Proceedings of the Safety Management and Science Conference
/
2011.04a
/
pp.143-151
/
2011
Reviews indicated that supervisory feedback provided to workers is the most effective intervention to change performance in organizational settings. However, supervisors themselves hardly receive feedback on their own behaviors. This study implemented self-management technique to improve supervisory behaviors at a construction site. Self-management in the current study consisted of goal setting, self-monitoring and providing reinforcers for two supervisory behaviors; (1) conducting safety observations and (2) interacting with workers for safety improvement. Two supervisors severed as participants. An AB within-group design was adopted. After baseline (A), self-management technique was implemented (B). Results suggested that self-management was effective in increasing the two supervisory behaviors. Moreover, the increased supervisory behaviors were associated with improvement in workers' safety performance.
Korean Journal of Construction Engineering and Management
/
v.19
no.6
/
pp.79-85
/
2018
The government and of the Safety and Health Corporation have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce accidents on the construction site. However, the number of disasters on the construction site is increasing every year, Which accounts for more than 80% of the total number of casualties. It is necessary to investigate the implementation status of safety and health management in the field of small-size construction site, and to provide the appropriate technical guidance plan to the relevant work places. Also, it is necessary to reduce the disaster at the small-size construction site, The purpose of this study is Improvement Plan to Enhancing the Effectiveness of Technical Guidance Project for Safety Control of Small Construction Site.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.89-94
/
2004
Many innovative management processes, which are also termed as best practices or value improving practice, have been proven to successfully improve the value of capital facility projects. With a lack of any guidance on how to implement the most suitable value management process for a particular project, the objective of this paper is to facilitate the VMP implementation. A CII (Construction Industry Institute)'s recent study, titled as 'Development of the Value Management Toolkit,' encompasses a comprehensive structure of value management and provides a new methodology in optimizing the implementation of the value management processes in order to leverage the unique project circumstances, such as project objectives, resource availability, and site limitations, etc. As a pioneering study, the findings contribute to the expedition of implementing value management processes in the industry and maximize the potential benefits in applying the most benefiical value management process for a particular capital facility project.
Journal of the Korean Society of Environmental Restoration Technology
/
v.27
no.2
/
pp.17-28
/
2024
In order to achieve the management goals (30by30) mandated by the Kunming-Montreal Global Biodiversity Framework, this study established the site-level assessment criteria for OECMs, tailored to domestic circumstances using the Delphi analysis. Subsequently, a site-level assessment was conducted on the National Gariwangsan Natural Recreation Forest. As a result of the study, the initial step involved presenting criteria for the site-level assessment of OECMs, with 'consent for the assessment and recognition of OECM by competent and management authority' proposed as a prerequisite. Subsequently, seven evaluation criteria were established, including 'other than a legally protected area', 'spatially separated area with defined boundaries', 'effective in-situ conservation of biodiversity', 'sustainable management based on the competent and management authority', 'long-term sustainability of conservation outcomes', and 'provision of ecosystem services'. The results of applying site-level assessment criteria to the National Gariwangsan Natural Recreation Forest indicate that six criteria were met, while one criterion (sustainable management based on the competent and management authority) requires further improvement. Specifically, the key competent and management authorities for the National Gariwangsan Natural Recreation Forest are the Korea Forest Service and the National Natural Recreation Forest Management Office, with competent and management organizations established. However, the management focus is primarily on providing forest recreation services centered on users and facilities, making it difficult to confirm the long-term biodiversity conservation plans and implementation by the competent and management authorities. Therefore, it is deemed necessary to improve the long-term biodiversity conservation plans and implementation for the recognition of the National Gariwangsan Natural Recreation Forest as an OECM.
Proceedings of the Korea Water Resources Association Conference
/
2015.05a
/
pp.244-244
/
2015
Managed Aquifer Recharge (MAR) in the form of Aquifer Storage and Recovery (ASR) systems are being applied for numerous water augmentation projects both in developed and developing countries. Given the onset of Climate Change and its influence on weather patterns and land use, it has been acknowledged the utilization of this technology will be ever increasing. This technique like all others does have its drawbacks or disadvantages, whereby to overcome these drawbacks or disadvantages it is recommended that logical planning process be followed. In this study, we developed a decision framework known as "Decision framework for the planning, designing, construction/testing and implementation of subsurface water storage system" to further standardize the planning and design process of subsurface water storage system to increase the probability of having a successful ASR/ASTR project. The formulation of this framework was based on earlier frameworks, guidelines, published papers and technical reports which were compiled into a data collection database. The database of which consider both qualitative and quantitative aspect for example recharge objectives, site location, water chemistry of the native, source and recovered water, aquifer characteristics(hydraulic conductivity, transmissivity, porosity), injection/pumping rate, ecological constraints, societal restrictions, regulatory restrictions etc. The assimilation of these factors into a singular framework will benefit the broad spectrum of stakeholder as it maps the chronological order under which ASR project should be undertaken highlighting at each stage the feasibility of the project. The final stage of which should result in fully operational ASR system. The framework was applied to two case studies and through the application of a modified ASR site selection suitability index (Brown et al., 2005) a score was derived to identify the performance of each site. A high score of which meant a maximize chance of success given the reduce presence of project constraints.
International journal of advanced smart convergence
/
v.6
no.2
/
pp.51-58
/
2017
Recently, rapid advances of Ethernet and IP technology have brought many changes in the sound industry. In addition, due to AoIP-based audio transmission technology, various problems of the acoustic system (sound quality deterioration due to long distance transmission, complicated wiring) have improved dramatically. However, when many distributed audio systems are connected with AoIP equipment, if there is a problem in the equipment, it is impossible to operate the connected system. AoIP equipment only can transmit audio signals but cannot adjust the system for acoustic environment. In this paper, AoIP equipment is to be installed with sound equipment on a one-to-one basis, so that various existing problems can be solved and adjustment of sound quality (reverberation, echo, delay and EQ) can be possible by AoIP-based OAC (On-site Audio Center) with built-in DSP function. As a result, uncompressed real-time transmission by distributed transmission/receipt module in OAC (On-site Audio Center) and high quality sound by adjustment of sound quality with built-in DSP can be acquired. It is expected that OAC based sound system will be the industry standard in ubiquitous environment.
Kang, Sung Won;Lee, Ki Seok;Yoo, Wi Sung;Shin, Yoon-Seok
Proceedings of the Korean Institute of Building Construction Conference
/
2021.05a
/
pp.247-248
/
2021
Recently, the government is pursuing to reduce the serious accidents in most industries, including the construction industry, by enacting laws on punishment. The accident rate tends to be depended on the size and type of construction sites, and the accidents occur frequently due to inadequate implementation of safety management system and management standards, especially, in small and medium-sized sites. This study has performed the profiling of 265,000 accident cases on construction sites by attribute analysis such as the ratio of days lost to work, and pattern of days lost to work compared to the size of the construction. It turned out that the proportion of accident cases was high mainly in small-scale construction sites, and long-term labor losses occurred. Shortly, it is necessary to establish an institutional standard for applying a realistic safety management cost calculation and management system centered on small-scale sites. Therefore, this study is expected to be used as fundamental data or guideline for developing a customized safety management and accident prevention system for a worker reflecting the conditions of a construction site in the future.
International conference on construction engineering and project management
/
2024.07a
/
pp.909-916
/
2024
The emergence of Building Information Modelling (BIM), reality data, Virtual Reality (VR), and Augmented Reality (AR) has significantly enhanced the collaboration between stakeholders in construction management. The utilization of VR/AR devices holds considerable potential for monitoring safety in complex and constrained working environments on the construction site. On the other hand, near-miss incidents remain an important early sign of struck-by accidents. However, research on early warning and prevention methods for this risk is still limited. This paper, therefore, presents a framework for on-site and off-site collaborative safety monitoring framework using augmented and virtual reality for near-miss incidents. In the proposed framework, three phases to develop a VR/AR-based safety monitoring system include (1) construction safety simulation environment, (2) localization-based interaction system, and (3) safety monitoring system. The system can undertake the processing of data and enables communication among disparate VR/AR devices. VR clients are observational tools and offer guidance, while the AR client stays onsite for construction tasks. All clients connect to a processing computer, which also works as a host. The system embedded in the AR device can trigger an alarm or receive signals from the VR client when a near-miss issue happens. Additionally, all device clients possess the capability to share data acquired from onsite monitoring cameras, thereby fostering effective discussions and decision-making. The efficacy of this cross-platform system has been validated through the implementation of an outdoor coordination case study.
Recently, roost of the companies have, utilized internet with the purpose of business. According to this tendency, each company is exchanging various information and offering services of e-business through Web-Site. Contents on Web-Site are getting huge and the period of contents renewal is getting short. Consequently, each company is faced with many problems for the contents management because of specialization and fractionation of contents. A contents management system that creates, maintains and manages efficiently and conveniently contents on Web-Site toward solving these problems is very required. in this paper, we design and implement such a web contents management system. It also supports dynamic web page publication based on the XML components.
현재 국내외의 많은 기업들이 고객과의 효율적인 커뮤니케이션을 위해 IMC 전략을 수립하고 있으며, 최근에는 인터넷 기술과 합쳐져 IMC 전략의 효율성 증대에 많은 변화를 가져오고 있다. 본 연구에서는 국내 주택시장에서 두산건설과 인터넷 패션전문업체인 웹넷코리아가 공동으로 We've 아파트 분양과정에서 시행된 on-line과 off-line 판매촉진의 통합적 활용과정과 성과에 대해 설명하였다. Off-line 행사와 함께 진행된 3차례에 걸친 판촉행사는 site traffic 증대, 판촉행사 참여, 그리고 분양현장으로의 고객유인과 구매에 이르기까지 높은 성과를 거둔 것으로 나타났다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.