Today, many companies will be isolated in competition if they do not have competitive power to overcome quick change and big crisis of market. Nowadays, globally high-grade companies have done their best for increasing their competitive power through a many kinds of methods in keen competition for making of pacesetting position. This study focuses on distribution with the domains like capacity, layout, amount of location, assignment of product, operation procedure and operation rule in order to improve these domains, we make a further application of eight analysis ways based on DMAIC method for improving operation of processes of distribution center as the third profit source. The purpose of this study is to seek an approach that can easily adopt of Lean Six Sigma in operational management of distribution center by a kind of data, analysis method and template.
International conference on construction engineering and project management
/
2009.05a
/
pp.1053-1059
/
2009
Construction system modeling can enhance work performance by following the behaviors of a system. System behaviors may originate from physical aspects of a system, namely operation level variables, or from non-physical aspects of a system known as context level variables. However, construction system modelers usually focus on only one type of system variable (i.e., operation level or context level) which can lead to less accurate results. Hybrid modeling with System Dynamics (SD) and Discrete Event Simulation (DES) is one of the approaches that has been utilized to address this issue. In this research, an SD-DES hybrid model of a steel fabrication shop is developed, and the benefits of capturing context level variables together with operation level variables in the model are discussed.
This paper suggests the design and operation of value stream mapping(VSM) applied to project management, such as R&D, IT Investment. First this study represents design methodology of VSM process using SIPOC(Supplier, Input, Process, Output, Costumer). Second, this paper considers the identification and improvement plan about non-added value time for VSM using FPC(Flow Process Chart) and PERT/CPM. Last, this paper proposes VSM scheduling method using PERT/CPM and CCPM(Critical Chain Project Management)
The Journal of the Convergence on Culture Technology
/
v.6
no.4
/
pp.95-101
/
2020
This study aims to investigate the current status of the operation system of the curriculum support extra-curricular program, focusing on the extra-curricular program operation system of other universities, and suggest the desirable operation system and performance management plan of the extra-curricular program in cultural education. To this end, the analysis of the extra-curricular program operation system of eight four-year universities in the Seoul metropolitan area was conducted on the existence of core competencies, computer systems and extra curricula program guides, credit-linked and mileage scholarship programs, and the analysis focused on the characteristics, merits and demerits of each university's operating system. It was also intended to propose the desirable operation system and performance management plan of the extra curricula program in liberal arts education, focusing on the operation system of the extra curricula program of E University and the corresponding performance management. Conclusion To operate the extra curricula program efficiently, the computer system and the extra curricula program guide, credit link and mileage scholarship system should be introduced. In addition, the analysis of the operation system of the curriculum support program of E University shows that E University operates systematically with the direction of operation of the core competency-based curriculum support extra-curricular program, and the performance management of the extra curricula program of E University is carried out through the EU-TQM System Integrated Management System.
From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.
The Journal of Sustainable Design and Educational Environment Research
/
v.19
no.4
/
pp.50-59
/
2020
Integrated operation schools were introduced to Korea in 1998 with an operation of eight schools, and their number has now increased to 106 and is still growing. Although various problems have been pointed out in research on integrated operation schools over the past two decades, these have not been reflected today. Therefore, the purpose of this study was to comprehensively summarize the concepts, backgrounds, recent status, types, etc. of the integrated operation school and to present its problems in terms of curriculum, teacher management, student management, operation and management of educational facilities, and law and policy through literature review and to propose measures for improvement. This allowed us to compare the concerns of the integrated operation school with the results of the actual research and organize improvement measures.
Park, Seong-cheol;Ha, Ju-wan;Kim, Hwan-yong;Song, Young-hak
Journal of Korean Institute of Architectural Sustainable Environment and Building Systems
/
v.12
no.6
/
pp.669-679
/
2018
Energy consumption savings in buildings should be reviewed in diverse areas such as air conditioning system and lighting responsible for cooling and heating, and energy management systems such as BAS (Building Automation System) and BEMS (Building Energy Management System) are introduced to improve energy consumption efficiency and to promote economic control of related facilities by integrated management of energy generated and consumption in buildings. The measured building of this study uses regenerative geothermal system. Measured values of heat pump and system COP were 4.7 and 4.2 respectively, and they were found to be higher 11.9% and 23.5% than rated values. As a result of analyzing the air conditioning and lighting energy from the first floor to the fourth floor performing the air conditioning, the second and third floors, which have a high frequency of use, are compared with the first and fourth floors 50% higher energy consumption ratio. On the other hand, the general heat storage system uses the nighttime power of the previous day to store heat and use it the next day. The total number of days of abnormal operation during the summer season is 61 days. The electricity cost corresponding to the abnormal operation is 1,840,641 KRW, and the normal operation using the nighttime power is 1,363,561 KRW, which is difference of 477,080 KRW, 35% increase in cost. We will utilize it as the main data of BEMS through analysis of winter operation characteristics as well as summer operation characteristics.
By the newly emerging network access technology, we face the new heterogeneous network environment. Focusing on the co-existence of multiple access network technology and the complex service needs of users, the wireless service operators should present the stable service quality for every user. For this, the service operators should build the new operation framework which combine the pre-established network and newly adopted one. Our problem is finding the optimal heterogeneous network operation framework. We suggest market-based marginal cost function for evaluating the relative value of resource of each network and develop the whole new heterogeneous network operation framework. To test the applicability of developed operation framework, we build large-scale JAVA simulator. By this development, we can easily test the new network environment in practical engineering field.
Sang-Hyeok Kang;Kyeong-Geun Baik;Hyun-Gi Baek;Hyeong-Gi Park;Jong-Won Seo
International conference on construction engineering and project management
/
2009.05a
/
pp.1134-1139
/
2009
Haul routes for earthmoving operation need to be carefully selected because the decision on the haul routes could make a significant difference in the project's cost and time. This paper proposes a decision support system for improving productivity of earthmoving operation that helps construction managers choose the best haul routes of trucks based on time slots. Also, a methodology for optimal selection of haul routes considering traffic conditions and topographic conditions of the routes is explained. Raster data model is used to find an available shortest path based on cost weighted distance. A system was developed on a geographic information system environment for efficient database management and easy manipulation of graphical data. A real-world case study was conducted to verify the applicability of the proposed system.
The artillery is a key element of the ground forces operation during wartime, and the military engineers support the artillery position development operation to support the smooth operation of the artillery. In establishing the artillery position development operation plan, the commander requires more than his intuition to find the best option reflecting a number of elements of the battlefield situation which changes every minute. Moreover, the number of available equipment is smaller than the number of required position developments, and the effective equipment operation becomes essential element of this issue. This study quantified the capability of the available engineering equipment, organized a number of teams enabling equipment to put out the maximum capacity based on the quantified figures, and formed the model which allocates the team to the developing points to minimize the developing time. The goal programming method was applied to resolve the problem. The developed model was applied to compare the total mission duration following the number of teams, the variable for commander's decision, and the result of this study can be used as the quantitative data for commander's decision making process in establishing the artillery position development support operation through effective equipment management.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.