• Title/Summary/Keyword: operation reliability

Search Result 2,126, Processing Time 0.027 seconds

A Study on Power Supply Method Design for Hot Standby Sparing System via Reliability Modeling (신뢰도모델링에 의한 이중계제어기 전원공급방식 설계에 관한 연구)

  • Shin, Duck-O;Lee, Kang-Mi;Lee, Jae-Ho;Kim, Yong-Kyu
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.527-532
    • /
    • 2007
  • In this paper, we suggest those two design plans for power supply method of Hot Standby Sparing System; one is the plan using MTBF based on Constant Failure Rate, and the plan using Reliability Function is the other. Traditionally, RBD (Reliability Block Diagram) is used for reliability prediction which is required to meet any requirements before system operation. However, the system that has redundancy, such as Hot Standby Sparing System, Is not suitable for system reliability modeling using combination model, such as RBD. In this paper, therefore, we demonstrate that for redundancy controller, redundancy modeling design toward fault occurrence design is more effective to build up a system with higher reliability and achieve the effectiveness of loss cost due to maintenance and failure occurred in operation, rather than combinational modeling design.

Optimal Preventive Maintenance Period in Complex Systems in Considering Components Reliability Characteristic (하부 구성품의 신뢰도 특성을 고려한 복합 시스템의 최적 예방정비 주기 산출)

  • Lee, Youn-Ho;Lee, Ik-Do;Lee, Dong-Woo;Sohn, Ki-Hong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.37 no.4
    • /
    • pp.390-399
    • /
    • 2011
  • Generally the life-cycle cost of complex systems composed of several sub systems or equipments such as train, aircraft weapon systems is spent much more during operation and maintenance phase than development phase. The maintenance cost for maintaining the availability and extending the life span of systems comprise a large proportion of systems operation cost. The cycle of preventive maintenance affects operation and maintenance cost a lot. In this study we introduce a way minimizing life-cycle cost of systems by calculating more reliable preventive maintenance period than the results of previous study using systems reliability data considered the reliability and failure effect ratio of sub-systems or components. We can solve the preventive maintenance period problem known as NP-Hard as quick as possible by using modified genetic algorithm than using other models introduced in previous study.

A Study on the Development of FRACAS-based Failure Analysis Workflow for Military weapon system (FRACAS에 기반한 군 무기체계의 고장분석 워크플로우 구축에 대한 연구)

  • Lee, Min-Young;Kim, Wan-Gul;Kim, Kyung-Soo
    • Journal of Applied Reliability
    • /
    • v.10 no.2
    • /
    • pp.93-105
    • /
    • 2010
  • The following thesis provides an explanation for the definition of the MIL-HDBK-2155 : Failure Reporting, Analysis and Corrective Action System (FRACAS), which systemizes the collection and analysis of failure data and the feedback process of the results. It also presents a plan based on MIL-HDBK-2155 for the collection and analysis of operating specifications on weapon systems. The collection and analysis of failure data and the feedback process utilizing FRACAS contributes to identifying improvement requirements during equipment operation as well as finding and eliminating the root cause of the failures. The objective of applying FRACAS to weapon systems is to receive source data feedback for reliability enhancements and performance improvements during operation. This is done by recognizing weaknesses in the design or operation by identifying the type of failures that might occur, and by performing Failure Modes, Effects and Criticality Analysis(FMECA) and Failure Tree Analysis(FTA).

A Study of the Safety Facilities Operation Strategies for Performing Arts Workers Evacuation (공연종사자 피난을 위한 안전시설의 운영전략 연구)

  • Sung-Hak Chung;Yong-Gyu Park
    • Journal of the Korea Safety Management & Science
    • /
    • v.26 no.1
    • /
    • pp.63-74
    • /
    • 2024
  • The objectives of this study is to classify evacuation types, derive the characteristics of 4 types, develop and discover evacuation routes within the performance hall space, and present the statistical classification results of the evacuation classification model by classification type. To achieve this purpose, the characteristics of each evacuation type's four types are applied through a network reliability analysis method and utilized for institutional improvement and policy. This study applies for the building law, evacuation and relief safety standards when establishing a performance hall safety management plan, and reflects it in safety-related laws, safety standards, and policy systems. Statistical data by evacuation type were analyzed, and measurement characteristics were compared and analyzed by evacuation types. Evaluate the morphological similarity and reliability of evacuation types according to door width and passage length and propose the install position of evacuation guidance sign boards. The results of this study are expected to be used as basic data to provide operation strategies for safety facility evacuation information sign boards according to evacuation route classification types when taking a safety management plan. The operation strategy for the evacuation sign boards installation that integrates employee guidance and safety training is applied to the performance hall safety management plan. It will contribute to establishing an operational strategy for performance space safety when constructing performance facilities in the future.

Coping with Climage Change through Coordinated Operations of the Andong & Imha Dams (안동-임하댐 연계운영을 통한 미래 기후변화 대응)

  • Park, Junehyeong;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.12
    • /
    • pp.1141-1155
    • /
    • 2013
  • A number of studies have been performed to analyze climate change impacts of water resources system. In this study, a coordinated dam operation is compared with an existing operation strategy for coping with projected future runoff scenarios. GCMs (Global Circulation Models) and the LARS-WG downscaling method was used to project future climate scenarios. The water balance model called abcd was employed to estimate future runoff scenarios. The existing dam operation comes from the national dam construction guideline, which is called the "level-operation method." The alternative coordinated dam operation are constructed as a linear programming using New York City rule for refill and drawdown seasons. The results of annual total inflow in future is projected to decrease to 72.81% for Andong dam basin and 65.65% for Imha dam basin. As a result of applying future runoff scenarios into the dam operation model, the reliability of coordinated dam operation, 62.22%, is higher than the reliability of single dam operation, 46.55%. Especially, the difference gets larger as the reliability is low because of lack of water. Therefore, the coordinated operation in the Andong & Imha dams are identified as more appropriate alternative than the existing single operation to respond to water-level change caused by climate change.

Module UPS of multi-parallel operation for use in information & telecommunication systems (정보통신용 다병렬 운전의 모듈식 무정전전원장치)

  • Koo, Tae-Geun;Ryu, Ji-Su;Bae, Sang-Gyu;Park, Keun-Kap
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2007.08a
    • /
    • pp.390-393
    • /
    • 2007
  • The reliability as well as the power capability of the UPS system can be increased by replacing a single UPS unit with multiple small UPS units in parallel, resulting in a so-called module UPS. This module UPS system allows that a new module can be added or replaced while maintaining power to loads, which is a hot-swappable operation. In addition, it has desirable features such as ease of output power expandability, convenience of maintenance and repair, and high reliability. To realize the module UPS, load sharing without interconnection among parallel connecting modules as well as a small scale and lightweight topology is necessary. The frequency and voltage droop method is applied to parallel operation control to achieve load sharing. 5kVA modules are designed and implemented to confirm the effectiveness of the proposed approaches. Experimental results show that the module UPS system has a high power factor, a low distortion of output voltage and input current, hot-swappable operations and good load sharing characteristics.

  • PDF

The Impact of Failure Frequency Items on Availability and Operation Support Costs of Armored Vehicles (장갑차의 가용도와 운영유지비용에 미치는 고장 다빈도 품목의 영향성 분석)

  • Bong, Ju-Sung;Baek, Il-Ho;Kim, Min-Seop;Hur, Jang-Wook
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.20 no.4
    • /
    • pp.8-15
    • /
    • 2021
  • The effects on system availability, operation, and support costs were analyzed using the M&S system (MPS). The failure frequency items of current armored vehicles were identified and the MTBF of the identified items was improved. The results of this study suggest that when we reduce the frequency of failure, the availability increases, and the operation and support costs decrease. By improving the reliability of the failure frequency items, it becomes possible to upgrade or develop the weapons systems. Through this study, we confirmed that improving reliability will enhance combat readiness and reduce operation and support costs.

Operational Characteristics of the High-speed Interrupter for Reliability Enhancement of Power Supply and Demand (전력수급의 신뢰도 확보를 위한 고속 인터럽터 동작 특성)

  • Choi, Hye-Won;Choi, Hyo-Sang;Jung, Byung-Ik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.1
    • /
    • pp.143-148
    • /
    • 2013
  • When the fault occurs in power system, the fault-current exceeds breaking capacity of the circuit breaker. So, reliablity of the power system is decreased sharply. Superconducting fault-current limiter (SFCL) is operated without impedance in normal state. The fault-current is limited by its impedance during the fault condition. However, the SFCL has several weak points such as huge size, high-price, liquid-nitrogen operation for the real power system. In this paper, We suggested the high-speed interrupter to limit the fault-current in case of the single line-to-ground fault. In addition, we compared the high-speed interrupter with the SFCL to ensure the operation reliability. The proposed interrupter detected the fault-current through the CT, and the power was supplied by operation of the SCR control system. In this experiment, the power of high-speed interrupter was applied after the 4.8[msec] from fault instant. The on-off operation of the interrupter was started after half-cycle from the fault. The fault-current was flowed into the impedance element by the switching operation of the high-speed interrupter. So, the fault current was limited within one cycle, and then it didnt exceed the capacity of a circuit breaker. We confirmed that there was slight difference between the SFCL with high-speed interrupter in terms of limiting-time of the fault-current and switching speed of the SCR. The high-speed interrupter was considered to be more efficient than the SFCL in size, cost or reliability.

A Study on the Reliability Evaluation of a Transmission System

  • Seungpil Moon;Jinboo Choo;Kim, Kyeongho;Donghoon Jeon;Park, Jaeseok
    • KIEE International Transactions on Power Engineering
    • /
    • v.3A no.3
    • /
    • pp.119-123
    • /
    • 2003
  • Successful operation of power systems under the deregulated electricity market depends on the management of the transmission system reliability. Quantitative evaluation of the transmission system reliability is an important issue. Particularly, the nodal reliability indices can be of value in the management and control of congestion and reliability of the transmission system under the deregulated electricity market. In this study, a method developed for the reliability evaluation of the transmission system is presented. The Monte Carlo methods are used because of their flexibility when complex operating conditions are being considered. The usefulness and effectiveness of the proposed method are illustrated by a case study with the KEPCO system.

Dominant failure modes identification and structural system reliability analysis for a long-span arch bridge

  • Gao, Xin;Li, Shunlong
    • Structural Engineering and Mechanics
    • /
    • v.63 no.6
    • /
    • pp.799-808
    • /
    • 2017
  • Failure of a redundant long-span bridge is often described by innumerable failure modes, which make the structural system reliability analysis become a computationally intractable work. In this paper, an innovative procedure is proposed to efficiently identify the dominant failure modes and quantify the structural reliability for a long-span bridge system. The procedure is programmed by ANSYS and MATLAB. Considering the correlation between failure paths, a new branch and bound operation criteria is applied to the traditional stage critical strength branch and bound algorithm. Computational effort can be saved by ignoring the redundant failure paths as early as possible. The reliability of dominant failure mode is computed by FORM, since the limit state function of failure mode can be expressed by the final stage critical strength. PNET method and FORM for system are suggested to be the suitable calculation method for the bridge system reliability. By applying the procedure to a CFST arch bridge, the proposed method is demonstrated suitable to the system reliability analysis for long-span bridge structure.