• Title/Summary/Keyword: observation planning

Search Result 322, Processing Time 0.034 seconds

A Study on Domestic Applicability for the Korean Cosmic-Ray Soil Moisture Observing System (한국형 코즈믹 레이 토양수분 관측 시스템을 위한 국내 적용성 연구)

  • Jaehwan Jeong;Seongkeun Cho;Seulchan Lee;Kiyoung Kim;Yongjun Lee;Chung Dae Lee;Sinjae Lee;Minha Choi
    • Korean Journal of Remote Sensing
    • /
    • v.39 no.2
    • /
    • pp.233-246
    • /
    • 2023
  • In terms of understanding the water cycle and efficient water resource management, the importance of soil moisture has been highlighted. However, in Korea, the lack of qualified in-situ soil moisture data results in very limited utility. Even if satellite-based data are applied, the absence of ground reference data makes objective evaluation and correction difficult. The cosmic-ray neutron probe (CRNP) can play a key role in producing data for satellite data calibration. The installation of CRNP is non-invasive, minimizing damage to the soil and vegetation environment, and has the advantage of having a spatial representative for the intermediate scale. These characteristics are advantageous to establish an observation network in Korea which has lots of mountainous areas with dense vegetation. Therefore, this study was conducted to evaluate the applicability of the CRNP soil moisture observatory in Korea as part of the establishment of a Korean cOsmic-ray Soil Moisture Observing System (KOSMOS). The CRNP observation station was installed with the Gunup-ri observation station, considering the ease of securing power and installation sites and the efficient use of other hydro-meteorological factors. In order to evaluate the CRNP soil moisture data, 12 additional in-situ soil moisture sensors were installed, and spatial representativeness was evaluated through a temporal stability analysis. The neutrons generated by CRNP were found to be about 1,087 counts per hour on average, which was lower than that of the Solmacheon observation station, indicating that the Hongcheon observation station has a more humid environment. Soil moisture was estimated through neutron correction and early-stage calibration of the observed neutron data. The CRNP soil moisture data showed a high correlation with r=0.82 and high accuracy with root mean square error=0.02 m3/m3 in validation with in-situ data, even in a short calibration period. It is expected that higher quality soil moisture data production with greater accuracy will be possible after recalibration with the accumulation of annual data reflecting seasonal patterns. These results, together with previous studies that verified the excellence of CRNP soil moisture data, suggest that high-quality soil moisture data can be produced when constructing KOSMOS.

A biota research and analysis for Close-to-nature stream restoration planning (자연형 하천복원계획 수립을 위한 생물상 조사 및 분석)

  • SaGong, Jung-Hee;Ryu, Yeon-Su;Ra, Jung-Hwa
    • Current Research on Agriculture and Life Sciences
    • /
    • v.24
    • /
    • pp.37-42
    • /
    • 2006
  • The purpose of this study was a biota research and analysis for Close-to-nature stream restoration planning of Shinchun. The summary of this study is as follows; 1) The vascular plants in research area recorded of 45 species and insect fauna recorded of 34 species of 8 orders. As a result of table of community classification, the communities were two group; Quercus variabilis community(I), Pinus densiflora-Quercus variabilis-Quercus dentata community(II). 2) As a result of analysis on correlation of tree species, the level of significance in positive correlation between Quercus dentata and Corylus heterophyll aindicated 1% and between Pinus densiflora and Lespedeza bicolor also indicated 1%. 3) As a result of DBH analysis, it is expected that Quercus variabilis and Quercus dentata will dominateover other species in competition and its succession continuously maintains from now on in community I. In community II, it is assumed that there is a high possibility of changing into community of Quercus such as Quercus mongolica, Quercus dentata, and Quercus variabilis. 4) As a result of analysis on insect fauna, insect fauna consists of 94% of whole species as 32 species, 23 families, 8 orders. And 7 species, 7 families 4 orders was found in highly urbanized area, the vicinity of Sang-Dong bridge. 5) As mentioned above, Based on A biota fundamental research, Close-to-nature stream restoration planning were full of suggestions: i) Designating ecosystem preservation area, ii) Making Close-to-nature stream revetments, iii) Making pool-and-riffle, vi) Making decks for observation and walks for nature experience, v) Creating wetland biotope. Through these methods, it is necessary to promote bio-diversity and lead people to the space for eco-learning.

  • PDF

Estimation of Han River runoff using Cheugugi data (측우기 자료를 이용한 한강 유출량 추정)

  • Moon, Jang Won
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.12
    • /
    • pp.1067-1074
    • /
    • 2019
  • In Korea, there are long-term rainfall observation data using Cheugugi, but it is relatively insufficient to use the data for water resources planning and management. In this study, river runoff is estimated based on the measurement data using Cheugugi so that it can be used as a scenario for the water resources planning process. After deriving the relationship between rainfall and runoff, the results are applied to the observations of Cheugugi to estimate the Han River runoff. An analysis of the estimated river runoff is made to confirm that there is a very severe drought for three consecutive years from 1900 to 1902. Especially, it is analyzed that there is a very small runoff in 1901, which is 8.6% compared to the average of estimated runoff. Consequently, it is judged that the results of this study can be useful as a scenario for water resources planning or drought response planning.

A Study on the Landscape Plan for the Sambaek Agricultural Theme Park (삼백 농업·농촌 테마공원 기본계획)

  • Kwon, Jin-Wook;Park, Chan-Yong
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.1
    • /
    • pp.147-159
    • /
    • 2014
  • This study aims to draw up a basic plan to construct an agricultural theme park in a farming city as a way of establishing its regional identity represented by "Three Whites". Sangju, Kyongsangbuk-do which is the subject area of the study has been well-known for "Three Whites (rice, silkworm cocoon and dried persimmon)." The purpose of the study is to take a closer look at the folk life and culture of Sangju and develop tourism resources to promote regional development and competitiveness of the city. This study was conducted in several phases in consideration of the characteristics of plan and design, on the basis of the theoretical review of agricultural tourism. In the first phase, planning conditions were analyzed as per development objectives. In the second phase, strategies and concepts were established for the theme park, based on which development methods were decided by phase and facility. Then, a preliminary review was conducted on functions and facilities to introduce to the theme park. In the third phase, a comprehensive plan was drawn up, which includes basic plans for respective parts. In consideration of the characteristics of the study, construction was not looked at in detail. The total size of land subject to the study is approx. $97,960m^2$, which was divided into four separate zones--Sambaek Cultural Experience Zone, Natural Observation & Experience Zone, Agricultural Life Experience Zone and other facilities zone--in order to connect facilities, functions and experience with the physical characteristics of the city, and separate space planning was conducted for each zone. The outcome of the study carries significance as an example of alternative tourism which considers regional characteristics, develops local resources and makes use of obsolete rural facilities, in what is called the eco-friendly development where nature and eco-system, landscape and culture, and recreation and leisure come together as one.

Action Research: the Use of Enterprise Resource Planning System in Construction Engineering and Project Management

  • Chan, Eric W.L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.3
    • /
    • pp.18-27
    • /
    • 2011
  • Although information communication technology (ICT) is long regard as very useful tool in today's construction engineering and project management environment, organizations must not only operate based upon its original setting, but also requires on-going observation, additional features and fine-tuning actions before the desirable outcome can be achieved. However, it is a very common phenomenon that organizations purchase the licensed "off-the-shelf-software" package and customize it to suit their own business need. Due to the incapability of such software and inefficient customization, the possible result is making that ICT tool not user-friendly and sometimes the whole system becomes obsolete. The purpose of this paper is to review and report those actions taken (between February 2006 and December 2010) by a construction organization to enhance the performance of its Enterprise Resource Planning (ERP) system launched in December 2002. Such actions include: improving data inputting method; removing the transition bottleneck; introducing crystallization function; revising the organization's "Delegation and Limits of Authority"; publishing the "League Table" amongst users; integrating the 3D Mode into the system and upgrading hardware. Whilst the ultimate goals of such system are well beyond the time limit of this research study, an obvious interim result, achieved by this case studied organization, was winning a landmark project worth US$500 million after the ERP system was functioned properly and effectively. Their experience and success becomes an exemplar which can be borrowed by those companies, from managerial perspectives and as a roadmap, planning to adopt information technology (IT) strategy and use ICT tool in the construction engineering and project management framework. Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

The Analysis of the Process Elements and the Characteristics of Biologists' and Gifted Students' Designing Experiment Activities (생물학자와 과학영재의 실험설계활동에서 나타나는 과정요소 및 특성 분석)

  • Yang, Il-Ho;Ryu, Seol-Jin;Lim, Sung-Man
    • Journal of Science Education
    • /
    • v.33 no.2
    • /
    • pp.271-289
    • /
    • 2009
  • The purpose of the research was to analyze the characteristics and the process elements which appeared to the process of designing experiment for biologists and gifted students in science. Four biologists and thirty-two gifted students were participated in this study. The findings indicated that (a) the researcher figured out the process elements could constructed in fifteen elements such as confirming questions, arrange materials, consideration for experimental subjects, searching variables, eliminating variables, selecting variables, planning operation of variables, planning control environmental variables, planning control biological variables, planning the methods of observation and assessment, planning the methods of collecting data, planning the interpretation of data, planning the repetition of experiments, planning the repetition of assessment, safety regulations as well. The biologists concentrated in the particular process elements related with variables, since the science-gifted students concerned the performance whole process elements themselves without deeper consideration, (b) the characteristics of biologists and science-gifted students in the process of designing experiment were as follows; 1) biologists and students showed the process elements which include the domain specific process skills as well, 2) biologists accurately conducted the designing experiments processes with repetition of specific process, since students designed experiments conventionally, and 3) biologists possessed the domain specific skills and know-how about their experiments, but students did not. The results show that the programs of designing experiment activity should be constructed with the process elements which were concentrated by biologists, should provide feedbacks to design experiment more accurately, and should be developed with concern of the process skills and know-hows of biologists.

  • PDF

A Study on a Project Management Improvement Method for the Development of Next Generation Geostationary Earth Observation Satellite System (차세대 정지궤도 지구관측 위성시스템 개발 사업관리 개선 방안에 관한 연구)

  • Choi, Won Jun;Eun, Jong Won
    • Journal of Satellite, Information and Communications
    • /
    • v.10 no.4
    • /
    • pp.95-100
    • /
    • 2015
  • These days, satellite core technologies are being developed as a way to provide various information by considering simultaneously sending, wide area covering, highly precide, and anti-disaster technologies. Not only global positioning, and image but also space launcher, satellite bus, satellite payload, earth station are being convergently developed in a different technological field. Especially, it is required a lot of initial investing expenditure to provide the Earth observational information service based on the space technologies. Such a trend and change of satellite technologies Korea has realized the necessity for the domestic independent development of next generation earth observation satellites, and are preparing the profound items such as a detailed implementation plan for the efficient development project. Like the satellite advanced countries, it should be transparently carried out that an efficient implementation of the developing target related to the geostationary earth observation satellite development, establishment of technological auditing function and quality assurance system, implementation plan, progressing courses and results of the satellite development program by way of planning, evaluation and management. For these things cited above, it is necessary to operate systematically and continuously the professional structural system by the governmental department in order to control the geostationary earth observation satellite development project. Therefore, this study proposes a development project management improvement method of the Korea next generation geostationary earth observation satellite based on the development project management system of the domestic geostationary satellite system.

Empirical recommendation for planning the observation density of water level in a reservoir (Case study on Hwacheon Dam in Korea) (저수지 수위 관측밀도 제안: 화천댐 중심으로)

  • Hwang-Bo, Jong Gu;Hong, Jun Hyuk
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.10
    • /
    • pp.835-841
    • /
    • 2022
  • The water level of the dam reservoir is an important data in the operation of the dam. reservoir storage can be calculated by using water levels or prepared for disasters such as drought and floods. However, the water level is measured near the dam, making it difficult to represent a reservoir with a large area, and there is a high possibility that the water surface will be distorted due to discharge. Furthermore, the results of the survey showed that the water level of the reservoir is irregular rather than constant, and the water level of the reservoir is repeatedly falling and rising by section. In order to calculate such a complex and irregular representative water level, the water level observation density of the reservoir must be increased. In this study, we tried to derive the optimum water level observation density for Hwacheon Dam. A reasonable water level measurement density was derived by investigating the water level elevation of the reservoir and statistically analyzing it. The observation density may vary depending on the size of the reservoir, so the same analysis was conducted on the Goesan Dam and Boseonggang Dam. According to the results, four Hwacheon dams, three Goesan dams, and seven Boseong River dams are needed for observation density.

A Study on the Practice of Performance Assessment in the Elementary School Mathematics - Focussing on Self-assessment and Peer-observation - (초등학교 수학과 수행평가 실천에 관한 연구 - 자기평가.동료평가.관찰평가를 중심으로 -)

  • Kim Song-Ja;Choi Chang-Woo
    • Journal of Elementary Mathematics Education in Korea
    • /
    • v.10 no.1
    • /
    • pp.67-87
    • /
    • 2006
  • This study is to recognize a problem in the practice of performance assessment in elementary school, and to find out some suggestive points for improvement of teaching·learning method in elementary mathematics through assessment by reducing time restriction according to assessment through the practice of self-assessment, peer-assessment and observation, and then by reflecting the results of assessment on teaching learning plan. For that, the questions of study set up are as follows ; 1. How should self-assessment and peer-assessment be applied to in elementary mathematics assessment? 2. How should the time for 'let's play an interesting game' be managed for assessment of elementary mathematics? 3. How should the results of assessment be reflected on the Process of teaching and learning of mathematics? To solve these problems, a researcher of this thesis performed self-assessment, peer-assessment on 40 students of second grade under her charge as a class teacher, and applied observation in the time management process for 'let's play an interesting game' for a semester. self-assessment was made by mathematics journal, self-assessment chart, peer-assessment was by the analysis of conversation record among students in the situations of assessment, and observation was by observation of activity when playing with the results data of play analyzed. the concrete methods of application as follows ; First, mathematics journal was applied $1{\sim}2$ times by each unit with reconstruction into the level of second grade on the basis of the preceding-study models. Second, peer-assessment was applied to the unit-assessment time and the play-activities time by the method of recording·analyzing the contents of conversation among students in the process of assessment. Third, mathematical attitude & dispositions of students making use of the self- assessment table were examined referring to the teaching learning plan. Fourth, the time management for 'let's play an interesting game' was made through the prior recognition of play method and the joyful play-activities by use of the play-plate. Assessment depended on analysis of play-activities results of students making use of an observation form. Fifth, the results of self-assessment, peer-assessment, and observation were analyzed, and then they were made use of as self-observation data, of teacher her/his self, or teaching·learning improvement data. Students' self-assessment datum (mathematics diary, self-assessment sheets, conversation contents in the process of assessment) and observation materials (check lists, Play-activity result materials, conversation contents in the process of play) obtained in the process of application was analyzed as follows ; 1. From the practice of self-assessment in form of mathematics journal, I could obtain not only datum showing how much students was understanding the learning aims by unit time and to any degree they reached but also information about their response to learning datum and favorable type of learning. 2. Assessment by self-assessment chart was useful in planning the mathematics teaching learning process because it helps ascertain mathematical attitude & dispositions of students. 3. Through the application of peer-assessment, students had the opportunity of communicating with other students looking back on his/her explaining process, and teachers could obtain basic materials for assessment of students. 4, In case of time management for 'let's play an interesting game', there was natural extension of play made through time-security by prior looking into the method of play-activity, and then, for a remained time, by making children play a new game. 5, I could easily record the activities of students by use of the observation. form, and make use of it as basic data for descriptive assessment. 6, Each kinds of data obtained from the results of assessment was helpful for securing self-observation materials in the process of teaching learning and for their betterment in mathematics subject. However, because they were in the second grade of elementary school and there was an individual difference, some students could not make use of mathematics diary or self-assessment form properly. In case of these students, assessment data would be obtained through interview or observation. And for effective operation of play, its purpose & method and matters that demand special attention when play-acting should be clearly guided. Also, when applying an effective play in addition to play activities in textbook, to lessons, interesting mathematics lessons could be guided.

  • PDF