• Title/Summary/Keyword: optimal design factor

Search Result 706, Processing Time 0.025 seconds

Optimum Design of a Tubular Link Chain Conveyor for Sludge Transport (슬러지 이송용 튜브형 링크체인 컨베이어의 최적설계)

  • Kim, Bong-Hwan;Jeong, Young-Jae;Lee, Chang-Ryeol
    • Journal of the Korean Society of Mechanical Technology
    • /
    • v.20 no.6
    • /
    • pp.830-835
    • /
    • 2018
  • The tubular link chain conveyor works under very extreme conditions such as high tensile load, friction, and dangerous operating environments. In this study, we propose an optimal design plan for reducing cost and improving performance through weight reduction of tubular link chain conveyors for sludge transport. For light weight of tubular link chain conveyor, the optimization software using SHERPA algorithms, HEEDS was used in conjunction with ANSYS Mechanical V14.5, which is widely used in structural analysis, to achieve optimal tubular link chain. Through the optimization process, 19% light weight was achieved.

A Study on Design of Forming Process of Tube-end for Brake of Automobiles (자동차 브레이크용 튜브의 끝단 성형 공정 설계에 관한 연구)

  • Jea, Wone-Soo;Ye, Sang-Don;Min, Byeong-Hyeon
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.7 no.4
    • /
    • pp.155-160
    • /
    • 2008
  • End part of the brake tube formed with the shape of snake head is important for the braking of automobile in safety because it has to prevent crack, fracture and defects occurred during the forming process. Especially, the shape of tube end has influence on the ability of brake. Based on the procedure of process design, in this paper, the forming operation is done by finite element method and the design variables are analyzed by Taguchi method. Design variables such as the outer angle of tube end with the shape of snake head(A), the inner angle to make a hole at tube end with the shape of snake head(B) and the forming distance at tube end(C) are used. Optimization of design variables is performed to minimize the damage factor of the tube end occurred during the forming process. The value of damage factor of 0.327 was obtained under the optimal condition like $A=114^{\circ},\;B=80^{\circ}$ and C=5.3mm, respectively.

  • PDF

Bootstrap Simulation for Performance Evaluation of Optical Multifiber Connectors (붓스크랩 기법을 이용한 다심 광커넥터 손실특성 예측)

  • 전오곤;강기훈
    • Journal of Korean Society for Quality Management
    • /
    • v.26 no.4
    • /
    • pp.250-264
    • /
    • 1998
  • The purpose of the thesis is to develop simulation program for forecasting of optical connector. So we can achieve the time and the money saving for making the optical connector. Optical performance (insertion loss) of optical connector mainly relies on 3 misalignment factors-ferrule factor due to mis-manufacture from design, auto-centering effect that is fiber behavior phenomena between hole and fiber, fiber misalignment factor. Simulation use experimental data with auto-centering effect and fiber factor and use pseudo data with ferrule through random number generation because it is developing stage. In this study we a, pp.y kernel density estimation method with experimental data in order to know whether it belong to or not specific parametric distribution family. And we simulate to forecast insertion loss of optical multifiber connector under specific design model using nonparametric bootstrap resampling data and parametric pseudo samples from uniform distribution. We obtain the tolerance specifications of misalignment factors satisfying not exceed in maximum 1.0dB and choose optimal hole diameter.

  • PDF

Robust Design Using Operating Window (기능창을 이용한 강건설계법)

  • Kim, Kyung-Mo
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.7 no.1
    • /
    • pp.22-31
    • /
    • 2008
  • The operating window method is a novel approach in quality improvement. But it has not received deserved attention in academic research. If a critical factor for competing failure modes can be identified, the probability of failure can be reduced by widening the operating window of this factor. Traditional SN ratio for the operating window advocated by Taguchi has a critical shortcoming, which has been derived under the assumption that failure rates are determined by the operating window factor only. A new metric for robustness is given for the operating window method, which has relaxed the restrictive assumption of Taguchi's SN ratio. And procedures for determining optimal conditions based on the new metric is presented. The effectiveness of the proposed approach over the traditional practice is tested with the aid of a wave soldering process.

  • PDF

An Optimized PI Controller Design for Three Phase PFC Converters Based on Multi-Objective Chaotic Particle Swarm Optimization

  • Guo, Xin;Ren, Hai-Peng;Liu, Ding
    • Journal of Power Electronics
    • /
    • v.16 no.2
    • /
    • pp.610-620
    • /
    • 2016
  • The compound active clamp zero voltage soft switching (CACZVS) three-phase power factor correction (PFC) converter has many advantages, such as high efficiency, high power factor, bi-directional energy flow, and soft switching of all the switches. Triple closed-loop PI controllers are used for the three-phase power factor correction converter. The control objectives of the converter include a fast transient response, high accuracy, and unity power factor. There are six parameters of the controllers that need to be tuned in order to obtain multi-objective optimization. However, six of the parameters are mutually dependent for the objectives. This is beyond the scope of the traditional experience based PI parameters tuning method. In this paper, an improved chaotic particle swarm optimization (CPSO) method has been proposed to optimize the controller parameters. In the proposed method, multi-dimensional chaotic sequences generated by spatiotemporal chaos map are used as initial particles to get a better initial distribution and to avoid local minimums. Pareto optimal solutions are also used to avoid the weight selection difficulty of the multi-objectives. Simulation and experiment results show the effectiveness and superiority of the proposed method.

Robust Design Methodology for Optimizing Perceived QoS of VoIP (인터넷 전화의 사용자 관점 품질 최적화를 위한 강건 설계 기법 연구)

  • Yoon, Hyoup-Sang;Choi, Soo-Hyun;Kim, Seong-Joon
    • IE interfaces
    • /
    • v.22 no.1
    • /
    • pp.95-103
    • /
    • 2009
  • During the past few years, design of experiments (DOE) has been gaining acceptance in the telecommunications research community as a mean for designing and analyzing experiments economically and efficiently. In addition, the need for introducing a systematic robust design methodology (i.e., one of the most popular DOE methodologies) to network simulations has been increasing. In this paper, we present an architecture of voice over IP (VoIP) application and the E-Model for calculating the perceived quality of service (QoS). Then, we apply the Taguchi robust design methodology to optimize the perceived QoS of VoIP application, and describe the detailed step-by-step procedures. We have used ns-2 simulator to collect experimental data in which the SN ratio, a robustness measure, is analyzed to determine an optimal design condition. The analysis shows that "initial delay time in playout buffer" is a major control factor for ensuring robust behaviors of the perceived QoS of VoIP. Finally, we verify the proposed optimal design condition using a confirmation experiment.

Using an Evaluative Criteria Software of Optimal Solutions for Enterprise Products' Sale

  • Liao, Shih Chung;Lin, Bing Yi
    • Journal of Distribution Science
    • /
    • v.13 no.4
    • /
    • pp.9-19
    • /
    • 2015
  • Purpose - This study focuses on the use of evaluative criteria software for imprecise market information, and product mapping relationships between design parameters and customer requirements. Research design, data, and methodology - This study involved using the product predicted value method, synthesizing design alternatives through a morphological analysis and plan, realizing the synthesis in multi-criteria decision-making (MCDM), and using its searching software capacity to obtain optimal solutions. Results - The establishment of product designs conforms to the customer demand, and promotes the optimization of several designs. In this study, the construction level analytic method and the simple multi attribute comment, or the quantity analytic method are used. Conclusions - This study provides a solution for enterprise products' multi-goals decision-making, because the product design lacks determinism, complexity, risk, conflict, and so on. In addition, the changeable factor renders the entire decision-making process more difficult. It uses Fuzzy deduction and the correlation technology for appraising the feasible method and multi-goals decision-making, to solve situations of the products' multi-goals and limited resources, and assigns resources for the best product design.

A Study on Improving Power Quality by Real-time Reactive Power/Power Factor Compensating Equipment at Substation in Marshalling Yard (전기철도 차량기지 변전소의 실시간 무효전력/역률 보상설비 적용에 따른 전력품질 개선에 관한 연구)

  • Park, Soo-Cheol;Song, Joong-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.10
    • /
    • pp.58-67
    • /
    • 2006
  • In this paper, real-time reactive power/power factor compensating equipment is suggested for improving power quality at electrical railway's substation in marshalling yard and designing optimal capacity of compensating equipment for actual apply at current marshalling yard. For this purpose, several kind of real-time reactive power/power factor compensating equipments are introduced and SVG(Static Var Generator) as optimal compensating equipment that is suitable for load characteristics of substation in marshalling yard is suggested. This paper shows proper simulations by suggested equipment using PSIM software and describe basic compensating principle and simulation results. Optimal capacity design for applying current marshalling yard is based on real measured power quality data. Power quality improvement that is performed by SVG as real-time reactive power/power factor compensating equipment is estimated at electrical railway's substation in marshalling yard. As reference, real-time reactive power/power factor compensating equipment is composed by voltage source inverter and DC capacitors.