can also be extended to general n priority classes while the target loss probability of each class is guaranteed for the variable offered load. In order to drive the OOD algorithm, we first analyze the loss probability of each priority class through class aggregation and iteration method; the analytic results obtained through the proposed algorithm are then validated with results garnered from extensive simulation tests.

Scheduling Technique for Control Step (제어구간에 의한 스케듈링 기법)

  • Song, Jeong-Young;Back, Nam-Woo
    • The Journal of Engineering Research
    • /
    • v.4 no.1
    • /
    • pp.35-45
    • /
    • 2002
  • This paper deals with the scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informations from the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth – order elliptic wave filter of a standard benchmark model, and then it is drawing up T.N matrix table by the number of resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource to use this table. All of existing list scheduling techniques determine the priority functions first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

Establish Priority of Kind of Disaster for City Safety (도시안전을 위한 재난유형 우선순위 정립)

  • Choi, Yun-Cheul;Seo, Gwang-Deok
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.7
    • /
    • pp.11-18
    • /
    • 2018
  • Modern cities are exposed to various dangers due to advanced technologies and advanced technologies. As a result, the desire for citizen's safety is increasing day by day, and the sense of insecurity is reaching extreme. In order to respond to the paradigm of the era for safety, the government has stipulated that crisis management manuals are prepared and operated according to the type of disaster. In this research, before preparing and managing crisis management manuals, we classify the types of disasters that can occur in A local authority, establish priorities of types of disasters to be managed with priority, We will try to utilize it as a basic material for the creation and management of.