• Title/Summary/Keyword: offshore wind farms

Search Result 109, Processing Time 0.032 seconds

Economic Considerations Underlying the Adoption of HVDC and HVAC for the Connection of an Offshore Wind Farm in Korea

  • Hur, Don
    • Journal of Electrical Engineering and Technology
    • /
    • v.7 no.2
    • /
    • pp.157-162
    • /
    • 2012
  • Wind energy is created in mega-sized wind farms situated kilometers off shore. In fact, two possibilities are considered for the transmission system between the offshore wind farm and the onshore grid: high-voltage direct current and high-voltage alternating current. From this point of view, the current paper aims to compare both systems for a 2 GW wind farm situated 80 km from the Point of Common Coupling on an economic basis using a discounted cash flow analysis. A tool is developed in Microsoft Excel to allow for quick insight in the variation of input parameters.

Possibility of Fishery in Offshore Wind Farms (해상풍력발전단지 내 어업 가능성에 관한 고찰)

  • Jung, Cho-Young;Hwang, Bo-Kyu;Kim, Sung-Cheol
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.5
    • /
    • pp.535-541
    • /
    • 2019
  • The purpose of this study was to investigate the possibility of fishery in offshore wind farms and evaluate the risk linked to the presence of turbines and submarine cables in these areas. With this objective, we studied an offshore wind farm in the Southwest Sea and the current state of vessels in the surrounding National Fishing Port. The risk assessment criteria for 22 fishing gears and methods were set by referring to the fishing boats; thereafter, the risk was assessed by experts. The fishing gears and methods that could be safely operated (i.e., associated with low risk) in the offshore wind farm were: single-line fishing, jigging, and the anchovy lift net. The risk was normal so that it is possible to operate, but the fishing gears and methods that need attention are: the set long line, drifting long line, troll line, squid rip hook, octopus pot, webfoot octopus pot, coastal fish pot, stow net on stake, winged stow net, stationary gill net, and drift gill net. Moreover, the fishing gears and methods difficult to operate in the of shore wind farm (i.e., associated with high risk) were: the dredge, beam trawl, and purse seine. Finally, those associated with very high risk and that should not be allowed in offshore wind farms were: the stow net, anchovy drag net, otter trawl, Danish seine, and bottom pair trawl.

Analysis of the Legal Blind Sectors of the Large-Scale Offshore Wind Farms of Korea and Proposal to Improve Safety Management (대규모 해상풍력발전단지의 안전관리를 위한 법적 사각지대 분석 및 개선 제안)

  • Inchul Kim;Dong Nam
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.2
    • /
    • pp.127-138
    • /
    • 2023
  • A variety of decarbonized energy sources are being developed globally to realize carbon neutrality (Net Zero) by 2050 as a measure to address the global climate crisis. As the Korean government has also established a Renewable Energy 3020 policy and promoted energy development plans using solar or wind power, large-scale offshore development projects not present before in coastal waters, such as offshore wind farms, are being promoted. From ships' point of view, offshore facilities present obstacles to safe navigation, and with the installation of marine facilities, ship collisions or contact accidents between ships and marine facilities may occur in the narrowed water areas. In addition, there are concerns about environmental pollution and human casualties caused by marine accidents. Accordingly, we review overseas and domestic offshore wind farm development plans, analyze whether institutional devices are in place to ensure the safe passage of ships in wind farm areas, and study the safe operation of large-scale offshore wind farms and safe passage of ships along the Korean coast by comparing overseas legislative cases with domestic laws and presenting a proposal to illuminate the legal blind sectors.

Economic analysis of a 22.9 kV HTS power cable and conventional AC power cable for an offshore wind farm connections

  • Jung, Ga-Eun;Dinh, Minh-Chau;Sung, Hae-Jin;Park, Minwon;Yu, In-Keun
    • Progress in Superconductivity and Cryogenics
    • /
    • v.20 no.4
    • /
    • pp.60-64
    • /
    • 2018
  • As the offshore wind farms increase, interest in the efficient power system configuration of submarine cables is increasing. Currently, transmission system of the offshore wind farm uses almost AC system. High temperature superconducting (HTS) power cable of the high capacity has long been considered as an enabling technology for power transmission. The HTS cable is a feasible way to increase the transmission capacity of electric power and to provide a substantial reduction in transmission losses and a resultant effect of low CO2 emission. The HTS cable reduces its size and laying sectional area in comparison with a conventional XLPE or OF cable. This is an advantage to reduce its construction cost. In this paper, we discuss the economic feasibility of the 22.9 kV HTS power cable and the conventional AC power cables for an offshore wind farm connections. The 22.9 kV HTS power cable cost for the offshore wind farm connections was calculated based on the capital expenditure and operating expense. The economic feasibility of the HTS power cable and the AC power cables were compared for the offshore wind farm connections. In the case of the offshore wind farm with a capacity of 100 MW and a distance of 3 km to the coast, cost of the 22.9 kV HTS power cable for the offshore wind farm connections was higher than 22.9 kV AC power cable and lower than 70 kV AC power transmission cable.

Voltage Recovery Capability of Offshore Wind Farm Connected to a Weak Grid via a VSC-HVDC (VSC-HVDC를 통한 약한 계통에 연계된 해상풍력발전시스템의 전압회복능력)

  • Phan, Dinh-Chung;Ro, Kyoung-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.702-703
    • /
    • 2011
  • Large offshore wind farms using high voltage direct current transmission system (HVDC) have been considered and exploited in many countries in the world. The maintenance of the stable operation of wind farm and interconnected system is an important issue, especially in the case of fault. To ensure the stable operation after fault clearance, the PCC voltage must be restored as soon as possible and meet the grid code requirement. This paper will evaluate the PCC voltage recovery ability of a large offshore wind farm as it is connected to a weak grid via a VSC-HVDC.

  • PDF

Optimal Design and Economic Evaluation of Energy Supply System from On/Off Shore Wind Farms (육/해상 풍력기반 에너지생산 공정 최적 설계 및 경제성 평가)

  • Kim, Minsoo;Kim, Jiyong
    • Korean Chemical Engineering Research
    • /
    • v.53 no.2
    • /
    • pp.156-163
    • /
    • 2015
  • This paper presents a new framework for design and economic evaluation of wind energy-based electricity supply system. We propose a network optimization (mixed-integer linear programming) model to design the underlying energy supply system. In this model we include practical constraints such as land limitations of onshore wind farms and different costs of offshore wind farms to minimize the total annual cost. Based upon the model, we also analyze the sensitivity of the total annual cost on the change of key parameters such as available land for offshore wind farms, required area of a wind turbine and the unit price of wind turbines. We illustrate the applicability of the suggested model by applying to the problem of design of a wind turbines-based electricity supply problem in Jeju. As a result of this study, we identified the major cost-drivers and the regional cost distribution of the proposed system. We also comparatively analyzed the economic performance of on/off shore wind farms in wind energy-based electricity supply system of Jeju.

DC Voltage Build-Up Suppression Scheme of HVDC System for Offshore Wind Farm Connection using Chopper Resistor and de-loading (초퍼저항 및 de-loading 협조제어를 통한 해상풍력 연계용 HVDC시스템 DC전압 상승 억제 방안)

  • Lee, Hyeong-Jin;Kang, Byoung-Wook;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.5
    • /
    • pp.750-756
    • /
    • 2017
  • This paper presents a method for DC voltage control of HVDC system connection of offshore wind farms. In the event of fault in AC grid, HVDC system need to meet LVRT regulations. When HVDC system meet LVRT regulation, unbalance is caused between power input and power output for DC link. Therefore, LVRT regulation lead to DC voltage increase of HVDC system. To control the DC voltage increase, the chopper resistor can be suggested. In this paper, DC voltage suppression is proposed using chopper resistor and de-loading. The effectiveness of the chopper resistor was verified using PSCAD/EMTDC.

Evaluation of Implementation Potential of Offshore Wind Farm Capacity in Korea Using National Wind Map and Commercial Wind Farm Design Tool (국가바람지도와 상용 단지설계 프로그램을 활용한 국내 해상풍력단지 공급가능 잠재량 산정)

  • Song, Yuan;Kim, Chanjong;Paek, Insu;Kim, Hyungoo
    • Journal of the Korean Solar Energy Society
    • /
    • v.36 no.4
    • /
    • pp.21-29
    • /
    • 2016
  • Commercial wind farm design tools and the national wind map are used to determine the implementation potential of offshore wind power in Korea in this study. For this, the territorial waters of Korea were divided into nine analysis regions and a commercial CFD code was used to obtain wind resource maps at 100m A.S.L. which is the hub height of a 5MW wind turbine used in this study. With the wind resource obtained, factors including water depth, distance from substations, minimum and maximum capacity of a wind farm, distance between turbines and wind farms were considered to determine wind power potential. Also, the conservation areas, military zones, ports, fishing grounds, etc. were considered and excluded. As the result, a total capacity of 6,720 MW was found to be the implementation potential and this corresponds to $3.38MW/km^2$ in API. Also if the distance from the substation is not considered, the potential increased to be 10,040 MW. This offshore wind farm potential is considered enough to satisfy the target of wind farm capacities in the 7th national plan for electricity demand and supply.

The Research on the Yeonggwang Offshore Wind Farm Generated Energy Prediction (영광 해상풍력단지 발전량 예측에 관한 연구)

  • Jeong, Moon-Seon;Moon, Chae-Joo;Jeong, Gwan-Seong;Choi, Man-Soo;Jang, Yeong-Hak
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.3
    • /
    • pp.33-41
    • /
    • 2012
  • As the wind farms in large scale demand enormous amount of construction cost, minimizing the economic burden is essential and also it is very important to measure the wind resources and forecast annual energy production correctly to judge the economic feasibility of the proposed site by way of installing a Met mast at or nearby the site. Wind resources were measured by installing a 80[m] high Met mast at WangdeungYeo Island to conduct the research incorporated in this paper and offshore wind farm was designed using WindPRO. Wind farm of 100[MW] was designed making use of 3 and 4.5[MW] wind generator at the place selected to compare their annual energy production and capacity factor applying the loss factor of 10[%] and 20[%] respectively to each farm. As a result, 336,599[MWh] was generated by applying 3[MW] wind generator while 358,565 [MWh] was produced by 4.5[MW] wind generator. Difference in the energy production by 3[MW] generator was 33,660 [MWh] according to the loss factor with the difference in its capacity factor by 3.8[%]. On the other hand, 23 units of 4.5 [MW] wind generators showed the difference of annual energy production by 35,857 [MWh] with 4.0[%] capacity factor difference.

Improvement for Marine Environmental Impact Assessment on the Development of Offshore Wind Power (해상풍력개발사업의 바다환경영향평가 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Jeon, Kyeong-Am;Eom, Ki-Hyuk;Yu, Jun
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.1
    • /
    • pp.1-13
    • /
    • 2012
  • We diagnosed on status and problems of environmental assessment regarding development of offshore wind power, and also on reasonable core assessment items. Most of the coastal wind power are located on the western coastline of Korea and Jeju Island. In the selections of the site for the offshore wind farms, a previous investigations should be conducted with regard to distances from the land, stabilities from external forces (tide, wave, etc.) and topographical changes, and characteristics of the surroundings (distributions of protected area, fishing ground, artificial seagrasses, and shipping traffic). It is needed to assess dispersion of suspended solids, changes of the sea bottom, and impacts on fisheries resources and fishing activities under construction of offshore wind power. Furthermore, the responses of marine organisms to noise and vibration, impacts by electromagnetic fields, impacts on sea birds, hindrances to sea lane routes, and damaged scenery and marine protection areas are thoroughly assessed during operation processes. The consultation criteria in case of development of offshore wind farm is adjusted by focusing marine environmental impact assessment.