• Title/Summary/Keyword: operational time

Search Result 1,922, Processing Time 0.026 seconds

Damage detection and localization on a benchmark cable-stayed bridge

  • Domaneschi, Marco;Limongelli, Maria Pina;Martinelli, Luca
    • Earthquakes and Structures
    • /
    • v.8 no.5
    • /
    • pp.1113-1126
    • /
    • 2015
  • A damage localization algorithm based on Operational Deformed Shapes and known as Interpolation Damage Detection Method, is herein applied to the finite element model of a cable stayed bridge for detecting and localizing damages in the stays and the supporting steel beams under the bridge deck. Frequency Response Functions have been calculated basing on the responses of the bridge model to low intensity seismic excitations and used to recover the Operational Deformed Shapes both in the transversal and in the vertical direction. The analyses have been carried in the undamaged configuration and repeated in several different damaged configurations. Results show that the method is able to detect the damage and its correct location, provided an accurate estimation of the Operational Deformed Shapes is available. Furthermore, the damage detection algorithm results effective also when damages coexist at the same time at several location of the cable-stayed bridge members.

Impact of KAAV's Essential Assemblies and Maintenance Float Inventory Levels on Operational Availability (시뮬레이션에 기반한 KAAV 주요 수리부속과 정비대체장비 재고수준이 운용가용도에 미치는 영향 연구)

  • Jeon, Hongjoo;Ma, Jungmok
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.4
    • /
    • pp.520-528
    • /
    • 2018
  • This paper studies the optimal inventory levels of Korea Assault Amphibious Vehicle(KAAV)'s assemblies in order to assure the required operational availability. The simulation model is built and implemented for the impact of the inventory levels on operational availability. Using regression analysis and integer programming, the optimal inventory levels of essential assemblies are suggested and analyzed. Finally, sensitivity analysis is conducted with recycling maintenance delay time.

Study on The Integration Operational Metrices Improved by The Lagrange Second Order Interpolation Polynomial (Lagrange 이차 보간 다앙식을 이용한 개선된 적분 연산 행렬에 관한 연구)

  • Kim, Tai-Hoon;Lee, Hae-Ki;Chung, Je-Wook
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.51 no.7
    • /
    • pp.286-293
    • /
    • 2002
  • This paper presents a new method for finding the Block Pulse series coefficients and deriving the Block Pulse integration operational matrices which are necessary for the control fields using the Block Pulse functions. In order to apply the Block Pulse function technique to the problems of continuous-time dynamic systems more efficiently, it is necessary to find the more exact value of the Block Pulse series coefficients and drives the related integration operational matrices by using the Lagrange second order interpolation polynomial.

Optimal Provisioning Quantity Determination of Concurrent Spare Parts including Consumable Items and Repairable Items under the Availability Limitation (운용가용도 제약하에서 소모성부품과 수리순환부품이 혼재된 동시조달부품의 최적구매량 결정)

  • 오근태;김명수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.23 no.59
    • /
    • pp.53-67
    • /
    • 2000
  • In this paper we consider the CSP requirements determination problem of new equipment(machine) system. For the newly procured equipment systems, mathematical analyses are made for the system which is constructed with the consumable parts and the repairable parts to derive the associated CSP requirement determination model in mathematical expression. Based on these analyses, a mathematical model Is derived for making an optimal CSP requirement determination subject to the constraint of satisfying any given operational availability limitation. We assume that the failure of a part follows a Poisson process and the repair time has an exponential distribution. Firstly, the operational availability concept in CSP is defined and the relation between the general system availability and the operational availability is established. Secondly, the problem is formulated as the cost minimization problem that should satisfy the operational availability limitation, and then, using the generalized Lagrange multipliers method, the optimal solution procedure Is derived.

  • PDF

Pilot Plant Study on Biological Nutrient Removal of Wastewater

  • Ahn, Sang-Jin;Kim, Geon-Heung;Ahn, Bok-Kyoun
    • Korean Journal of Hydrosciences
    • /
    • v.1
    • /
    • pp.99-106
    • /
    • 1990
  • An extensive biological nutrient removal pilot plant study of anoxic/anaerobic/ aerobic treatment process was conducted to eastblish an optimum operational mode using primary dffluent. Two operational modes, (1) Qr/Q was 3.0 and maintaining EMLSS of 3100 mg/L in which the best operational results were obtained from previous bench scale study using synthetic wastewater (2) Qr/Q was 0.5 and EMLSS of 2200 mg/L which was compatible with the main plant, were Compared and evaluated for removal of nitrogen and/or phosphorous under field conditions. The nitrogen removal increased with increasing recycle ratios, but the phosphorous removal revealed more consistent results with 83percent removal efficiency in the second mode compared with 80 percent in the first mode. Above all, the two modes equally showed good BOD and nitrogen removals by nitrification-denitrification processes. It was also observed that no scum formed in the pilot plant and the sludge exhibited excellent settling characteristic all the time. The modified biological nutrient removal train can be adopted to the main plant without any major changes of their operational modes.

  • PDF

Effective Data Management Method for Operational Data on Accredited Engineering Programs (공학교육인증 프로그램의 효과적인 운영 데이터 관리 방법)

  • Han, Kyoung-Soo
    • Journal of Engineering Education Research
    • /
    • v.17 no.5
    • /
    • pp.51-58
    • /
    • 2014
  • This study proposes an effective data management method for easing the burden on self-study report by analyzing operational data on accredited engineering programs. Four analysis criteria are developed: variability, difficulty level of collecting, urgency of analysis, timeliness. After the operational data are analyzed in terms of the analysis criteria, the data which should be managed in time are extracted according to the analysis results. This study proposes a data management method in which tasks of managing the timely-managed data are performed based on the regular academic schedule, so that the result of this study may be used as a working-level reference material.

A study on the development of Logistic Support system (군수 지원시스템 개발 방법에 관한 연구)

  • 신주환;전완수;김형렬
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.2 no.2
    • /
    • pp.166-172
    • /
    • 1999
  • Weapon system is defined as a combination of primary system and logistics support system which are evaluated by capability and operational availability respectively. Weapon system developer thought that primary system was weapon system and also only primary system was important. Recent comparison of total life cycle cost showed that logistics support system was proved to be more important than primary system. However, until now no systematic approach to logistics support system development have applied in the area of developing support system and much money was exhausted by wrong logistics support system. We need to construct a universal metric for effectiveness of logistics support system and to cut out whatever activities or support elements which do not contribute to the metrics. This study describes a new approach under the name function approach to logistics support system development and also classifies five factors of failure frequency, stock out of frequency, administrative delay time, active repair time and logistic delay time that have influence on operational availability of logistics support system.

  • PDF

EXTENSION OF OPERATIONAL LIFE-TIME OF WWER-440/213 TYPE UNITS AT PAKS NUCLEAR POWER PLANT

  • Katona, Tamas Janos;Ratkai, Sandor
    • Nuclear Engineering and Technology
    • /
    • v.40 no.4
    • /
    • pp.269-276
    • /
    • 2008
  • Operational license of WWER-440/213 units at Paks NPP, Hungary is limited to the design lifetime of 30 years. Prolongation by additional 20 years of the operational lifetime is feasible. Moreover, enhancement of the reactor thermal power by 8% will increase both the net power output and the competitiveness of the plant. Paks NPP is a pioneer considering the power up-rate and preparation of long-term operation of WWER-440/213 design. Systematic preparatory work for long-term operation of Paks NPP has been started in 2000. A regulatory framework and a comprehensive engineering practice have been developed. According to the authors view, creation of a gapless engineering system via consequent application of best practices, and feed-back of experiences together with proper consideration of WWER-440/V213 features are the decisive elements of ensuring the safety of long-term operation. That systematic engineering approach is in the focus of recent paper. Key elements of justification and measures for ensuring the safety of long-term operation of Paks NPP WWER-440/213 units are identified and discussed. These are the assessment of plant condition and review of adequacy of ageing management programmes, also the review, validation and reconstitution of time limited ageing analyses as core tasks of licence renewal.

An Efficient Computational Method for Linear Time-invariant Systems via Legendre Wavelet (르장드르 웨이블릿을 이용한 선형 시불변 시스템의 효율적 수치 해석 방법)

  • Kim, Beomsoo
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.19 no.7
    • /
    • pp.577-582
    • /
    • 2013
  • In this paper Legendre wavelets are used to approximate the solutions of linear time-invariant system. The Legendre wavelet and its integral operational matrix are presented and an efficient algorithm to solve the Sylvester matrix equation is proposed. The algorithm is based on the decomposition of the Sylvester matrix equation and the preorder traversal algorithm. Using the special structure of the Legendre wavelet's integral operational matrix, the full order Sylvester matrix equation can be solved in terms of the solutions of pure algebraic matrix equations, which reduce the computation time remarkably. Finally a numerical example is illustrated to demonstrate the validity of the proposed algorithm.

New Approach to the Analysis of Linear Systems Via Local Rationalized Haar Transform (미소구간 유리하알변환에 의한 선형계의 해석을 위한 새로운 접근방법)

  • Kim, Jin-Tae;Ahn , Doo-Soo
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.51 no.6
    • /
    • pp.228-234
    • /
    • 2002
  • This paper proposes a real-time application of rationalized Haar transform which is based on the local rationalized Haar transform, local operational matrix and local delay operational matrix. This approach let a general sampling time be used by introducing a scaling factor. In the existing method of orthogonal functions, a major disadvantage is that process signals need to be recorded prior to obtaining their expansions. This paper proposes a novel method of rationalized Haar transform to overcome this shortcoming. And the proposed method is suitable for the analysis of linear systems. The proposed method is expected to the applicable to the adaptive control which demanded to the real-time applications.