• Title/Summary/Keyword: network flow model

Search Result 773, Processing Time 0.03 seconds

Development and Its Application of a Discrete Fracture Flow Model for the Analysis of Gas-Water Transient Flow in Fractured Rock Masses Around Storage Cavern (지하저장공동 주변 불연속 암반에서의 가스-물 천이유동해석을 위한 개별균열 유동모델의 개발 및 응용)

  • 나승훈;성원모
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.705-712
    • /
    • 2000
  • The fluid generally flows through fractures in crystalline rocks where most of underground storage facilities are constructed because of their low hydraulic conductivities. The fractured rock is better to be conceptualized with a discrete fracture concept, rather continuum approach. In the aspect of fluid flow in underground, the simultaneous flow of groundwater and gas should be considered in the cases of generation and leakage of gas in nuclear waste disposal facilities, air sparging process and soil vapor extraction for eliminating contaminants in soil or rock pore, and pneumatic fracturing for the improvement of permeability of rock mass. For the purpose of appropriate analysis of groundwater-gas flow, this study presents an unsteady-state multi-phase FEM fracture network simulator. Numerical simulation has been also conducted to investigate the hydraulic head distribution and air tightness around Ulsan LPG storage cavern. The recorded hydraulic head at the observation well Y was -5 to -10 m. From the results obtained by the developed model, it shows that the discrete fracture model yielded hydraulic head of -10 m, whereas great discrepancy with the field data was observed in the case of equivalent continuum modeling. The air tightness of individual fractures around cavern was examined according to two different operating pressures and as a result, only several numbers of fractures neighboring the cavern did not satisfy the criteria of air tightness at 882 kPa of cavern pressure. In the meantime, when operating pressure is 710.5 kPa, the most areas did not satisfy air tightness criteria. Finally, in the case of gas leaking from cavern to the surrounding rocks, the resulted hydraulic head and flowing pattern was changed and, therefore, gas was leaked out from the cavern ceiling and groundwater was flowed into the cavern through the walls.

  • PDF

Flow-Based Admission Control Algorithm in the DiffServ-Aware ATM-Based MPLS Network

  • Lee, Gyu-Myoung;Choi, Jun-Kyun;Choi, Mun-Kee;Lee, Man-Seop;Jong, Sang-Gug
    • ETRI Journal
    • /
    • v.24 no.1
    • /
    • pp.43-55
    • /
    • 2002
  • This paper proposes a flow-based admission control algorithm through an Asynchronous Transfer Mode (ATM) based Multi-Protocol Label Switching (MPLS) network for multiple service class environments of Integrated Service (IntServ) and Differentiated Service (DiffServ). We propose the Integrated Packet Scheduler to accommodate IntServ and Best Effort traffic through the DiffServ-aware MPLS core network. The numerical results of the proposed algorithm achieve reliable delay-bounded Quality of Service (QoS) performance and reduce the blocking probability of high priority service in the DiffServ model. We show the performance behaviors of IntServ traffic negotiated by end users when their packets are delivered through the DiffServ-aware MPLS core network. We also show that ATM shortcut connections are well tuned with guaranteed QoS service. We validate the proposed method by numerical analysis of its performance in such areas as throughput, end-to-end delay and path utilization.

  • PDF

MODELS AND SOLUTION METHODS FOR SHORTEST PATHS IN A NETWORK WITH TIME-DEPENDENT FLOW SPEEDS

  • Sung, Ki-Seok;Bell, Michael G-H
    • Management Science and Financial Engineering
    • /
    • v.4 no.2
    • /
    • pp.1-13
    • /
    • 1998
  • The Shortest Path Problem in Time-dependent Networks, where the travel time of each link depends on the time interval, is not realistic since the model and its solution violate the Non-passing Property (NPP:often referred to as FIFO) of real phenomena. Furthermore, solving the problem needs much more computational and memory complexity than the general shortest path problem. A new model for Time-dependent Networks where the flow speeds of each link depend on time interval, is suggested. The model is more realistic since its solution maintains the NPP. Solving the problem needs just a little more computational complexity, and the same memory complexity, as the general shortest path problem. A solution algorithm modified from Dijkstra's label setting algorithm is presented. We extend this model to the problem of Minimum Expected Time Path in Time-dependent Stochastic Networks where flow speeds of each link change statistically on each time interval. A solution method using the Kth-shortest Path algorithm is presented.

  • PDF

Urban Inundation Analysis using the Integrated Model of MOUSE and MIKE21 (MOUSE 및 MIKE21 통합모델을 이용한 도시유역의 침수분석)

  • Choi, Gye-Woon;Lee, Ho-Sun;Lee, So-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.7 no.4
    • /
    • pp.75-83
    • /
    • 2007
  • Urbanized area has complex terrain with many flow paths. Almost stormwater is drained through pipe network because most area is impervious. And overland flow from the pipe network reform the surface flow. Therefore, it should be considered the drainage system and surface runoff both in urban inundation analysis. It is analyzed by using MIKE FLOOD integrated 1 dimension - 2 dimension model about Incheon Gyo urbanized watershed and compared with the results of 1 dimension model and 2 dimension model. At the result this approach linking of 2 dimension and 1 dimension pipe hydraulic model in MIKE FLOOD give accuracy that offers substantial improvement over earlier approach and more information about inundation such as water dapth, velocity or risk of flood, because it is possible to present storage of overland flow and topographical characteristic of area.

Development of Two-Lane Car-Following Model to Generate More Realistic Headway Behavior (보다 현실적인 차두시간 행태 구현을 위한 2차로 차량추종모형 개발)

  • Yoon, Byoung Jo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.1999-2007
    • /
    • 2013
  • The key characteristics of two-lane-and-two-way traffic flow are platoon and overtaking caused by low-speed vehicle such as truck. In order to develop two-way traffic flow model comprised of CF(car-following) and overtaking model, it is essential to develop a car-following model which is suitable to two-way traffic flow. Short distance between vehicles is caused when a high-speed vehicle tailgates and overtakes foregoing low-speed vehicle on two-way road system. And a vehicle following low-speed vehicle decides to overtake the front low-speed vehicle using suitable space within the headway distribution of opposite traffic flow. For this reason, a two-way CF model should describes not only running within short gap but also headway distribution. Additionally considering domestic two-way-road size, there is a on-going need for large-network simulation, but there are few studies for two-way CF model. In this paper, a two-way CA model is developed, which explains two-way CF behavior more realistic and can be applied for large road network. The experimental results show that the developed model mimics stop-and-go phenomenon, one of features of congested traffic flow, and efficiently generates the distribution of headway. When the CF model is integrated with overtaking model, it is, therefore, expected that two-way traffic flow can be explained more realistically than before.

Two-Stage Model for Security Network-Constrained Market Auction in Pool-Based Electricity Market

  • Kim, Mun-Kyeom
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.6
    • /
    • pp.2196-2207
    • /
    • 2017
  • This paper presents a two-stage market auction model in a pool-based electricity market, which explicitly takes into account the system network security. The security network-constrained market auction model considers the use of corrective control to yield economically efficient actions in the post-contingency state, while ensuring a certain security level. Under this framework, the proposed model shows not only for quantifying the correlation between secure system operation and efficient market operation, but also for providing transparent information on the pricing system security for market participants. The two-stage market auction procedure is formulated using Benders decomposition (BD). In the first stage, the market participants bid in the market for maximizing their profit, and the independent system operator (ISO) clears the market based on social welfare maximization. System network constraints incorporating post-contingency control actions are described in the second stage of the market auction procedure. The market solutions, along with the BD, yield nodal spot prices (NSPs) and nodal congestion prices (NCPs) as byproducts of the proposed two-stage market auction model. Two benchmark systems are used to test and demonstrate the effectiveness of the proposed model.

Analysis of Air Distribution in the Windbox System of the Utility Boiler (보일러 Windbox내 공기공급 계통의 유량분포 해석)

  • Park, Ho-Young;Kim, Sung-Chul
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.9
    • /
    • pp.581-589
    • /
    • 2008
  • The pulverized coal combustion behavior in the utility boiler is very complex since so many physical and chemical processes happen in it, simultaneously. The mixing of pulverized coal with combustion air plays an important role in achieving the efficient combustion and stable boiler operation. The distribution of combustion air supplied to the furnace through the windbox damper system has not been clearly known since the individual measurements of air flow for each air nozzle were not possible, yet. The present study describes the CFD modelling of windbox damper system and aims to obtain the air flow rates and pressure loss coefficients across the present five damper systems, respectively. The one dimensional flow network model has been also established to get air flow distributions across the windbox damper, and applied to the actual plant operation condition. Compared with the designed air flow distribution, the modelled one gives a reasonable agreement. For the actual plant operation, the predicted air flow distribution at each air nozzle is differed with the designed data and strongly affected by the individual opening angle.

Neural Network Modeling of Hydrocarbon Recovery at Petroleum Contaminated Sites

  • Li, J.B.;Huang, G.H.;Huang, Y.F.;Chakma, A.;Zeng, G.M.
    • Proceedings of the IEEK Conference
    • /
    • 2002.07b
    • /
    • pp.786-789
    • /
    • 2002
  • A recurrent artificial neural network (ANN) model is developed to simulate hydrocarbon recovery process at petroleum-contaminated site. The groundwater extraction rate, vacuum pressure, and saturation hydraulic conductivity are selected as the input variables, while the cumulative hydrocarbon recovery volume is considered as the output variable. The experimental data fer establishing the ANN model are from implementation of a multiphase flow model for dual phase remediation process under different input variable conditions. The complex nonlinear and dynamic relationship between input and output data sets are then identified through the developed ANN model. Reasonable agreements between modeling results and experimental data are observed, which reveals high effectiveness and efficiency of the neural network approach in modeling complex hydrocarbon recovery behavior.

  • PDF

Evaluation Model for Lateral Flow on Soft Ground Using Commitee and Probabilistic Neural Network Theory (군집신경망과 확률신경망 이론을 이용한 연약지반의 측방유동 평가 모델)

  • Kim, Young-Sang;Joo, No-Ah;Lee, Jeong-Jae
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.7
    • /
    • pp.65-76
    • /
    • 2007
  • Recently, there have been many construction projects on soft ground with growth of industry and various construction problems concerning soft soil behavior also have been reported. Especially, foundation piles of abutments and (or) buildings which were constructed on the soft ground have been suffering from a lot of stability problems of inordinary displacement due to lateral flow of soft ground. Although many researches for this phenomena have been carried out, it is still difficult to assess the mechanism of lateral flow on soft ground quantitatively. And reliable design method for judgement of lateral flow occurrence is not established yet. In this study, PNN (probabilistic neural network) and CNN (committee neural network) theories were applied for judgment of lateral flow occurrence based on eat data compiled from Korea and Japan. Predictions of PNN and CNN models for new data which were not used during model development are compared with those predicted by conventional empirical methods. It was found that the developed PNN and CNN models can predict more precise and reliable judgment of lateral flow occurrence than conventional empirical methods.

Development of a Model for Calculating Road Congestion Toll with Sensitivity Analysis (민감도 분석을 이용한 도로 혼잡통행료 산정 모형 개발)

  • Kim, Byung-Kwan;Lim, Yong-Taek;Lim, Kang-Won
    • Journal of Korean Society of Transportation
    • /
    • v.22 no.5
    • /
    • pp.139-149
    • /
    • 2004
  • As the expansion of road capacity has become impractical in many urban areas, congestion pricing has been widely considered as an effective method to reduce urban traffic congestion in recent years. The principal reason is that the congestion pricing may lead the user equilibrium (UE) flow pattern to system optimum (SO) pattern in road network. In the context of network equilibrium, the link tolls according to the marginal cost pricing principle can user an UE flow to a SO pattern. Thus, the pricing method offers an efficient tool for moving toward system optimal traffic conditions on the network. This paper proposes a continuous network design program (CNDP) in network equilibrium condition, in order to find optimal congestion toll for maximizing net economic benefit (NEB). The model could be formulated as a bi-level program with continuous variable(congestion toll) such that the upper level problem is for maximizing the NEB in elastic demand, while the lower level is for describing route choice of road users. The bi-level CNDP is intrinsically nonlinear, non-convex, and hence it might be difficult to solve. So, we suggest a heuristic solution algorithm, which adopt derivative information of link flow with respect to design parameter, or congestion toll. Two example networks are used for test of the model proposed in the paper.