• Title/Summary/Keyword: national project

Search Result 5,204, Processing Time 0.033 seconds

Assessment of REDD+ Suitable Area for Sustainable Forest Management in Paraguay

  • Park, Jeongmook;Lee, Yongkyu;Lim, Byeongmin;Lee, Jungsoo
    • Journal of Forest and Environmental Science
    • /
    • v.36 no.3
    • /
    • pp.187-198
    • /
    • 2020
  • This study extracted deforestation area and degraded forestland area, which are potential REDD+ (Reducing Emissions from Deforestation and Forest Degradation) project candidate areas in Paraguay using Land Cover Map (LCM) and Tree Cover Map (TCM). The REDD+ project objectives scenarios were set three stages: 'afforestation and economic efficiency scenario', 'local capacity reinforcement scenario', and 'Infrastructure-oriented scenario'. And then, we evaluated the project unit suitable area of the REDD+ project. All scenarios selected the evaluation factors for each scenario in addition to the area ratio factors for deforestation area and degraded forestland area and weighted values were extracted by assigning category scores. As a result of the three scenarios comparison analysis, Concepcion state score was the highest. Within Concepcion state, the Belon district had the highest score, making it appropriate as a project unit REDD+ project candidate area in Paraguay, while the San Carlos district had the lowest score. This study can be used as basic data for selecting REDD+ project candidate area in Paraguay, and it is expected to contribute sufficiently to REDD+ project if additional data or information of social, cultural and economic sectors are secured.

XML-based Information Model for Interactive Electronic Technical Manual for Urban Regeneration Project

  • Sunghoon Kang;Hyun-Soo Lee;Moonseo Park;Jin-Wook Jung
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.841-846
    • /
    • 2009
  • Recently, the construction industry is getting more complex and sophisticated having the characteristics of a mega project. Mega project pursues a value that can't be gained with an approach of seeing a project as just a simple sum of different parts but a mutual combination. However, the current manuals can't fulfill the needs for supporting, therefore, need a tool to support the decision making and an IETM is expected to take this role. Despite the a lot of expected advantages of IETM, it is still difficult to apply because of the frequent changes of information of detailed process and its complexity. In this research, as part of developing an IETM, we aim to propose a system frame which is based on the analysis of processes of a project. It is basic part of IETM to give information to users and IETM consists of normal mode that offers general information about the urban regeneration project and user-specified mode that gives classified and reorganized information to user. For supporting these functions, IETM should be stored in a form that can classify the information about urban regeneration project and be tagged with meaningful tags. Moreover IETM developers have to consider the interoperability of IETM because it ultimately should be coordinated with overall Project Management System like an iPMIS. We used XML for solution of interoperability because it stores information as just text-file that doesn't need a special form.

  • PDF

A Comparative Study on the Local Governments' Environmental Impact Assessment Regulations in Korea (지방자치단체 환경영향평가 조례 비교 연구)

  • Sung, Hyun-Chan;Min, Soo-Hyun
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.3
    • /
    • pp.137-150
    • /
    • 2003
  • This study aims to survey whether local governments have legislated laws and regulations on environment impact assessment system, to compare and analyze specific projects and their scale, assessment items, and procedures & discussion process, to identify issues and generate improvement plans, and to suggest a direction for future legislation to local governments that plan to legislate laws and regulations in the future. Major outcome of the study are as follows. First, terminologies used for environment impact assessment by local governments need to be unified. Also, laws and regulations need to be legislated soon. Second, in "urban development project" areas, a total of nine project areas including "quarrying of soil and stone, sand, gravel, and minerals" was essential common projects. A total of six project types were added or newly established compared to national systems. Among them, four project types were added within national-level project areas and two project types were not available under the national-level project areas and newly added due to the nature of local governments. Third, in terms of project scale, scale enhancement of "urban development project" was most common. Analysis showed that in case of clean natural environment such as Cheju Island, it is necessary to consider reinforcing project areas where development activities take place directly in forests or rivers such as "industrial base and complex development", "water resource development", and "development of tourism complex." Fourth, the discussion and review procedures of assessment reports were similar to those at government level. However, in case of Seoul city, it is required to write a "preparation plan" before drafting an assessment report. The city features partial introduction of scoping and screening, which allows to exempt discussion procedures if impact on environment is found to be minimal after drafting the assessment report. In case of national-level, it has a dual system that is split between Ministry of Construction and Transportation and Ministry of Environment. However, in case of environment impact assessment of local governments, it is a single system where city mayors and provincial governors are in charge of both project execution and environmental assessment. Therefore, the most important task is how to satisfy objectiveness and accountability.

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

A survey on the perception of China private antidesertification afforestation support project and evaluation

  • Ji, Seung-Yong;Lee, Sang-Hyuk;Lee, Oh-Kyu;Choi, Jaeyong
    • Korean Journal of Agricultural Science
    • /
    • v.43 no.2
    • /
    • pp.288-297
    • /
    • 2016
  • This study is to evaluate the 'Private antidesertification afforestation support project' in the Kubuqi Desert through a survey of local residents and interviews with relevant personnel. Based on this survey, gender, age, and occupational differences in perception of the project were analyzed. In addition, the project was evaluated based on the OECD/DAC criteria using survey results and in-depth interviews with the relevant personnel. The survey analysis results show that the participants answered most of the questions positively, claiming that they were receiving social, economic, and environmental benefits through the project. However, most of the participants answered negatively to questions regarding the understanding of the project and relevant information. Gender differences in perception of the project were not found, whereas, age and occupational differences in perception were found. Older age groups showed higher levels of perception. Participants in the agro-livestock industry and office workers showed higher levels of perception compared to middle/high school students, the unemployed and college students. Teenagers, in particular, showed the lowest level of perception of the project, and thus, promotional activities targeting teenagers should be conducted in the future. Results of this evaluation of the project based on the OECD/DAC's five criteria (relevance, effectiveness, efficiency, impact, and sustainability) showed that the project operated effectively for the most part.

BENCHMARKING THE PREPROJECT PLANNING PRACTICE FOR THE BUILDING CONSTRUCTION INDUSTRY IN TAIWAN

  • Yu-Ren Wang;Yi-Jao Chen;Chun-Yin Yu;Shin-Si Jang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.324-329
    • /
    • 2011
  • Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.

  • PDF

Statistical Approach for the Prediction of Improper Businessman in Defense Procurement

  • Han, Hongkyu;Choi, Seokcheol
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.21-30
    • /
    • 2011
  • The contractor management for the effective defense project is essential factor in the modern defense acquisition project. The occurrence of Improper Businessman causes the reason in which defense acquisition project is unable to be reasonably fulfilled and setback to the deployment of defense weapon system. In this paper, we develop a prediction model for the effective defense project by using the Discriminant Analysis, the Logistic Regression & Artificial Neural Network and analyse the core variables that determine the Improper Businessman in many variables. It is expected that our model can be used to improve the project management capability of defense acquisition and contribute to the establishment of efficient procurement procedure through entry of the reliable domestic manufacturer.

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF