• Title/Summary/Keyword: order priority

Search Result 1,656, Processing Time 0.034 seconds

Dispatching Rule based on Chromaticity and Color Sequence Priorities for the Gravure Printing Operation (색도 및 색순에 따른 그라비아 인쇄 공정의 작업 순서 결정 규칙)

  • Bae, Jae-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.10-20
    • /
    • 2020
  • This paper presents a method to measure the similarity of assigned jobs in the gravure printing operation based on the chromaticity and color sequence, and order the jobs accordingly. The proposed dispatching rule can be used to fulfill diverse manufacturing site requirements because the parameters can be adjusted to prioritize chromaticity and color sequence. In general, dispatching rules either ignore the job-changing time or require that the time be clearly defined. However, in the gravure printing operation targeted in this study, it is difficult to apply the general dispatching rule because of the difficulties in quantifying the job-changing time. Therefore, we propose a method for generalizing assignment rules of the job planner, allocating relative similarity among assigned jobs, and determining the sequence of jobs accordingly. Chromaticity priority is determined by the arrangement of the color assignments in the printing operation; color sequence priority is determined by the addition, deletion, or change in a specific color sequence. Finally, the job similarity is determined by the dot product of the chromaticity and color sequence priorities. Implementation of the proposed dispatching rule at an actual manufacturing site showed the planner present the same job order as that obtained using the proposed rule. Therefore, this rule is expected to be useful in industrial sites where clear quantification of the job-changing time is not possible.

Strategic Management of the Policy for Seoul City's Hangang Renaissance (네트워크 분석적 의사결정방법(ANP)을 이용한 서울시 한강르네상스 정책의 전략적 관리방안)

  • Cho, Se-Hwan;Jeong, Gwang-Seop;Kim, Sang-Won;Won, Jai-Mu
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.1
    • /
    • pp.1-10
    • /
    • 2011
  • This study was performed for the purpose of reviewing the strategic management direction and ideas of the policy for Seoul City's Hangang Renaissance. In order to accomplish this, levels were established for each step of the policy and the policy priority by level was derived. The policy priority by level was analyzed by a decision making model through the Analytic Network Process(ANP) and the priority would be the standard to judge the order of priority. The analysis results showed that there was not a big difference between the priorities of two basic concepts: restoration and creation. The fourth level, detail plan of the third level, showed priority that development by type for waterside city in case of reorganizing city space and diversification of land utilization, utilization of riverside space in water front town for public and composit purpose, establishment of comprehensive plan on constructions in case of improving the landscape of Hangang and unified design plan rose to important element in case of forming Hangang park with the me. Based on the results of priority analysis, we would like to propose for the direction about the policy on Hangang Renaissance project, the policies forming Hangang Park with theme through unified design plan and reorganizing city space have to be proceed preferentially and connected with other plans.

Optimal Management Scheme for Phosphorus Discharged from Public Sewage Treatment Plant Located in Upstream Basin of Paldang Lake (팔당호 상류수계에 위치한 공공 하수종말처리시설의 총인 배출 최적관리)

  • Woo, Younggug;Park, Eunyoung;Jeon, Yangkun;Jeong, Myungsuk;Rim, Jaymyung
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.2
    • /
    • pp.200-209
    • /
    • 2011
  • The purpose of the study is to optimally manage sewage treatment plant with analysis of phosphorus contribution and improvement of water quality contributing rate in the effect of inflowing point of effluent and Pal-Dang lake after reducing T-P discharge from large scale public sewage treatment plant at upstream of Pal-Dang lake. Also, this study, for enforcement of T-P in effluent, plans optimal management of effluent T-P through examining propriety of environmental, technological, and economical aspect such as water quality standard of domestic and foreign T-P and related policy. In regarding optimal management of T-P discharged from public sewage treatment plant located in upstream of Pal-Dang lake, the study drew following conclusions. With the optimal management of public sewage treatment plant, it showed that a pollution level became higher in the order of Sumgang E in South-Han river, C in Dalcheon, B1 B2, A in North-Han river, and J in Kyungancheon, and it is required reduction of T-P first. The highest value in analysis of benefit-costs from sewage treatment plant in the selected research area was Kyungan B, and the others are with the order of Jojong A, Bokha A, Kyungan A, and Yanghwa A. With result of this study, all 14 areas are required more enforced phosphorus treatment. The study resulted that the most top priority areas were Hangang F, Sumgang B, and Gyungan A, top priority areas were Bokha A, Dalcheon B, and Cheongmi A, priority areas were Hangang E, Heukcheon A, Gyungan B, and Jojong A, and potential areas were Sumgang A, Yanghwa A, Dalcheon A, and Hangang D. It seems to be appropriate to apply 0.2 mg/L of T-P treatment for water supply source reservation, 0.5 mg/L for the other areas by locally, and 0.2~0.5 mg/L for biological nitrogen phosphorus treatment method and 0.5~1 mg/L for Conventional Activated Sludge by technologically. Also, it may be appropriate to apply 0.2 mg/L for the most top priority area(I), 0.3 mg/L for the top priority area(II), 0.4 mg/L for priority area(III), and 0.5 mg/L for potential area(IV) by the separation of priority area.

A Study on the Selection of Test Scope and the Prioritization of Test Case Based on Modification Method for Regression Testing (변경 메서드 기반의 회귀 테스트 검증 범위 선택 및 검증 항목 우선순위 선정에 관한 연구)

  • Jung, Woo-Jin;Rah, Sang-Rin;Choi, Yong-Lak
    • Journal of Information Technology Services
    • /
    • v.14 no.2
    • /
    • pp.129-142
    • /
    • 2015
  • The purpose of this study is to suggest an effective regression testing method in order to minimize the scope of test resulting from the modification of software and to prevent mismatch of test case and test objects. As a way to improve the efficiency of regression testing which uses a change-centric testing technique, the method flow is analyzed and grasped through a static analysis based on source code in order to identify modified parts. After the order of priority is set according to the results of user action log-based dynamic analysis on identified regression testing objects, test effect can be raised by adjusting the order of priority using code complexity. Quality assurance coverage can be checked using the user action log suggested in this study, and the progress of test and whether or not each function has been verified can be checked, too. In addition, by minimizing test parts and adjusting the order of test, costs and time can be saved, making it possible to conduct regression testing effectively.

A Study on Applications of CSP for Multi-Agent (멀티에이전트를 이용한 CSP의 활용에 관한 연구)

  • Kim, Jin-Su
    • The Journal of Engineering Research
    • /
    • v.7 no.1
    • /
    • pp.17-28
    • /
    • 2005
  • A distributed constraint satisfaction problem (distributed CSP) is a constraint satisfaction problem (CSP) in which variables and constraints are distributed among multiple automated agents. A CSP is a problem to find a consistent assignment of values to variables. Even though the definition of a CSP is very simple, a surprisingly wide variety of AI problems can be formalized as CSPs. Similarly, various application problems in DAI (Distributed AI) that are concerned with finding a consistent combination of agent actions can be formalized as distributed CPSs. The experimental results on example problems show that this algorithm is by far more efficient than the backtracking algorithm, in which the priority order is static. The priority order represents a hierarchy of agent authority, i.e., the priority of decision-marking. Therefore, these results imply that a flexible agent organization, in which the hierarchical order is changed dynamically, actually performs better than an organization in which the hierarchical order is static and rigid. Furthermore, we describe that the agent can be available to hold multiple variables in the searching scheme.

  • PDF

Activation Scheme of Mokpo New Port through a Priority Cargo Attraction Strategy (중점화물유치전략을 통한 목포신항 활성화 방안)

  • Choe, Dong-O
    • Journal of Korea Port Economic Association
    • /
    • v.21 no.4
    • /
    • pp.161-181
    • /
    • 2005
  • This paper investigates the circumstances and conditions of Mokpo Port to develop it as an international logistics stronghold and seeks scheme to maximize the local economic ripple effect through construction and activation of Mokpo New Port. Under the circumstances in which neighboring ports vying with each other have built broad spheres of influence, and competition among ports becomes fierce, a priority cargo attraction strategy should be established by using Mokpo's favorable location compared to other ports in order to ensure that a large quantity of goods is transported from Mokpo New Port. Especially, Mokpo New Port needs to be developed as a vehicles-only exporting port, as well as a port for used car exports and an import port for stones and timber.

  • PDF

Dispatching rules for assembly job shops with process times relying on machine capacity (장비가용능력에 의존적인 공정시간을 가지는 조립주문생산에서의 우선순위 규칙)

  • Kim, Bong-Hyeok;Na, Dong-Gil;Gil, Guk-Ho;Kim, Dong-Won
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.517-522
    • /
    • 2005
  • This paper addresses scheduling heuristics for an assembly job-shop that includes at least an assembly process throughout its processes. The assembly job shop has certain characteristics not only considering the precedence relationship between the processes but also considering the processing progress between the parts. In addition, it probably presents a different processing time for the same product according to the order of processes and the point of workable time, due to the difference in the availability of equipments. The paper proposes several priority-based dispatching rules that consider these characteristics of the assembly job-shop, aiming to minimize the total tardiness of products in the shop floor. Computational tests showed that job due date based priority rules significantly outperform existing priority rules in terms of total tardiness.

  • PDF

Performance analysis of a loss priority control scheme in an input and output queueing ATM switch (입출력 단에 버퍼를 가지는 ATM 교환기의 손실우선순위 제어의 성능 분석)

  • 이재용
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.22 no.6
    • /
    • pp.1148-1159
    • /
    • 1997
  • In the broadband integrated service digital networks (B-ISDN), ATM switches hould be abld to accommodate diverse types of applications ith different traffic characteristics and quality ddo services (QOS). Thus, in order to increase the utilization of switches and satisfy the QOS's of each traffic type, some types of priority control schemes are needed in ATM switches. In this paper, a nonblocking input and output queueing ATm switch with capacity C is considered in which two classes of traffics with different loss probability constraints are admitted. 'Partial push-out' algorithm is suggested as a loss priority control schemes, and the performance of this algorithm is analyzed when this is adopted in input buffers of the switch. The quque length distribution of input buffers and loss probabilities of each traffic are obtained using a matrix-geometric solution method. Numerical analysis and simulation indicate that the utilization of the switch with partial push-out algorithm satisfying the QOS's of each traffic is much higher than that of the switch without control. Also, the required buffer size is reduced while satisfying the same QOS's.

  • PDF

An Evaluation of Priority for the Green Energy Technologies Business (그린에너지기술 사업화를 위한 우선순위 평가)

  • Lee, Deokki;Hong, Jong-Chul;Park, Soo-Uk;Baik, Keum Hee
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.135.2-135.2
    • /
    • 2011
  • The goal of this study is the derivation of priority for business in the areas of green energy technologies. In this paper, we calculated the importance weights of impact factors using the AHP (Analytic Hierarchy Process) method in order to derivation of priority to the green energy technologies business. AHP is a useful method for evaluating multi-criteria decision making problems. To apply the AHP method, specialists for the assessment have been identified by using the concept of 'plan, do, see' and the decision-making hierarchy was established. We selected 5 criteria and 16 sub-criteria for impact factors by brainstorming. According to the result in this study, the most important impact factor is the possibility of commercialization, the second is the possibility of developing the fundamental technology, and the third is the possibility of convergence technology.

  • PDF

Disaster Recovery Priority Decision of Total Information System for Port Logistics : Fuzzy TOPSIS Approach (항만물류종합정보시스템의 재난복구 우선순위결정 : 퍼지 TOPSIS 접근방법)

  • Kim, Ki-Yoon;Kim, Do-Hyeong
    • Journal of Information Technology Services
    • /
    • v.11 no.3
    • /
    • pp.1-16
    • /
    • 2012
  • This paper is aimed to present a fuzzy decision-making approach to deal with disaster recovery priority decision problem in information system. We derive an evaluation approach based on TOPSIS(Technique for Order Performance by Similarity to Ideal Solution), to help disaster recovery priority decision of total information system for port logistics in a fuzzy environment where the vagueness and subjectivity are handled with linguistic terms parameterized by trapezoidal fuzzy numbers. This study applies the fuzzy multi-criteria decision-making method to determine the importance weight of evaluation criteria and to synthesize the ratings of candidate disaster recovery system. Aggregated the evaluators' attitude toward preference, then TOPSIS is employed to obtain a crisp overall performance value for each alternative to make a final decision. This approach is demonstrated with a real case study involving 4 evaluation criteria(system dependence, RTO, loss, alternative business support), 7 information systems for port logistics assessed by 5 evaluators from Maritime Affairs and Port Office.