• Title/Summary/Keyword: national risk management system

Search Result 757, Processing Time 0.027 seconds

농식품안전 정책방향

  • Jo, Jang-Yong
    • 한국환경농학회:학술대회논문집
    • /
    • 2009.07a
    • /
    • pp.3-18
    • /
    • 2009
  • It is difficult for consumers to satisfy high safety request with post-management method such as inspection and surveillance, as various changes in-and-out of the country associated with food safety. In terms of food safety problems related to foods, it is crucial to recognize public health and consumer protection and construct pre-preventive Food Control System. A joint committee, FAO/WHO made the following consultations to the National Food Safety System. ${\circ}$ Approach entirely from farm to table ${\circ}$ Get ready for Risk Analysis System ${\circ}$ Secure transparency ${\circ}$ Establish the optimal policy by evaluating the effect of regulation When it comes to summarizing the consultation, it would be accumulated as two key words; "Efficiency" and "Credibility". Whereas the problem of efficiency focuses on precaution rather than post-management, it requires policy option to maximize consumer's benefit by evaluating the cost for the Food Safety Management and its benefit. Also, analyzing risk's character and amount, demanding an optimal means, and introducing scientific analysis system put much value on the stakeholder's communications are procedure's security which can satisfy both "Efficiency" and "Credibility" simultaneously. Especially, it is emphasized here that Risk Assessment need to be separated from Risk Management. This action is a valid means of credibility security throughout improving transparency. A number of nations and organizations have reformed the method of food management passing through reflection and examination of the prior National Food Safety Management since BSE occurred in Britain, 1996. FSA; Food Standard Agency, AFFSA, EFSA, BfR, and FSC are Risk Assessment Organization functionally separated from Risk Management Organization, JECFA, JMCFA, JMPR, JEMRA in Codex charge Risk Assessment internationally. In case of advanced countries excluding several those such as The U.S. and so forth, though these Risk Assessment Organizations are either separated functionally within Risk Management Organization or operated as apart organ, common factors are in which it has independence as Science Base. While securing independence of Risk Assessment Function, it is a tendency Risk Management should be functionally unified into efficiency as well. Though Germany constructs integral Risk Management System of diverse ways according to social and political conditions of each country such as GFOCP, DVFA, SNFA, CFIS and AQIS, there is a key word in the center, "Securing efficiency of Food Safety Management". However our nation has a representative plural;diversified system with The U.S., we took a step forward for unification as empowering policy's generalization;adjustment and Risk Assessment Function by means of enacting the "Food Safety Fundamental Law" in 2008 and establishing the "Food Safety Policy Commission" with private and governmental sectors in the Prime Minister's office. Even though the unification of Risk Management hereby increased, there is the lack of strengthening function of Risk Assessment and securing independence. It needs to be required for the professional committee in Food Safety Policy Commission to develop as a exclusive office of Risk Assessment by separating from a policy decision. Administrative Branches should reinforce feeble functions such as fundamental investigation;research for carrying out Risk Assessment with securing efficiency throughout reassessment of prior Risk Management Means.

  • PDF

Implementation of Agrometeorological Early Warning System for Weather Risk Management in South Korea

  • Shim, Kyo Moon;Kim, Yong Seok;Jung, Myung-Pyo;Choi, In Tae;Kim, Hojung;Kang, Kee Kyung
    • Journal of Climate Change Research
    • /
    • v.8 no.2
    • /
    • pp.171-175
    • /
    • 2017
  • The purpose of the farmstead-specific early warning service system for weather risk management is to develop custom-made risk management recommendations for individual farms threatened by climate change and its variability. This system quantifies weather conditions into a "weather risk index" that is customized to crop and its growth stage. When the risk reaches the stage where it can cause any damage to the crops, the system is activated and the corresponding warning messages are delivered to the farmer's mobile phone. The messages are sent with proper recommendations that farmers can utilize to protect their crops against potential damage. Currently, the technology necessary to make the warning system more practical has been developed, including technology for forecasting real-time weather conditions, scaling down of weather data to the individual farm level and risk assessments of specific crops. Furthermore, the scientific know-how has already been integrated into a web-based warning system (http://new.agmet.kr). The system is provided to volunteer farmers with direct, one-on-one weather data and disaster warnings along with relevant recommendations. In 2016, an operational system was established in a rural catchment ($1,500km^2$) in the Seomjin river basin.

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

Learning from the UK Disaster Management and Risk Assessment Systems (영국의 재난관리체계 및 재난위험성 평가제도의 도입 및 적용에 관한 연구)

  • Kim, Hak-Kyong;Kang, Wook
    • Korean Security Journal
    • /
    • no.50
    • /
    • pp.11-32
    • /
    • 2017
  • The Civil Contingencies Act 2004 in the United Kingdom provides a comprehensive definition of "Emergency", calling upon the Uk's emergency management to deal with any disaster risk regardless of cause or source. Old contingency plans for civil defense and peacetime emergencies have been integrated into current integrated emergency management. In the UK, emergencies are managed by emergency services and other responders at the local level without direct involvement of central government. On top of this, a classified assessment of the risks of civil emergencies is also conducted on a regular basis, not only at the local level but also at the national level. This research looks into the Uk's emergency management system, including recent changes, and its risk assessment systems. Finally, the research draws policy implications for the development of Korea's disaster management mechanism as follows: 1) Korea should adopt an integrated emergency management system and combine civil defense with peacetime emergency planning, 2) it should create inter-operability between emergency responding organizations such as police, fire and ambulance, and finally 3) it must develop risk evaluating tools, such as a Community Risk Register and National Risk Register, both at the local and the national level. Last but not least, the UK emergency management system cannot be directly lifted from the UK and applied to risks and hazards faced by South Korea. Therefore, cross-cultural synthesis of many national approaches to emergency management is further required particularly for customizing policy to the particular needs of Korea.

  • PDF

Development of the Requirement Management system for the railway safety (철도 안전을 위한 요건 관리시스템 개발)

  • Choi, Don-Bum;Wang, Jong-Bae;Park, Chan-Woo;Gwak, Sang-Rok;Kim, Min-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.2070-2074
    • /
    • 2008
  • It is necessary to develop the requirement management system that could trace hazards and manage safety requirements for risk control of railway accident as low as reasonably practicable. In this paper, the requirement management system for control of railway accident risk is introduced. The requirement management system is containing the railway system configuration and safety activity related with identified hazards. The system shall be used to derive safety requirements for risk controland support the traceability of hazards on railway's operation & management. In the future, the system will be applied in the areas such as risk assessment and management, performing safety assurance and revising national regulations etc. for continuous safety improvement in the railway.

  • PDF

Development of Semantic Risk Breakdown Structure to Support Risk Identification for Bridge Projects

  • Isah, Muritala Adebayo;Jeon, Byung-Ju;Yang, Liu;Kim, Byung-Soo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.245-252
    • /
    • 2022
  • Risk identification for bridge projects is a knowledge-based and labor-intensive task involving several procedures and stakeholders. Presently, risk information of bridge projects is unstructured and stored in different sources and formats, hindering knowledge sharing, reuse, and automation of the risk identification process. Consequently, there is a need to develop structured and formalized risk information for bridge projects to aid effective risk identification and automation of the risk management processes to ensure project success. This study proposes a semantic risk breakdown structure (SRBS) to support risk identification for bridge projects. SRBS is a searchable hierarchical risk breakdown structure (RBS) developed with python programming language based on a semantic modeling approach. The proposed SRBS for risk identification of bridge projects consists of a 4-level tree structure with 11 categories of risks and 116 potential risks associated with bridge projects. The contributions of this paper are threefold. Firstly, this study fills the gap in knowledge by presenting a formalized risk breakdown structure that could enhance the risk identification of bridge projects. Secondly, the proposed SRBS can assist in the creation of a risk database to support the automation of the risk identification process for bridge projects to reduce manual efforts. Lastly, the proposed SRBS can be used as a risk ontology that could aid the development of an artificial intelligence-based integrated risk management system for construction projects.

  • PDF

A Fundamental Concept of Risk-Based Thinking and Risk Management for ISO 9001:2015 Certification (ISO 9001:2015 인증을 위한 리스크 기반 사고의 개념과 리스크 관리)

  • Kim, Ho Gyun;Kang, Byung Hwan;Park, Dong Joon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.3
    • /
    • pp.38-48
    • /
    • 2017
  • ISO 9001 Quality Management Systems-Requirements has been revised in 2015. It has been updated four times since its publication in 1987. It is the most widely used International Standard in the world. There are over one million companies and organizations in over 170 countries certified to ISO 9001 from an ISO survey. Organizations are supposed to be certified to this new version by late 2018. The key changes in ISO 9001:2015 are to establish a High Level Structure (HLS) and focus on Risk-Based Thinking (RBT). Risk-Based Thinking means the process approach to decide how risk is addressed in establishing the processes to improve process outputs and prevent undesirable results. It pursues process planning and controls based on risks so that organizations can improve the effectiveness of the quality management system. It maintains and manages a Quality Management System that inherently addresses risks and meets objectives. In this article we firstly attempt to explain how to understand the fundamental concept of Risk-Based Thinking which is a systematic approach to consider risks rather than treating prevention as a separate component of a Quality Management System. We comment on the detailed requirements that contain risks in ISO 9001:2015 clauses. We also summarize recent advances on the risk assessment and management in line with ISO 31000:2009 Risk Management-Principles and Guidelines. We finally propose the practical risk management procedures for implementing ISO 9001:2015 with an emphasis on RBT. This article would contribute to help quality managers and practitioners convert to ISO 9001:2015.

Improvement of Post-earthquake Risk Assesment System for Damaged Buildings by Case Study on '11.15 Earthquake' (11.15 지진 사례를 통한 지진피해 시설물 위험도 평가 체계 개선)

  • Kang, Hyeong Gu;Yun, Nu-Ri;Kim, David;Lee, Jung Han;Kim, Hye Won;Oh, Keum Ho
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.22 no.3
    • /
    • pp.185-191
    • /
    • 2018
  • Post-earthquake risk assessment technique in Korea is developed in 2013 by National Disaster Management Research Institute, at the same time, related manual and standard regulation is distributed to every local government by National Emergency Management Agency. The objectives of this research are to investigate and evaluate the post-earthquake risk assessment of 9.12 Earthquake (M5.8, Gyeongju City, 2016) and 11.15 Earthquake (M5.4, Pohang City, 2017). To suggest and improve the assessment process of post-earthquake risk, first post-earthquake risk assessment method of advanced foreign countries including US, New Zealand and Japan are compared, and post-earthquake evaluation activities in 9.12 Earthquake and 11.15 Earthquake are analyzed. From the results, it is needed to expand the adapted building and structure types and strengthen the earthquake disaster response capacity of local government.

The clinical application of dental caries management based on caries risk assessment and activation strategies (임상가를 위한 특집 3 - 우식위험도 평가에 근거한 치아우식증 관리의 임상적용 사례 및 활성화 방안)

  • Yoon, Hong-Cheol;Choi, Youn-Hee
    • The Journal of the Korean dental association
    • /
    • v.52 no.8
    • /
    • pp.472-477
    • /
    • 2014
  • The new paradigm of dentistry require the detection of caries in their earlier stages. To achieve this, a high technology detection device and systematic and organized caries management system are needed. Caries management by risk assessment (CAMBRA) model is representative caries management system that satisfied new paradigm. Dental caries prevention and treatment according to CAMBRA model is patient-centered, risk-based, evidence-based practice. Therefore, individual caries management such as CAMBRA should be performed through accurate assessment of caries disease indicators and comprehensive assessment of caries risk factors and protective factors. Based on the CAMBRA better effectiveness of comprehensive dental caries management including non-surgical treatment will be accomplished.

Semi-quantitative Risk Assessment using Bow-tie Method for the Establishment of Safety Management System of Hydrogen Fuel Storage Facility in a Combined Cycle Power Plant (복합화력발전소 내 수소연료 저장설비의 안전관리 체계 구축을 위한 Bow-tie 기법을 활용한 반정량적 위험성 평가)

  • Hee Kyung Park;Si Woo Jung;Yoo Jeong Choi;Min Chul Lee
    • Journal of the Korean Society of Safety
    • /
    • v.39 no.2
    • /
    • pp.75-86
    • /
    • 2024
  • Hydrogen has been selected as one of the key technologies for reducing CO2 emissions to achieve carbon neutrality by 2050. However, hydrogen safety issues should be fully guaranteed before the commercial and widespread utilization of hydrogen. Here, a bow-tie risk assessment is conducted for the hydrogen fuel supply system in a gas turbine power plant, which can be a mass consumption application of hydrogen. The bow-tie program is utilized for a qualitative risk assessment, allowing the analysis of the causes and consequences according to the stages of accidents. This study proposed an advanced bow-tie method, which includes the barrier criticality matrix and visualized maps of quantitative risk reduction. It is based on evaluating the importance of numerous barriers for the extent of their impact. In addition, it emphasizes the prioritization and concentrated management of high-importance barriers. The radar chart of a bow tie allows the visual comparison of risk levels before/after the application of barriers (safety measures). The risk reduction methods are semi-quantitatively analyzed utilizing the criticality matrix and radar chart, and risk factors from multiple aspects are derived. For establishing a secure hydrogen fuel storage system, the improvements suggested by the bow-tie risk assessment results, such as 'Ergonomic equipment design to prevent human error' and 'Emergency shutdown system,' will enhance the safety level. It attempts to contribute to the development and enhancement of an efficient safety management system by suggesting a method of calculating the importance of barriers based on the bow-tie risk assessment.