• Title/Summary/Keyword: on-site quality management

Search Result 660, Processing Time 0.028 seconds

Automation of Sampling for Public Survey Performance Assessment (공공측량 성과심사 표본추출 자동화 가능성 분석)

  • Choi, Hyun;Jin, Cheol;Lee, Jung Il;Kim, Gi Hong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.1
    • /
    • pp.95-100
    • /
    • 2024
  • The public survey performance review conducted by the Spatial Information Quality Management Institute is conducted at the screening rate in accordance with the regulations, and the examiner directly judges the overall trend of the submitted performance based on the extracted sample. However, the evaluation of the Ministry of Land, Infrastructure and Transport, the evaluation trustee shall be specified by random extraction (Random Collection) is specified by the sample. In this study, it analyzed the details of the actual site and analyzed through securing actual performance review data. In addition, we analyzed considerations according to various field conditions and studied ways to apply the public survey performance review sampling algorithm. Therefore, detailed sampling criteria analysis by performance reviewers is necessary. A relative comparison was made feasible by comparing the data for which the real performance evaluation was performed with the outcomes of the Python automation program. This automation program is expected to be employed as a foundation program for the automated application of public survey performance evaluation sampling in the future.

Priority Assessment of Leachate Management of Reclaimed Mine Waste Dump Sites (광산폐기물 적치장 침출수의 사후관리 우선순위 평가)

  • Park, Chang Koo;Yoon, Kyung Wook;Kim, Jung Wook;Jung, Myung Chae;Lee, Jin Soo;Ji, Won Hyun;Lee, Joon Hak
    • Economic and Environmental Geology
    • /
    • v.53 no.6
    • /
    • pp.771-779
    • /
    • 2020
  • This study was performed to develop a priority list for post-managements of leachates from 64 mine waste dump sites in Korea. For this, leachate quality, leachate quantity, and other factors were considered as evaluation criteria and the weights of 10 subfactors were calculated using Analytic Hierarchical Process (AHP) based on a survey from 20 experts in the field of mining environment. Calculated weights were 0.769, 0.147 and 0.084 for leachate quality, leachate quantity, and others, respectively, indicating that experts consider leachate quality as most important. Based on this approach, we classified the 64 mine waste dump sites into five grades from Grade I to Grade V. Ten were classified as Grade I, 1 as Grade II, 1 as Grade III, 33 as Grade IV, and 19 as Grade V.

Removal and Release Velocities of Nutrients by Submerged Plants in Flood Control Reservoirs around Juam Lake (주암호 홍수조절용지내 침수 식물체의 영양염류 제거속도 및 용출속도)

  • Han, Jong-Hak;Seo, Dong-Cheol;Kim, Sang-Don;Kang, Se-Won;Lim, Byung-Jin;Park, Jong-Hwan;Kim, Kap-Soon;Lee, Jun-Bae;Kim, Hyun-Ook;Heo, Jong-Soo;Cho, Ju-Sik
    • Korean Journal of Environmental Agriculture
    • /
    • v.30 no.2
    • /
    • pp.144-152
    • /
    • 2011
  • BACKGROUND: Eutrophication occurs occasionally in flood control reservoirs around Juam lake in summer and early autumn. Lakeside macrophyte which is one of internal pollutants effects on water quality when it is submerged during water surface is rising after rainy season. METHODS AND RESULTS: To improve water the quality of water from water supply source and to establish the management plan of submerged plants in flood control reservoirs around Juam Lake, the removal and release velocities of nutrients by submerged plants in site 1 and 2 were investigated. Removal or release velocity constant (K) of COD by Carex dimorpholepis Steud in column was 0.07~0.18 $day^{-1}$ at 0~4 days after flooding, -0.23~-0.17 $day^{-1}$ at 5~19 days after flooding and -0.28~0.03 $day^{-1}$ at 20~33 days after flooding. Removal or release velocity constant (K) of T-N by Carex dimorpholepis Steud was 0.02 $day^{-1}$ at 0~4(8) days after flooding, -0.13~-0.10 $day^{-1}$ at 5(9)~33 days after flooding in column. Removal or release velocity constant (K) of T-P by Carex dimorpholepis Steud was 0.05~0.06 $day^{-1}$ at 0~4 days after flooding, -0.14~-0.09 $day^{-1}$ at 5~33 days after flooding. Release velocity constant (K) of nutrients by Miscanthus sacchariflorus Benth was lower than that by Carex dimorpholepis Steud. In site 1, the amount of nutrients release by Carex dimorpholepis Steud was 6,719 kg/month/area for COD, 2,397 kg/month/area for T-N and 466 kg/month/area for T-P. The amounts of nutrients release by Carex dimorpholepis Steud were higher than those by Miscanthus sacchariflorus Benth in both sites. CONCLUSION(s): The results of this study suggest that COD, T-N and T-P in water quality of Juam lake were strongly influenced by submerged plants in flood control reservoirs.

Preliminary Study of Modulization Construction Method on Concrete Structure for High-rise Building (고층 콘크리트 구조물 모듈화 시공 시스템 기초연구)

  • Koh, Min-Hyeok;Cho, Chang-Yeon;Shin, Tae-Hong;Kwon, Soon-Wook;Kim, Yea-Sang;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.334-339
    • /
    • 2008
  • Construction that over 70% of the structure consists of concrete gets bigger and higher gradually and the demand of that is increasing as well. However, it's not easy to supply young and skilled persons on construction site because of social avoidance phenomena about 3D occupation, so it causes serious problems like aging and shortage of technicians. To solve the problems, executives related to the construction field make a management effort in various ways such as construction period shortening, labor productivity improvement and good quality but recently, they have an increasing interest in the necessity of the modularization of the high-rise building and the automation of the engineering development for the strengthening of international competitive power as more active and long-term alternatives. Therefore, this study is to propose the roadmap in order to make lots of efforts in developing construction technologies of high-rise buildings by performing a foundation study, the strategy for 4-step research development, on modularized construction system of concrete structure of high-rise buildings through domestic and foreign preceding research analyses associated with optimal design modularization technique, module factory automation and assembly automation of modularized objects.

  • PDF

Automatic Algorithms of Rebar Quantity Take-Off of Green Frame by Composite Precast Concrete Members (합성 PC부재에 의한 그린 프레임의 철근물량 산출 자동화 알고리즘)

  • Lee, Sung-Ho;Kim, Seon-Hyung;Lee, Goon-Jae;Kim, Sun-Kuk;Joo, Jin-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.118-128
    • /
    • 2012
  • As the bearing wall structure, which has been widely applied to domestic apartment buildings since the 1980s, cause many problems during remodeling of buildings, the government encourages constructors to adopt flat plate or rahmen structure through legal incentives. In line with such a trend, the green frame, an eco-friendly rahmen structure that has removed the shortcomings of previous structures, was developed to enhance structural safety, constructability, and eco-friendliness. The construction of green frame can reduce the labor cost and facilitate the composition of iron bars to reduce rebar loss through calculating the quality and establishing the bar bending schedule automatically on the precast concrete member data collected over the design phase. Therefore, the purpose of this study is to develop the algorithm to automate the calculation of iron bar volume for the green frame designed on composite precast concrete members. Automated algorithm to calculate concrete structural design information and design information. Practices through the application site should prove efficacy. The database established by the developed algorithm will automate the establishment of iron bar processing map and bar cutting list and the calculation of optimal composition and order volume to minimize the rebar loss. This will also reduce the expenses on management staff and overall construction cost through the minimization of rebar loss.

Development of Metric-Based Two-Tier Work Force Strategy (성과극대화를 위한 기능인력의 육성 및 활용전략)

  • Chang Soon-Woong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-81
    • /
    • 2003
  • The construction industry has been experiencing a major challenge in its work force, 'the shortage of skilled craft workers.' This problem has been caused by several factors such as the poor image of the construction industry, lack of training and education, unclear career path, declining wages, and changing work force demographics. A 'step-change' approach called the 'Two-Tier Work Force Strategy' has been proposed by the Center for Construction Industry Studies (CCIS) to deal with the work force related issues in a radical way. It is composed of two separate strategies, Tier I and II. The Tier I strategy uses less skilled and task trained craft workers, and has a larger administrative site management team than the Tier II strategy. The Tier II strategy utilizes fewer, better-educated, and higher skilled workers who perform some lower-management functions in addition to craft functions. They are paid more, but produce more through higher skills, stay on the job longer through multi-skilling, and deliver improved project performance in safety, quality, schedule, and cost The Two-Tier Work Force Strategy has the potential to resolve the current work force problems and foster a better work force environment in the future.

  • PDF

Above-and Belowground Biomass and Net Primary Production for Pinus densiflora Stands of Cheongyang and Boryeong Regions in Chungnam (충남 청양, 보령지역 소나무림의 지상부와 지하부 바이오매스 및 순생산량에 관한 연구)

  • Seo, Yeon-Ok;Lee, Young-Jin;Pyo, Jung-Kee;Kim, Rae-Hyun;Son, Yeong-Mo;Lee, Kyeong-Hak
    • Journal of Korean Society of Forest Science
    • /
    • v.99 no.6
    • /
    • pp.914-921
    • /
    • 2010
  • This study analyzed the above-and belowground biomass, net primary production, stem density, and biomass expansion factors for Pinus densiflora stands of Cheongyang and Boryeong regions in Chungnam. The total dry weights in Cheongyang and Boryeong regions were 122.36 kg/tree and 137.68 kg/tree while the aboveground biomass for these two regions were 72.23 Mg/ha and 143.27 Mg/ha, respectively. Total(above-and belowground) biomass were 91.77 Mg/ha and 178.98 Mg/ha, respectively. Net primary production of above-and belowground biomass in Cheongyang and Boryeong regions were 8.69 Mg/ha, 10.03 Mg/ha, 16.00 Mg/ha and 18.66 Mg/ha, respectively. Stem density (g/$cm^3$) was 0.457 and 0.421 while the above and total biomass expansion factors were 1.394~1.662 and 1.324~1.639, respectively. These results suggested that stand density and site quality could be influenced on the biomass and net primary production of the two regions. In addition, the results of this study could be very useful to calculate carbon sequestrations by applying stem density values and biomass expansion factors for Pinus densiflora in these two regions.

Proposal of Equations related to Settlement and Lateral Movement According to Embankment on Marine Sedimentary Ground (해성퇴적지반에서 성토로 인한 침하량과 측방유동량 산정식 제안)

  • Kim, Kyeong-Su;Chung, Dae-Seouk;Lee, Jong-Gil
    • The Journal of Engineering Geology
    • /
    • v.20 no.2
    • /
    • pp.191-202
    • /
    • 2010
  • In this study, the relationship between the settlements and the horizontal displacements according to embankment was analyzed at the marine sedimentary grounds for preparation of a site, and then the empirical equations of both the settlement and the horizontal displacement considering the embankment load and the thickness were proposed. To do this, the field and laboratory tests were performed at the improvement section where the pre-loading method was applied, and the field monitoring was performed using various sensors. Based on the results of the tests and monitoring, the ground deposits, soil characteristics and engineering properties were analyzed and the settlements and lateral movements were estimated by the Regression analysis. The ground deposits from the ground surface were composed of reclaimed soils, sedimentary soils and based rocks. The thickness of clay in the sedimentary soils layer was ranged from 3.9 m to 44.5 m. The embankment heights to improve the ground during pre-loading were constructed from 4.7 m to 7.8 m in each section. The settlements during embankment were ranged from 0.959 m to 2.217 m and the lateral movements were ranged from 0.048 m to 0.313 m. As the result of regression analysis, the equations of settlements and horizontal displacements according to embankments may be proposed as $s=0.02h^2+0.11h$ and ${\delta}=0.01e^{0.37h}$, respectively. The proposed empirical equations of the settlements and the horizontal displacements according to embankment on the marine sedimentary ground may be applied to the site where has a similar condition of study area.

Development of Integrated Wireless Sensor Network Device with Mold for Measurement of Concrete Temperature (콘크리트 온도 측정을 위한 거푸집 일체형 무선센서네트워크 장치 개발)

  • Lee, Sung Bok;Park, Seong Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.5
    • /
    • pp.129-136
    • /
    • 2012
  • Temperature of fresh concrete can be effectively used to predict the strength of concrete being cured and make an informed decision for stripping the molds. A hygrothermograph and thermo-couple sensors that require an extensive wiring have been applied to measure a temperature of concrete at the early stage of the curing process on site. However, these methods have limits to provide the temperature data in real time due to harsh working environment including frequent cutting of wires. Therefore, this study is aiming at developing a device based on wireless sensor network to measure the temperature of concrete being cured in formwork. The result showed that the wireless sensor with probe type thermistor which is developed had the same temperature data compared to the existed wire type thermistor, and we confirmed the temperature history of concrete in real time for 28 days throughout the gateway by wireless network that collects the temperature data measured from specimens in laboratory. Also, the network device for transmission can be easily separated from the probe sensor part and reused consistently. If the wireless sensor network device developed uses in the field, the temperature management of concrete will be systematically conducted from at the early stage of the curing, and especially be effective for cold weather concrete construction. In addition, it will contribute to the establishment of advanced quality control system for concrete and productivity of supervisors on site will be increased in the future.

A Review of a System for Improving the Reliability of Domestic Measurement Results regarding the Work Environment (국내 작업환경 측정결과 신뢰성 향상을 위한 제도 고찰)

  • Kim, Ki-Youn;Kang, Taesun;Lee, Seung Gil;Park, Hae Dong;Jeong, Jee Yeon
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.27 no.2
    • /
    • pp.87-96
    • /
    • 2017
  • Objectives: Improvement of the reliability of work environment measurement results is one of the principal subjects to be resolved in the field of industrial hygiene. Thus, this study was conducted in order to review domestic programs for enhancing the reliability of work environment measurement results and propose a more efficient management plan for workplace monitoring. Materials and Methods: The current domestic programs reviewed in this study are the quality control system and evaluation system for industrial hygiene laboratories, the reliability system accompanied by KOSHA (the Korea Occupational Safety and Health Agency), the system of permissible exposure limits and observed inspection system for permissible exposure limits. Their contents and data were analyzed by reviewing articles, reports, and guidelines related to reliability improvement for work environment measurement results. Results: As a result of the literature review, all the domestic programs investigated in this study had both merits and demerits in terms of considering the reliability of work environment measurement results. In particular, the fact that preliminary notification is provided to the head of a workplace before implementation would be an obstacle for elevating the reliability of work environment measurement results. Conclusions: Based on the review results obtained from this study, it is proposed that on-site measurement without preliminary notification should be considered for a more efficient inspection system that would enhance the reliability of workplace monitoring.