• Title/Summary/Keyword: office building

Search Result 1,122, Processing Time 0.025 seconds

Structural Design of High-Rise Concrete Condominium with Wall Dampers for Vibration Control

  • Tsushi, Takumi;Ogura, Fumitaka;Uekusa, Masahiro;Kake, Satoshi;Tsuchihashi, Toru;Yasuda, Masaharu;Furuta, Takuya
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.201-209
    • /
    • 2019
  • This paper presents a structural design of the "(Tentative Name) Toranomon Hills Residential Tower" which is currently under construction in Tokyo. The building is a reinforced concrete high-rise residential complex building with 54 stories above ground, 4 basement levels, and a building height of about 220 m. It is a requirement to provide the highest grade of residence in Japan, and in terms of the structural design, it is required to provide wide and comfortable spaces with high seismic performance. These requirements are satisfied by providing a total of 774 vibration control walls of two types. Also, to further improve the structural performance, steel fibers at the rate of 1.0vol% are provided in the ultra-high strength concrete used in the column members.

Sick Building Syndrome and the Related Factors in Office Workers (일부 대형빌딩 근무자에서 sick building syndrome의 위험요인에 관한 연구)

  • Baik, Jae-Joong;Cho, Soo-Hun;Park, Byung-Joo;Kang, Dae-Hee
    • Journal of Preventive Medicine and Public Health
    • /
    • v.30 no.1 s.56
    • /
    • pp.157-170
    • /
    • 1997
  • A cross-sectional study was conducted to investigate the prevalence and risk factors for symptoms associated with sick building syndrome in four office buildings located in Seoul. Information on personal factors, job-related factors, and medical history were collected using self-administered questionnaires modified from the National Institute for Occupational Safety and Health Indoor Air Quality questionnaire in 321 office workers in these buildings. The prevalence of general and irritant symptom groups was higher than the prevalence of dermatologic and respiratory symptom groups. Daily total work time, work time in the office, and work time with video display terminals (VDT) were identified as the risk factors for symptom groups associated with sick building syndrome by multiple linear logistic regression analysis. In conclusion, these results indicated that the symptom prevalence in this study is similar with the results reported from previous studies conducted in other countries and work time and work with VDT are related to sick building syndrome in Korea.

  • PDF

A Study on the Government Office Building of Chongju Castle in the Late Yi-dynasty (청주읍성(淸州邑城) 관아공해고 - 규모(規模) 및 위치(位置) 추정(推定)을 중심(中心)으로 -)

  • Kim, Dong-Sik;Kim, Tai-Young
    • Journal of architectural history
    • /
    • v.8 no.1 s.18
    • /
    • pp.41-52
    • /
    • 1999
  • This study aims to infer the plan and location of the government office building in Chongju Castle in the Late Yi-dynasty. The conclusion is as follows: 1. The Chongju Castle Map(淸州邑城圖, late in the 18th century, hereinafter referred to CCM) provides the detail arrangement and location of Government Office Building in Chongju Castle. And the road structure and plan of the CCM is almost same with the present time. 2. As compared with CCM and a Chongju-land Registration Map(淸州面地籍原圖, 1913, CRM) to infer the location of the traditional government office building in Chongju Castle, the building locations of Gaek-Sa(客舍) Donghun(東軒)'s region in CCM are almost accordance with today's. But those of Byungyoung(兵營) Group's region are represented by a little error. So the locations of Byungyoung(兵營) Group's region rearranged, moved down to be in accordance with the approach circulation of Main Gate(閉門樓) which is shown in CRM. 3. The records, on the plan of the traditional government office building in Chongju Castle, have proved that the plan of Gaek-Sa was a width of 11 bay and a depth of 2 bay. A width of 3 bay drawn in CCM, the present plan of Donghun is a width of 7 bay and a depth of 4 bay. The main building and especially the double-storied Main Gate($4{\times}3$) of Byungyoung Group are exactly in keeping with the present road structure.

  • PDF

Analysis of Office Building HVAC System Drawings (사무용 건축물 공조설비 설계도서 분석)

  • Park, Jong-Il;Kim, Se-Hwan;Kim, Dong-Kyu
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.11
    • /
    • pp.776-781
    • /
    • 2007
  • Optimized capacity of equipments are essential for energy saving and low cost construction and operation. So we must use proper design data for HVAC system design. We investigated for architectural data, equipment capacity, cooling and heating load design criteria of 52 office buildings. Following research results were obtained by carrying out each task. Office building effective area rate is 63%. The average building cooling load of South Korea is $140W/m^2$ and average heating loads in Seoul and Pusan area are $120{\sim}130W/m^2$ and $70{\sim}80W/m^2$. We also analysised HVAC design criteria. Person ratio in effective building area is $0.2person/m^2$, sensitive and latent heat loads of a person are 60W and 65W, light and equipment loads of office buildings are $25W/m^2$ and $20W/m^2$.

A Study on the Fire Safety of High-rise Office Buildings in Respect of Architectural Design (고층 사무소건축의 화재안전에 관한 건축계획적 연구)

  • 이강훈
    • Fire Science and Engineering
    • /
    • v.8 no.2
    • /
    • pp.3-15
    • /
    • 1994
  • The purpose of this paper is to present refernce data to be considered in designing for the fire safety of high-rise office buildings. This paper deals with the characteristics of high-rise office buildings in the fire safety aspects, the basic principles for the fire safety of high-rise office building design, and this study is focused particularly on the location of the escape route of core plan for fire safety in high-rise office buildings.

  • PDF

Study on the introduction and assessment of the Life Cycle Carbon Emissions in Office Buildings

  • Park, Mincho;Lee, Byeongho;Shin, Sung-Woo
    • KIEAE Journal
    • /
    • v.14 no.1
    • /
    • pp.49-57
    • /
    • 2014
  • Global warming has become a major issue all over the world. Noting the carbon dioxide emissions as a main contributor to global warming, we studied on the methods to reduce the life cycle building carbon emissions. Green Building Certification Criteria(GBCC) has been implemented since 2002 in Korea, but it doesn't estimate the quantities of the $CO_2$ emissions. Therefore, we studied the ways to implement the $CO_2$ emissions in quantity to GBCC. We select a government building which was rated excellent by the GBCC. This office building was regarded to excellent building by GBCC but not good for energy consumption. It was found energy glutton buildings for research by the Ministry of Public Administration and Security in 2010. This part of GBCC is need to be improved.. Also LCA (Life Cycle assessment) was carried out to estimate on carbon footprint on this office building. So we need to implementing quantitative evaluation on the amount of carbon emissions by GBCC. And it is possible to implementing quantitative evaluation on the amount of carbon emissions. Through this study, we expect that quantitative assessment of life cycle carbon emissions of buildings by the GBCC. Also expect to reduce the carbon emissions of the building by improving the GBCC.

A Stud on the Space Organization and Composition Elements in Gangwon Gamyoung (강원감영의 공간구성과 구성요소의 건축적 특징에 관한 연구)

  • Choi, Jang-Soon
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.7 no.2
    • /
    • pp.31-47
    • /
    • 2005
  • This study is to inspect and analyse the historical background, spacial organization and architectural features about the traditional government office building of Gangwon Gamyoung(the supreme local government office of Gangwondo in Chosun dynasty). The results are as follows. - Gangwon Gamyoung was located at the center of Gangwondo in consideration of distance to each small local office. And also it was located in consideration of geographical connection between Hanseong(today's Seoul). - The spatial organization of Gamyoung was divided into the three parts of entrance space, government office building space and backyard space. The entrance space was composed of three gates(Pojungru-Jungsammun-Naesammun). The government office building Space was consisted of business and living building as center of Sunhwadang(the main office building). And the backyard space was composed of Yonji(pond), Jungja(bower), and so on - The way to enter the space of Gamyoung follows the order from Pojungru(the first & outer main gate with a bower), Jungsammun(the second & intermediate gate), Naesammun(the third & inner gate) to Sunhwadang at last. - There were a beautiful Yonji(pond) which to be rectangular type and to have a round island with Bongraegak(bower) at Gamyoung backyard, the drain conduit and pedestrian road covered with pebble in the ground.

  • PDF

Selection to the Optimal Windows Transmittance of Office Building on Sky Conditions (천공상태에 따른 오피스 창호의 적정 투과율 선정)

  • 임오연;김병수
    • Korean Institute of Interior Design Journal
    • /
    • no.38
    • /
    • pp.225-232
    • /
    • 2003
  • The purpose of this study is to select the optimal and minimum transmittance for visual amenity in office buildings. This study progressed as follows. The first, we select 5 films with various transmittance based on the current film makers whose films being used on the windows of office building nowadays and the case study of construction. And then we choose 6 kinds of transmittance as evaluation object including plain glass. The second, we made a mock-up models having different transmittance on the southern windows with model of real scale office building. The third, we select 17 pairs of adjectives for the evaluation of visual comfort on interior or exterior conditions with transmittance factor. The fourth, subjective evaluation experiment was done using selected evaluation adjectives and the result was analyzed. The results are as follows : the minimum transmittance appropriate for the office building is 30%∼40% and the optimal transmittance range is 40%∼60%.

A Suggestion on the Fire load and Combustible survey for Prediction of Fire in office Facilities (업무시설의 화재성상예측을 위한 가연물 조사 및 화재하중 제안)

  • Lee, Byeong-Heun;Kwon, Young-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.98-99
    • /
    • 2019
  • In Korea, buildings are becoming skyscrapers due to restrictions on land. The performance-oriented design was introduced in 2009 for fire safety of such buildings, but the application of the combustible data through engineering design and experiment is a poor reality. Large buildings are used for complex purposes, especially since the density of the office facilities is high, the study conducted a study on the combustible materials of the office facilities and the thermal speed and fire load of the main combustibles of the office facilities were calculated.

  • PDF

A Study on Strategies for Obtaining Certification in the Revised Assessment Standards on Intelligent Building Certification System - Focused on Assessment Standards for Office Building Projects - (국내 지능형건축물 인증제도 평가기준의 개정에 따른 인증전략에 관한 연구 - 업무시설 인증기준 중심으로 -)

  • Choi, Yeo-Jin;Lhee, Sang-Choon
    • KIEAE Journal
    • /
    • v.12 no.3
    • /
    • pp.77-82
    • /
    • 2012
  • With developments of architectural and information technologies at the knowledge-information oriented society in the 21st century, there are the needs on intelligent buildings equipped with advanced systems to integrate both technologies. The intelligent building means a smart building which provides comfortable environments, realizes fast and speed information and telecommunication network services, and maximizes work productivities by adopting various systems suitable to uses, sizes, and functions of buildings. In order to meet these needs of the times, the domestic intelligent building certification system has been enforced in 2006. Recently, the intelligent building certification system was newly revised for revitalizing the spread of intelligent buildings. Thus, this paper investigates rating criteria and assessment standards of the new certification system focused on office building projects and suggests strategies for obtaining certifications by analyzing cases which were certified on the previous version of the system.