• Title/Summary/Keyword: national project

Search Result 5,235, Processing Time 0.04 seconds

Research on make-or-buy decision making strategy using system dynamics: Focused on Korea's military improvement project (시스템 다이내믹스를 이용한 제조-구매 결정 전략: 한국의 방위력 개선 사업을 중심으로)

  • Choi, Jeong-Hwan;Ko, Seong-Pil;Lee, Jeong-Dong
    • Korean System Dynamics Review
    • /
    • v.13 no.1
    • /
    • pp.159-182
    • /
    • 2012
  • Strategic decision on the execution of national security improvement project is greatly important for the present and future national security. Though, the importance of strategic decision, decision making process has been executed under one-way thinking framework. This research provides a decision-making tool with make-or-buy approach for the national security improvement policy execution methods: foreign purchase and military R&D project, and, via simulation, confirms dynamic change of military capability index respect to change in ratio of foreign purchase and military R&D. A result shows that current ratio of foreign purchases and military R&D is insufficient for national security improvement policy goal. Applying the model from this research provides an appropriate ratio for short term and long term defense strategy and policy goal, and consequent result of increase in national security capability. Thus, this research model can be effectively utilized for national security improvement project.

  • PDF

The Project Management Information System for the Work Efficiency Improvement (업무 효율 향상을 위한 사업관리정보시스템)

  • Ryu, Jee-Woong;Song, Jong-Cheol;Moon, Byung-Joo;Jung, Hoe-Kyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.1
    • /
    • pp.18-24
    • /
    • 2014
  • For successful projects, Project Management Information System(PMIS) using the formal systematic processes is necessary. Because the existing PMIS focuses on low-level project management, the life-cycle administration of the projects is required. In this dissertation, I describe not only the processes for managing a project with the top-down approach(a hierarchical goal setting of the project outcome), but also PMIS which can control whole processes of R&D projects. The PMIS described in this dissertation can reduce the workload of project management by providing user-adaptive environments and linking with related systems, so can be helpful to enhance the efficiency of the project management. And, it is expected that these processes can be the standard project management processes which are adaptive to various types of projects.

Robotics Projects at Pusan National University

  • Kwak, Seung-Chul;Sung, Ji-Hoon;Shim, In-Bo;Yoon, Joong-Sun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.814-819
    • /
    • 2004
  • Soft engineering, based on symbiotic coexistence of human, machines and environment, is a new engineering field to explore the proper technology and the proper way of engineering. To explore soft engineering intents easily, various robot projects at Pusan National University conducted are presented. Thought experiment, interactive e-leaning, rapid prototyping engineering, biomimciry, tangibility, and ubiquity are concepts to be explored. Thought experiments projects are organized and performed, which include robot assembly game, Turing test, and robotics in science fiction. "Junk robot project" and "ubiquitous Pusan National University (u-PNU) project" have been organized. Also, bug robot project, interactive robot project, and interactive emotional robot projects are introduced. Weekly science fiction films are shown and discussed.

  • PDF

Feasibility Study on Environment-friendly Project to Improve Habitability in National Rental Apartment - focused on Gwangju City - (국민임대주택 주거환경 개선을 위한 친환경사업의 타당성 분석 - 광주광역시를 대상으로 -)

  • Park, Hyeon-Ku;Lee, Hyun-Chul
    • Journal of the Korean housing association
    • /
    • v.20 no.5
    • /
    • pp.23-30
    • /
    • 2009
  • In case of national rental apartment, habitability is generally evaluated low comparing with typical apartments. So, researches and investment are required to increase the residential environment. In this point of view, present study aims to suggest the basic data for improvement of homeless masses' dwelling level through economic feasibility analysis. Firstly national rental apartment, which habitability is considered to be low in the point of environment-friendly, welfare, and convenience, is chosen as objective. Secondly environment-friendly project items including project flow were set up, and then basic model was formed to evaluate economic feasibility through priority survey to residents. In result, priority for two items among six different proposals were higher than the others. This result could be useful when trying to increase the dwelling level of national rental apartment being planned to construct in future.

Echocardiographic features of indirect Gerbode defect in a cat

  • Lee, Sang-Kwon;Lee, Namsoon;Cho, Kyoung-Oh;Soliman, Mahmoud;Yun, Munsu;Choi, Jihye
    • Korean Journal of Veterinary Research
    • /
    • v.59 no.3
    • /
    • pp.161-163
    • /
    • 2019
  • This report describes the echocardiographic features of an indirect Gerbode defect in a young cat. Echocardiography revealed high-velocity, turbulent systolic flow directed from left ventricle to right ventricle through a ventricular septal defect. The flow immediately entered the right atrium through a tricuspid septal leaflet. The indirect-type Gerbode defect was confirmed through necropsy. When a high-velocity turbulent flow in the RA without pulmonary hypertension is observed on echocardiography, Gerbode defect should be considered.

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

A METHOD OF REVISING RETRIEVED SIMILAR CASES IN GA-CBR COST MODELS

  • Sooyoung Kim;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Joseph Ahn
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.182-186
    • /
    • 2011
  • Early cost estimates are important to decision-making for a construction project. Moreover, the possibility of reducing the project cost is getting less as the project is progressed. Case-based reasoning (CBR), which can be viewed as an effective method for early cost estimating, is widely utilized recently. Early cost estimates using CBR have advantages over the traditional ones as they produce reasonable outputs and self-studying is possible by simply adding new cases. Case-based reasoning is composed of a cycle of retrieve, reuse, revise, and retain process. However, in the majority of research cases, they are focused on how to retrieve the similar cases, instead of revising the cases which is expected to increase accuracy results of cost estimation. This research suggests a method of revising retrieved similar cases in a GA-CBR cost model which is widely studied and utilized for early cost estimating recently. To validate the proposed method, case study is conducted based on Korean public apartment projects.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

Using Real Options Pricing to Value Public R&D Investment in the Deep Seabed Manganese Nodule Project

  • Choi, Hyo-Yeon;Kwak, Seung-Jun;Yoo, Seung-Hoon
    • Asian Journal of Innovation and Policy
    • /
    • v.5 no.2
    • /
    • pp.197-207
    • /
    • 2016
  • This paper seeks to measure the monetary value of technical development in the deep seabed manganese nodule mining by applying the compound option model (COM). The COM is appropriate for the project in terms of its decision-making structure and embedded uncertainty. The estimation results show that the deep seabed mining project has more economic potential than shown by the previously obtained results from the discounted cash flow (DCF) analysis. In addition, it is reasonable to invest in the project taking the various uncertainty factors into consideration, because the ratio of the value to the cost of the project is far higher than one. This information can be utilized in national ocean policy decision-making.

Optimal growth conditions and economic analysis of sea cucumber releasing

  • Lee, Cheol;Choi, Sang Duk
    • Fisheries and Aquatic Sciences
    • /
    • v.23 no.4
    • /
    • pp.11.1-11.11
    • /
    • 2020
  • We tried to find the optimal growth conditions of sea cucumber and to analyze the economic effectiveness of the sea cucumber seedling release project in Korea. We first examined the optimal growth conditions of sea cucumber in the relating literatures. Then, we analyzed the economic effectiveness of the sea cucumber seedling release project of the Woncheon fishing village union of Gyeongnam Province in 2016-2018 by using the cost benefit analysis method. The net income of the release project of the Woncheon fishing village union was 69,850 Korean won. The benefit to cost ratio of the sea cucumber seedling release project of the Woncheon fishing village union was estimated to be 1.7, indicating that the project was economically feasible. In order to improve the economic feasibility of the sea cucumber release project, as we see in the case of the Woncheon fishing village union, it is necessary to manage the purchase of the sea cucumber seedling, to improve the recapture rate of sea cucumber, and to manage marketing of sea cucumber.