• 제목/요약/키워드: non-excavation culvert

검색결과 3건 처리시간 0.016초

비굴착 지하배수암거 형태별 지하배수 성능 비교분석 (Comparative Study on the Subsurface Drainage Discharge Performance by the Type of Non-Excavation Subsurface Drainage Culvert)

  • 김현태;유전용;정기열;서동욱
    • 한국농공학회논문집
    • /
    • 제60권6호
    • /
    • pp.73-81
    • /
    • 2018
  • In this study, subsurface discharge performance has been studied through theoretical seepage analysis on four types of culverts that can be installed under the condition of non-excavation, such as (a)perforated pipe(${\Phi}50mm$), (b)perforated pipe+horizontal mat (B50cm) (c)perforated pipe+horizontal mat+vertical gravel(B<10cm), (d)perforated pipe+vertical gravel(B<10cm), and existing typical type (e)perforated pipe with gravel (B40, h=40cm) which can be installed by excavation. The analysis results were as follows. i) Subsurface discharge performance per unit (m) was (a)type 56%, (b) 91%, (c) 96%, (d) 76%, respectively, lower than the value of (e)culvert. ii) However, considering that non-excavation culvert can be installed at a spacing of 5m with the installation cost of the existing excavation culvert at the interval of 10m, it was analyzed that unit subsurface discharge(q) of (a)20.2mm/day(110%), (b)32.8(178%), (c)34.6(188%) (d)27.5(149%) in the four types of non-excavation culvert installed at intervals of 5m under the condition of $ k=10^{-4}cm/s$ was much larger than the amount of (e)type 18.5(100%), existing excavation culvert installed at 10m interval. iii) Through the test construction, peak subsurface drainage discharge($q_p$) was 38.4mm/day, which is larger than the value of design criteria and confirmed that it satisfies the analysis results as well. iv) In particular, it was evaluated that (b)perforated pipe+horizontal mat(B50cm) are low cost, high efficiency subsurface drainage culvert type with sufficient drainage performance(178%).

배수효율이 높은 지하암거의 간격과 주름유공관의 통수능 비교분석 (A Comparative Study on the Spacing and Discharge Performance of Subsurface Drainage Culvert to Increase Drainage Efficiency)

  • 김현태;유전용;정기열;박영준
    • 한국농공학회논문집
    • /
    • 제61권6호
    • /
    • pp.67-72
    • /
    • 2019
  • This study compared the theory of a culvert spacing and analytical results of the seepage flow for the subsurface drainage. i) If culvert spacing (Sc) is within 5 m, the unit drainage (q) is very larger; in contrast, if Sc is 5 m or more, there is very little drainage in the middle between drains. Therefore, the drain spacing should be within 5 m to ensure high drainage efficiency. ii) Since the planned culvert drainage increases linearly with the soil's permeability coefficient (k), k must be taken into account when determining the drain diameter by the planned culvert drainage. iii) As a result of analyzing the drainage performance of the absorbing culvert, the drainage performance is sufficient with the diameter of the corrugated drain pipe Dc = 50 mm at the length of the drain Lc = 100 m. iv) Therefore, if the drain spacing (Sc) is less than 5 m using the low-cost non-excavated drainage pipe method (${\Phi}50mm$ the corrugated drain pipe and fiber mat) rather than the conventional trench drain method (Sc > 10 m, Dc > 100 mm), uniform and high drainage efficiency can be ensured as well as low construction cost. v) The sub-irrigation+drainage culvert requires narrower drain spacing (Sc < 2-3 m) for irrigation. As a result of examining the condition of 35 mm in diameter (Dc) and 2~3 m in drain spacing, it is possible to apply the non-excavated drainage pipe method to the sub-irrigation+drainage culvert because drainage performance is sufficient at the drain length Lc = 50 m.

철도하부 가도교 설치에 대한 JES공법 (Joint Element Structure Method on the Subway Box Structure unere Railroad)

  • 피태희;조국환;사공명
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.973-981
    • /
    • 2008
  • This document presents the JES(Joint Element Structure) method that has been adopted for the firs time in our country for the construction of the structure crossing under the railroad without open excavation. Front Jacking Method, Tubular Roof Construction Method, New Tubular Roof Method and Joint Element Structure Method are commonly used for the construction of structures crossing under the railroad. JES Method, frequently used in Japan recently, is a new method to construct the structures crossing under the railroad in a safe manner and in a relatively short period of time by utilizing the steel elements with the joints through which the load in the vertical angle to the axial direction is transferred to the next element. The elements are tied to each other through the joints to form the permanent walls of a Rahmen structure under the road without open excavation and without limitation to the length in a convenient way. Through the case study in the project of a Subway Box Culvert Improvement for the Gyeonguiseon Railroad in front of Yonsei University using the JES Method, the cost and period of construction in various types of soil is investigated compared to the Front Jacking Method. Furthermore, by analyzing the results of instrumentation measurements carried out throughout the construction, comparison between the actual displacement in the ground and the predicted displacement in the design is made to provide the considerations to be counted for the design. In conclusion, comparison in the field of economic feasibility, constructability and safety between the JES Method and Front Jacking Method, which is most frequently adopted in our country at present, is made to present the JES Method as a new alternative for the non-open excavation construction method for the structures crossing under the railway.

  • PDF