References
- C. C. Sherbrooke, “METRIC : Multi-echelon Technique for Recoverable Item Control,” Operations Research, Vol. 16, No. 1, pp. 122-141, 1968. https://doi.org/10.1287/opre.16.1.122
- F. M. Slay, "VARI-METRIC : An Approach to Modeling Multi-Echelon Resupply When the Demand Process is Poisson with Gamma Prior," Report AF301-3, Logistic Management Institute, Washington D.C, Conference, 1980.
- R. J. Hillestad, "Dyna-METRIC : Dynamic Multi- Echelon Technique for Recoverable Item Control," R-2785-AF, Rand, Santa Monica, 1982.
- D. E. III. Stearns, "Logistics Simulations Metamodel For F404-GE-400 Engine Maintenance," Naval Postgraduate School, Monterey California, 1998.
- N. Tao and S. Wen, "Simulation of a Closed Loop Multi-Echelon Repairable Inventory System," International Conference on Management Science and Engineering, pp. 663-668, 2009.
- S. Lee, J. Bai and M. Kim, “The Impact of the Aircraft Spare Engine & the Module Inventory Level and Module Interchangeability on the Operational Availability,” Journal of the Korea Institute of Quality Management, Vol. 38, No. 3, pp. 333-339, 2010.
- J. Kim, S. Lee and S. Jung, “The Impact of Aircraft Spare Engine and Module Inventory Level in Wartime Operational Availability,” Korean Management Science Review, Vol. 31, No. 2, pp. 33-48, 2014. https://doi.org/10.7737/KMSR.2014.31.2.033
- W. D. Kelton, P. S. Randall and T. S. Daved, "Simulation with Arena, 4th Edition," McGraw Hill, New York, 2007.
- J. P. C. Kleijnen, “Regression Metamodels for Simulation with Common Random Numbers : Comparison of Validation Tests and Confidence Intervals,” Management Science, Vol. 38, No. 8, pp. 1164-1185, 1992. https://doi.org/10.1287/mnsc.38.8.1164
- F. S. Hillier and G. J. Lieberman, "Introduction to Operations Research, Eighth Edition," McGraw Hill, New York, pp. 478-546, 2005.