Park, Jeongmook;Lee, Yongkyu;Lim, Byeongmin;Lee, Jungsoo
Journal of Forest and Environmental Science
/
v.36
no.3
/
pp.187-198
/
2020
This study extracted deforestation area and degraded forestland area, which are potential REDD+ (Reducing Emissions from Deforestation and Forest Degradation) project candidate areas in Paraguay using Land Cover Map (LCM) and Tree Cover Map (TCM). The REDD+ project objectives scenarios were set three stages: 'afforestation and economic efficiency scenario', 'local capacity reinforcement scenario', and 'Infrastructure-oriented scenario'. And then, we evaluated the project unit suitable area of the REDD+ project. All scenarios selected the evaluation factors for each scenario in addition to the area ratio factors for deforestation area and degraded forestland area and weighted values were extracted by assigning category scores. As a result of the three scenarios comparison analysis, Concepcion state score was the highest. Within Concepcion state, the Belon district had the highest score, making it appropriate as a project unit REDD+ project candidate area in Paraguay, while the San Carlos district had the lowest score. This study can be used as basic data for selecting REDD+ project candidate area in Paraguay, and it is expected to contribute sufficiently to REDD+ project if additional data or information of social, cultural and economic sectors are secured.
International conference on construction engineering and project management
/
2009.05a
/
pp.841-846
/
2009
Recently, the construction industry is getting more complex and sophisticated having the characteristics of a mega project. Mega project pursues a value that can't be gained with an approach of seeing a project as just a simple sum of different parts but a mutual combination. However, the current manuals can't fulfill the needs for supporting, therefore, need a tool to support the decision making and an IETM is expected to take this role. Despite the a lot of expected advantages of IETM, it is still difficult to apply because of the frequent changes of information of detailed process and its complexity. In this research, as part of developing an IETM, we aim to propose a system frame which is based on the analysis of processes of a project. It is basic part of IETM to give information to users and IETM consists of normal mode that offers general information about the urban regeneration project and user-specified mode that gives classified and reorganized information to user. For supporting these functions, IETM should be stored in a form that can classify the information about urban regeneration project and be tagged with meaningful tags. Moreover IETM developers have to consider the interoperability of IETM because it ultimately should be coordinated with overall Project Management System like an iPMIS. We used XML for solution of interoperability because it stores information as just text-file that doesn't need a special form.
This study aims to survey whether local governments have legislated laws and regulations on environment impact assessment system, to compare and analyze specific projects and their scale, assessment items, and procedures & discussion process, to identify issues and generate improvement plans, and to suggest a direction for future legislation to local governments that plan to legislate laws and regulations in the future. Major outcome of the study are as follows. First, terminologies used for environment impact assessment by local governments need to be unified. Also, laws and regulations need to be legislated soon. Second, in "urban development project" areas, a total of nine project areas including "quarrying of soil and stone, sand, gravel, and minerals" was essential common projects. A total of six project types were added or newly established compared to national systems. Among them, four project types were added within national-level project areas and two project types were not available under the national-level project areas and newly added due to the nature of local governments. Third, in terms of project scale, scale enhancement of "urban development project" was most common. Analysis showed that in case of clean natural environment such as Cheju Island, it is necessary to consider reinforcing project areas where development activities take place directly in forests or rivers such as "industrial base and complex development", "water resource development", and "development of tourism complex." Fourth, the discussion and review procedures of assessment reports were similar to those at government level. However, in case of Seoul city, it is required to write a "preparation plan" before drafting an assessment report. The city features partial introduction of scoping and screening, which allows to exempt discussion procedures if impact on environment is found to be minimal after drafting the assessment report. In case of national-level, it has a dual system that is split between Ministry of Construction and Transportation and Ministry of Environment. However, in case of environment impact assessment of local governments, it is a single system where city mayors and provincial governors are in charge of both project execution and environmental assessment. Therefore, the most important task is how to satisfy objectiveness and accountability.
Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
International conference on construction engineering and project management
/
2015.10a
/
pp.612-613
/
2015
As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.
Ji, Seung-Yong;Lee, Sang-Hyuk;Lee, Oh-Kyu;Choi, Jaeyong
Korean Journal of Agricultural Science
/
v.43
no.2
/
pp.288-297
/
2016
This study is to evaluate the 'Private antidesertification afforestation support project' in the Kubuqi Desert through a survey of local residents and interviews with relevant personnel. Based on this survey, gender, age, and occupational differences in perception of the project were analyzed. In addition, the project was evaluated based on the OECD/DAC criteria using survey results and in-depth interviews with the relevant personnel. The survey analysis results show that the participants answered most of the questions positively, claiming that they were receiving social, economic, and environmental benefits through the project. However, most of the participants answered negatively to questions regarding the understanding of the project and relevant information. Gender differences in perception of the project were not found, whereas, age and occupational differences in perception were found. Older age groups showed higher levels of perception. Participants in the agro-livestock industry and office workers showed higher levels of perception compared to middle/high school students, the unemployed and college students. Teenagers, in particular, showed the lowest level of perception of the project, and thus, promotional activities targeting teenagers should be conducted in the future. Results of this evaluation of the project based on the OECD/DAC's five criteria (relevance, effectiveness, efficiency, impact, and sustainability) showed that the project operated effectively for the most part.
International conference on construction engineering and project management
/
2011.02a
/
pp.324-329
/
2011
Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.
Journal of the Korean Society of Systems Engineering
/
v.7
no.2
/
pp.21-30
/
2011
The contractor management for the effective defense project is essential factor in the modern defense acquisition project. The occurrence of Improper Businessman causes the reason in which defense acquisition project is unable to be reasonably fulfilled and setback to the deployment of defense weapon system. In this paper, we develop a prediction model for the effective defense project by using the Discriminant Analysis, the Logistic Regression & Artificial Neural Network and analyse the core variables that determine the Improper Businessman in many variables. It is expected that our model can be used to improve the project management capability of defense acquisition and contribute to the establishment of efficient procurement procedure through entry of the reliable domestic manufacturer.
International conference on construction engineering and project management
/
2013.01a
/
pp.648-651
/
2013
The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.