• Title/Summary/Keyword: optimal test plan

Search Result 86, Processing Time 0.029 seconds

A Basic Method for Composite Power System Expansion Planning under Security Criteria (안전도 제약을 고려한 복합전력계통의 확충계획에 관한 기초연구)

  • Kwon, Jung-Ji;Tran, TrungTinh;Choi, Jae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.557-559
    • /
    • 2005
  • This paper proposes a method for choosing the best composite power system expansion plan considering a contingency security criterion. The proposed method minimizes the investment budget fer constructing new transmission lines subject to contingency criterion. it models the power system expansion problem as an integer programming one. The method solves for the optimal strategy using a branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Although the proposed method is applied to a simple sample study, the test results demonstrate that the proposed method is suitable for solving the power system expansion-planning problem subject to practical future uncertainties.

  • PDF

A Study on a Path Planning and Real-Time Trajectory Control of Autonomous Travelling Robot for Unmanned FA (무인FA를 위한 자율주행 로봇의 경로계획 및 실시간 궤적제어에 관한 연구)

  • Kim, Hyeun-Kyun;Sim, Hyeon-Suk;Hwang, Won-Jun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.19 no.2
    • /
    • pp.75-80
    • /
    • 2016
  • This study proposes a efficient technology to control the optimal trajectory planning and real-time implementation method which can perform autonomous travelling for unmaned factory automation. Online path planning should plan and execute alternately in a short time, and hence it enables the robot avoid unknown dynamic obstacles which suddenly appear on robot's path. Based on Route planning and control algorithm, we suggested representation of edge cost, heuristic function, and priority queue management, to make a modified Route planning algorithm. Performance of the proposed algorithm is verified by simulation test.

Forecasting Renewable Energy Using Delphi Survey and the Economic Evaluation of Long-Term Generation Mix (델파이 활용 신재생 에너지 수요예측과 장기전원 구성의 경제성 평가)

  • Koo, Hoonyoung;Min, Daiki
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.3
    • /
    • pp.183-191
    • /
    • 2013
  • We address the power generation mix problem that considers not only nuclear and fossil fuels such as oil, coal and LNG but also renewable energy technologies. Unlike nuclear or other generation technologies, the expansion plan of renewable energy is highly uncertain because of its dependency on the government policy and uncertainty associated with technology improvements. To address this issue, we conduct a delphi survey and forecast the capacity of renewable energy. We further propose a stochastic mixed integer programming model that determines an optimal capacity expansion and the amount of power generation using each generation technology. Using the proposed model, we test eight generation mix scenarios and particularly evaluate how much the expansion of renewable energy contributes to the total costs for power generation in Korea. The evaluation results show that the use of renewable energy incurs additional costs.

A Study on Methodology of U-City Promotion(Top-Down vs Bottom-Up Approach Model) (U-City 추진방법론에 대한 고찰(Top Down vs Bottom Up 모델))

  • Lee, Sang-Hun;Kim, Hyong-Bok
    • Spatial Information Research
    • /
    • v.17 no.1
    • /
    • pp.131-144
    • /
    • 2009
  • Recently, a lot of local autonomous entities are promoting Ubiquitous City(U-City) Construction by integrating Information Communication Technology(ICT) with city development, and also internationally, a lot of cities are making efforts to develop U-City to intensify a city's competitive strength and improve life quality of city dwellers. In keeping with such a stream of the times, each local autonomous entity and project developer are developing a lot of methodologies to establish optimal U-City in corresponding cities and also inquiring into a variety of development procedures, such as connecting existing urban development methods with information establishment methods. The method used usually is to establish Information strategy Plan(ISP) for a city which will be developed through consulting in the stage of city development planning. ISP is to establish vision & strategy for building the ubiquitous city and is a methodology including city vision, strategy, goal, and implementation method, etc. However, due to a lot of variables, such as a variety of city environment, establishment period, budget, information technology, and etc., it is difficult to contain establishment plans for every occasion in a similar method, in reality. Therefore, it is naturally necessary to suggest plans for city vision & strategy, and selection of element technology/service. Thus, this paper suggests models for vision & strategy establishment of U-City and suggests Top-Down Approach and Bottom-Up Approach method as a plan for U-City establishment. In addition, this paper analyzes general promotion methodologies for constructing U-City and analyzes how these two strategic methods [Top-Down Approach and Bottom-Up Approach] for city vision establishment are composed in such a methodology, to define and analyze its constituent plan.

  • PDF

A Study on Transmission System Expansion Planning on the Side of Highest Satisfaction Level of Decision Maker

  • Tran TrungTinh;Kang Sung-Rok;Choi Jae-Seok;Billinton Roy;El-keib A. A.
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.1
    • /
    • pp.46-55
    • /
    • 2005
  • This paper proposes a new method for choice of the best transmission system expansion plan on the side of highest satisfaction level of decision maker using fuzzy integer programming. The proposed method considers the permissibility and ambiguity of the investment budget (economics) for constructing the new transmission lines and the delivery marginal rate (reliability criteria) of the system by modeling the transmission expansion problem as a fuzzy integer programming one. It solves the optimal strategy (reasonable as well as flexible) using a fuzzy set theory-based on branch and bound method that utilizes a network flow approach and the maximum flow-minimum cut set theorem. Under no or only a very small database for the evaluation of reliability indices, the proposed technique provides the decision maker with a valuable and practical tool to solve the transmission expansion problem considering problem uncertainties. Test results on the 63-bus test system show that the proposed method is practical and efficiently applicable to transmission expansion planning.

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF

Case Study on the Application of Chain Saw Machine for the Underground Marble Quarrying (갱내 대리석 채석을 위한 체인쏘머신 적용 사례연구)

  • Ju, Jaeyeol;Lee, Kwangpyo;Kim, Jaedong
    • Tunnel and Underground Space
    • /
    • v.23 no.3
    • /
    • pp.180-191
    • /
    • 2013
  • The purpose of this research was to find an optimal quarrying for marble by analyzing the applicability and the work efficiency of a chain saw machine newly introduced in the underground Baekwoon mine. From the test results of the physical properties of Baekwoon marble, which affects the efficiency of rock cutting, it was found to have similar physical characteristics as the ones which are now being produced in the other areas in Korea. And especially it shows isotropic property, which can be thought to be advantageous as a dimensional stone. To check the long-term quality of the marble as a stone material, several tests such as corrosion resistance test and abrasion test were carried out. It was found to be vulnerable to acid rain with decrease of weight and seismic wave velocity after applying artificial rain at pH 5.6 for 50 times. The percentage of wear from abrasion test was 22.67%. The working time and cutting speed of the chain saw machine were recorded and analyzed during the test-run at the quarry. The overall work cycle was assorted into 9 unit operations and the operating time per each unit was drawn. The operating times for the two cutting patterns, which could be possibly applicable to the work site, were compared. The results indicated that the pattern B, that the cutting sequence was set to minimize the movement of the machine, showed 6% less working hours than the pattern A, which first cuts the outer boundary. With cutting pattern analysis, the ore body in the Baekwoon mine was 3 dimensionally modeled and a quarrying plan considering the existing conditions of the marble was suggested.

Predictive Factors to Health Promotion Behaviors in Breast Cancer Patients Using Pender's Health Promotion Model (Pender의 모형을 적용한 유방암 환자의 건강증진행위 예측요인)

  • So, In-Suk;Jeong, Hye-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.3
    • /
    • pp.258-269
    • /
    • 2017
  • This study was conducted to examine the predictive factors for health promotion behaviors of breast cancer patients, focusing on Pender's health promotion model (1996). Data were collected from 121 patients using a structured questionnaire from September 18 to October 26 in 2015. The data were analyzed with a t-test, ANOVA, Pearson's correlation coefficients, and hierarchical multiple regression analysis using SPSS 20.0 for Windows. The predictive factors for the health promotion behavior of the participants were social support, commitment to a plan of action, prior behavior, activity related effects, perceived self-efficacy, family function, perceived benefits of action, and situational influences. The total explanatory power of these factors was 57.8%. Development and application of a nursing intervention plan that enhances patient compliance with health promotion behavior is needed to enable breast cancer patients undergoing rehabilitation to maintain their optimal health and live a high-quality life. Patients who showed a low degree of predictive factors identified in this study are in particular need of attention.

The Spatial Electric Load Forecasting Algorithm using the Multiple Regression Analysis Method (다중회귀분석법을 이용한 지역전력수요예측 알고리즘)

  • Nam, Bong-Woo;Song, Kyung-Bin;Kim, Kyu-Ho;Cha, Jun-Min
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.2
    • /
    • pp.63-70
    • /
    • 2008
  • This paper resents the spatial electric load forecasting algorithm using the multiple regression analysis method which is enhanced from the algorithm of the DISPLAN(Distribution Information System PLAN). In order to improve the accuracy of the spatial electrical load forecasting, input variables are selected for GRDP(Gross Regional Domestic Product), the local population and the electrical load sales of the past year. Tests are performed to analyze the accuracy of the proposed method for Gyeong-San City, Gu-Mi City, Gim-Cheon City and Yeong-Ju City of North Gyeongsang Province. Test results show that the overall accuracy of the proposed method is improved the percentage error 11.2[%] over 12[%] of the DISPLAN. Specially, the accuracy is enhanced a lot in the case of high variability of input variables. The proposed method will be used to forecast local electric loads for the optimal investment of distribution systems.

Draft Guideline Matching the Treatment Technology to the Soil Contaminated Site Based on the Site Properties in Korea (국내 부지 특성을 고려한 오염토양 정화기술매칭기준안)

  • Lee, Jae-young;Lee, Minhee;Yu, Mokryun
    • Journal of Soil and Groundwater Environment
    • /
    • v.21 no.6
    • /
    • pp.1-13
    • /
    • 2016
  • The programmable logic array to match the treatment technology to the soil contaminated site based on the site properties in Korea was developed. Based on the previous technology screening system of FRTR (Federal Remediation Technology Roundtable) in USA, total 9 evaluation factors indicating the site characteristics were used for the technology matching process and 8 factors among them were quantitatively weighed in the order of importance. The class interval for each evaluation factor was linearly distributed to give the weighed score and 8 scores were summed up to prioritize the treatment technology. The optimal treatment technology for a specific site was determined according to the total score acquired from 8 evaluation factors used in this technology matching process. The reliability test for the developed technology matching system was done by using information of two real cleanup sites in Korea, suggesting that this guideline will be available to determine the most effective treatment technology to cleanup the soil contaminated site and also to assist the government or the company to design a successful and cost-effective site cleanup plan in Korea.