• Title/Summary/Keyword: operation results

Search Result 17,162, Processing Time 0.041 seconds

A Study on the Understanding in Results of Arithmetic Operation (연산 결과의 의미 이해에 관한 연구)

  • Roh, EunHwan;Kang, JeongGi;Jeong, SangTae
    • East Asian mathematical journal
    • /
    • v.31 no.2
    • /
    • pp.211-244
    • /
    • 2015
  • The arithmetic operation have double-sided character. One is calculation as a process, the other is understanding in results as an outcome of the operation. We harbored suspicion on students' misunderstanding in an outcome of the operation, because the curriculum has focused on the calculation, as a process of arithmetic operation. This study starts with the presentation of this problem, we tried to find the recognition ability and character in the arithmetic operation. We researched the recognition ability for 7th grade 27 students who have enough experience in arithmetic operation when studying in elementary school. And we had an interview with 3students individually, that has an error in understanding in results of arithmetic operation but has no error in calculation. We focused on 3students' detailed appearance of the ability to understand in results of arithmetic operation and analysed the changing appearance after recommending unit record using operation expression. As a result, we could find the abily to underatanding in results of arithmetic operation and applicability to recommend unit record using operation expression. Through these results, we suggested educational implications in understanding in results of arithmetic operation.

Anticorrosive Monitoring and Complex Diagnostics of Corrosion-Technical Condition of Main Oil Pipelines in Russia

  • Kosterina, M.;Artemeva, S.;Komarov, M.;Vjunitsky, I.;Pritula, V.
    • Corrosion Science and Technology
    • /
    • v.7 no.4
    • /
    • pp.208-211
    • /
    • 2008
  • Safety operation of main pipelines is primarily provided by anticorrosive monitoring. Anticorrosive monitoring of oil pipeline transportation objects is based on results of complex corrosion inspections, analysis of basic data including design data, definition of a corrosion residual rate and diagnostic of general equipment's technical condition. All the abovementioned arrangements are regulated by normative documents. For diagnostics of corrosion-technical condition of oil pipeline transportation objects one presently uses different methods such as in-line inspection using devices with ultrasonic, magnetic or another detector, acoustic-emission diagnostics, electrometric survey, general external corrosion diagnostics and cameral processing of obtained data. Results of a complex of diagnostics give a possibility: $\cdot$ to arrange a pipeline's sectors according to a degree of corrosion danger; $\cdot$ to check up true condition of pipeline's metal; $\cdot$ to estimate technical condition and working ability of a system of anticorrosive protection. However such a control of corrosion technical condition of a main pipeline creates the appearance of estimation of a true degree of protection of an object if values of protective potential with resistive component are taken into consideration only. So in addition to corrosive technical diagnostics one must define a true residual corrosion rate taking into account protective action of electrochemical protection and true protection of a pipeline one must at times. Realized anticorrosive monitoring enables to take a reasonable decision about further operation of objects according to objects' residual life, variation of operation parameters, repair and dismantlement of objects.

Study on the Preliminary Design of ARGO-M Operation System

  • Seo, Yoon-Kyung;Lim, Hyung-Chul;Rew, Dong-Young;Jo, Jung-Hyun;Park, Jong-Uk;Park, Eun-Seo;Park, Jang-Hyun
    • Journal of Astronomy and Space Sciences
    • /
    • v.27 no.4
    • /
    • pp.393-400
    • /
    • 2010
  • Korea Astronomy and Space Science Institute has been developing one mobile satellite laser ranging system named as accurate ranging system for geodetic observation-mobile (ARGO-M). Preliminary design of ARGO-M operation system (AOS) which is one of the ARGO-M subsystems was completed in 2009. Preliminary design results are applied to the following development phase by performing detailed design with analysis of pre-defined requirements and analysis of the derived specifications. This paper addresses the preliminary design of the whole AOS. The design results in operation and control part which is a key part in the operation system are described in detail. Analysis results of the interface between operation-supporting hardware and the control computer are summarized, which is necessary in defining the requirements for the operation-supporting hardware. Results of this study are expected to be used in the critical design phase to finalize the design process.

Evaluation of Effects of Real Joint-Operation of Multi-purpose Dams (다목적댐군의 실제 연계운영 효과 평가)

  • Kang, Min-Goo;Lee, Gwang-Man;Cha, Hyung-Sun
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.2 s.175
    • /
    • pp.101-112
    • /
    • 2007
  • In this study, a methodology was developed to evaluate the effects produced in the event of joint-operation of dams from the viewpoint of water use. It was applied to evaluating the actual results of dam operation in the Han River basin. In order to evaluate the effects of real joint-operation in terms of water supply and flow conditions, the methodology used the satisfaction rate of water requirement and the stability of flow conditions at the evaluation site as indicator. In order to evaluate the effects of joint-operation in terms of power generation, the total power generation produced by dams was used as evaluation indicator. Actual operation results were evaluated by comparison of evaluation indicators relating to single dam operation by which the notified mont of water was supplied, as well as to optimization models. Results of actual joint-operation of the Han River basin, from 2001 to 2004, were compared yearly with results from single operation and optimization model; in terms of water supply, the satisfaction ratio of water requirement stood at $94.36{\sim}99.68%$ for single operation, $97.16{\sim}99.90%$ for actual joint-operation, and 100.0 % for optimization model for all four years. The stability of flow condition was evaluated by the coefficient of river regime and coefficient of flow conditions definitely, indicating that flow conditions were more stable in case of actual operation and optimization models than in case of single operation. The actual total power generation was compared with that generated by other operation rules, indicating that the optimization model increased the power generation by $-3.47{\sim}6.54%$ compared with the actual total power generation, and that the single operation decreased the power generation amount by $12.68{\sim}38.94%$ compared with the actual total power generation.

Performance Simulation of Part Load Operation for 2MWe Circulating Fluidized Bed Boiler (2MWe 순환유동상 보일러의 부분 부하 운전 성능 모사)

  • Kim, Taehyun;Choi, Sangmin;Hyun, Ju-soo
    • 한국연소학회:학술대회논문집
    • /
    • 2012.04a
    • /
    • pp.35-36
    • /
    • 2012
  • Part load operation usually covers large periods of the total operation time on the economic ground and electricity demand in small-scale boilers. Performance analysis of part load behavior is very important for the purpose of boiler operation optimization. A simple thermal calculation approach is applied to predict performance of a pilot-scale circulating fluidized bed (CFB) boiler at part load operation. Verification has been carried out by comparing between calculation results an operation data of the boiler.

  • PDF

Radioactivity Calculation Considering Kori Unit 1 Operation History for the Defected Baffle Former Bolts (고리1호기 가동이력을 고려한 손상 배플포머볼트 방사화 계산)

  • Young Jae Maeng;Hyun Chul Lee;Myeong Ho Lee;Seong Sik Hwang;Seung Jin Oh;Yun Suk Jang
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.19 no.1
    • /
    • pp.20-26
    • /
    • 2023
  • The defected baffle former bolts of Kori unit 1 were withdrawn to analyze the cause of damage and gamma-ray measurement is being scheduled. Prior to that, in order to calculate the specific radioactivity value of the baffle former bolt, a radioactivity calculation method considering the actual operation history of the nuclear power plant is introduced and the calculation results are shown. In particular, the radioactivity calculation method considering the operation history is obtained by defining the monthly contribution factor from the actual monthly operation history. As a result, the results considering operation history are 16-28% lower than the general radioactivity calculation results. These results can contribute to establish a reasonable but economical strategy when planning nuclear power plant decommissioning.

Microgrid operating method in realtime pricing (실시간 전기요금제에서 마이크로그리드의 운용 방법)

  • Jyung, Tae-Young;Baek, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.12
    • /
    • pp.2165-2172
    • /
    • 2010
  • This paper presents the operation algorithm of microgrid on the Real Time Pricing(RTP) for building the smart grid. RTP is higher power price variability than flat rate and time of use. However it has an effect on peak clipping and peak load shifting due to the increased price on peak time power demand. When the RTP are applied to the microgrid system, the proposed algorithm is able to be effective and economic operation. The implemented system is operated for the economic operation in microgrid connected with the power system. On the other hand, when the microgrid is operated on isolation mode, it focus on the improvement of stability and the power supply reliability of the sensitive loads. The test system are implemented and calculated on various operation modes based on non-dispachable generator output and RTP data for validating the proposed operation algorithm. The calculated results are compared to the implemented results using real-time simulator. It can be confirmed that the proposed operation system are identical results to the calculated one. When the proposed operation algorithm is applied to the system, it can be show the effectiveness of the peak clipping and peak load shifting and the improvement of economic feasibility.

Using DEA to Analyze the Degree of Global Technology Cooperation at the National Level (DEA를 활용한 국가별 글로벌 기술협력 수준 분석 : OECD 국가를 중심으로)

  • Lee, Mingook;Lee, Sungjoo
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.41 no.2
    • /
    • pp.67-80
    • /
    • 2016
  • Under a rapidly changing environment, firms have attempted to co-operate with organizations that possess high technologies to improve their technical capabilities. Most countries have worked towards developing a suitable strategy for international technology co-operation based on the diagnostic results of their technological capabilities and indices. These diagnostic results indicate the level and degree of international technology co-operation that have been developed in academia. However, identifying the overall conditions of international technology co-operation based on existing indices is a difficult task. Hence, to address this problem, indices that can measure diverse perspectives of core technology co-operation activities need to be developed. This research aims to develop a framework for identifying the current state of international technology co-operation in diverse perspectives at the national level. We develop indices based on relevant literature and formulate an analytical framework for international technology co-operation in diverse perspectives using DEA analysis. The results are expected to contribute to effective technology planning at the national level by diagnosing capabilities for international technology co-operation from diverse perspectives.

Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( III ) - Multi Reservoir Operation Methods - (퍼지제어모형을 이용한 다목적댐의 홍수조절모형 (III) - 댐군의 연계운영방안 -)

  • Shim, Jae-Hyun;Kim, Ji-Tae;Cho, Won-Cheol;Kim, Jin-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.3 s.14
    • /
    • pp.61-72
    • /
    • 2004
  • In this research, multi reservoir operation methods for reservoirs in Han River are proposed based on the single dam operation models using fuzzy control techniques. The result of fuzzy controled single dam operation has shown that it can improve flood controllability at the downstream of dams. Among the many control rules of fuzzy operation, a rule that shows the most effective flood control rate at the downstream has been selected as Ike operation rule. The simulated results for 1990 and 1995 flood events are compared with historical ones. As the results, it is founded that suggested models can reduce the inundation of upstream and keep the water elevation lower at downstream, which make the proposed models as the effective methods in multi reservoir operation.

Concomitant or Delayed Intra-abdominal Operation in Immediate Breast Reconstruction with TRAM Flap (횡복직근피판술을 이용한 즉시 유방재건과 동시 혹은 후에 시행한 복강 내 수술)

  • Kim, Kyu-Nam;Lee, Taik-Jong
    • Archives of Plastic Surgery
    • /
    • v.37 no.1
    • /
    • pp.22-25
    • /
    • 2010
  • Purpose: As patients who take immediate breast reconstructions with TRAM flap have increased, concomitant or delayed other elective intra-abdominal operations in these patients also have increased. There are few reports of concomitant or delayed intra-abdominal operation in TRAM flap patients. We report our experiences and outcomes of these operations which is safe and feasible. Methods: We reviewed the charts and postoperative follow-up results of 11 patients among 471 consecutive patients who took immediate breast reconstruction with TRAM flap from December of 2002 to September of 2006. Four patients took concomitant intra-abdominal operation and 7 patients took delayed intra-abdominal operation between 1 to 52 months after TRAM flap Results: There were no significant postoperative abdominal and systemic complications. One patient who took concomitant intra-abdominal operation presented partial skin necrosis of abdomen, but recovered completely with conservative treatments. Two patients took transfusion in peri-operative periods. Conclusion: Concomitant or delayed intra-abdominal operation in immediate breast reconstruction with TRAM flap could be performed safely and feasibly when it is necessary. Furthermore, it could be helpful to patients and surgeons.