• 제목/요약/키워드: multi-trade

검색결과 357건 처리시간 0.024초

Multi-trade Prefabrication 기법 적용을 위한 기술적 요구사항 분석 (Analysis of Technical Requirement for Implementation of Multi-trade Prefabrication)

  • 장세준;이강
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.113-114
    • /
    • 2016
  • This paper proposes a technical requirements analysis of implementation of multi-trade prefabrication. Recently, there has been a rise in the use of prefabrication to minimize on-site work for time reduction to increase productivity. Prefabrication technique is evolved into multi-trade prefabrication combining other trades from single-trade prefabrication. For implementation of new technique, not only itself but complementary techniques have to be prepared. In this paper, MEP corridor rack, a major item of multi-trade prefabrication, was implemented in the test bed and its process was analyzed to find out technical requirements. As a result, comparatively high level of IT technique was required for efficient use of multi-trade prefabrication in design, lifting and construction phase. In design phase, component level of BIM library was needed for manufacturing; and in lifting phase, BIM-based site logistics process was required. Also in construction phase, laser scanning was implemented for gathering shape and geometry of the wall and slab that were attached to multi-trade prefabrication module.

  • PDF

다중 속성 협상과 상호 이익을 위한 중개 에이전트 시스템 (Mediator Agent System for Reciprocity and Negotiation using Multi-attributes)

  • 박상현;양성봉
    • 한국정보과학회논문지:소프트웨어및응용
    • /
    • 제31권3호
    • /
    • pp.308-316
    • /
    • 2004
  • 본 논문에서는 일반적인 상거래에서와는 다른 전자상거래 환경의 특성을 바탕으로 구매자와 판매자의 상거래에서 양자간 최대이익을 제공해 줄 수 있는 중개 에이전트 시스템을 제안하였다. 판매자와 구매자의 상거래를 통하여 얻을 수 있는 최적의 타협안은 어느 한쪽으로 이익이 치우치지 않고 양자간 이익의 합이 최대가 되는 제안으로 정의하였다. 중개 에이전트는 상품의 다중 속성을 고려하여 협상을 수행하며, 구매자와 판매자의 이익은 Multi Attribute Utility Theory(MAUT)를 이용하여 표현하였다. 중개 에이전트를 이용한 협상 과정은 협상에 참여한 구매자와 판매자의 협상 정보를 이용하여 정수계획법으로 모형화 하였다. 중개 에이전트 시스템과의 비교를 위하여 상호이익의 보장이라는 동일한 조건 하에서, 구매자와 판매자에이전트 사이의 상호작용을 이용한 협상 알고리즘의 하나인 trade-off mechanism을 적용하여 협상 시스템을 구현하였다. Trade-off mechanism에 의한 타협안의 경우 최적간을 보장하지 못하는 반면 중개 에이전트 시스템에 의한 타협안은 상대적으로 빠른 시간 내에 양자간 최대 이익을 제공하는 최적의 타협안을 보장해 주었다.

복합공종 MEP 천정 선조립 공법 사례조사를 통한 단계별 중점관리사항 도출 (Deriving Critical Management Factors based on Case Studies of Multi-trade MEP Ceiling Rack Prefabrication)

  • 이동민;장세준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.76-77
    • /
    • 2015
  • In construction industry, management of construction factors such as cost, schedule, quality and safety is the most important key for delivering successful projects. According to the Smart Market Report, a magazine specialized in construction industry, recently said 'Off-site Prefabrication' is a significant trend related with construction productivity in global construction industry. It is a kind of practice shift from On-site to Off-site. A lot of general contractors in oversea have been using 'Multi-trade MEP Ceiling Rack Prefabrication' method for getting benefits such as decreased cost & schedule and increased labor productivity. Thus, in this paper, critical management factors at each phase from design to installation was derived by researching case studies. Forwardly, it can be a basic guideline for applying Multi-trade MEP Ceiling Rack Prefabrication in Korea construction industry.

  • PDF

주거시설공사의 하도급 통합발주 프로세스 개발 (Integrating Order Process in Residential Building Construction)

  • 김용원;박형진;정진현;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.84-85
    • /
    • 2013
  • Integrating multi-trade works system helps to reduce to minimize the conflict of subcontract business and improve communication to increase productivity of construction. However it takes such a big risk if subcontract of integrating multi-trade works went bankrupt during the project so some of construction companies executed to only small project and it's not sufficient to adopt overall project. This paper suggested the improvement scheme of work classification integrating multi-trade works, which takes a consideration into work zoning in order to apply current work situation.

  • PDF

Macroeconomic Buffer Effects of Mega-FTA Formation: A CGE Analysis for Korea

  • Jung, Jae-Won;Kim, Tae-Hwang
    • Journal of Korea Trade
    • /
    • 제23권3호
    • /
    • pp.118-137
    • /
    • 2019
  • Purpose - As global trade disputes intensify and global trade uncertainty increases due to the prevailing trade protectionism all over the world, mega-FTAs such as the RCEP and CPTPP are suggested as strategic trade policy options for export-driven small open economies, such as Korea. This paper aims to provide a comprehensive analysis of Korea's mega-FTA participation and the induced implications for the Korean economy. Design/methodology - We use a multi-region, multi-sector global CGE model, and investigate the different effects of both the US-China and US-EU trade wars on the relative changes in GDP, welfare, and trade under different trade policy regimes; (i) Korea does not participate in any mega-FTA, (ii) Korea participates in the RCEP, and (iii) Korea participates in the CPTPP. Findings - We show, among others, that though industrial effects might be largely varied, the overall enlarging of free trade zones through multilateral mega-FTA participation may contribute significantly to the macroeconomic soundness and stability of Korea, even when global trade protectionism prevails. Under RCEP and CPTPP trade regimes, Korea's GDP may increase even when the global trade environment deteriorates as trade wars occur and intensify between the US and China, or between the US and EU. It is also estimated that RCEP participation increases Korea's GDP, welfare (measured in equivalent variation), and total trade by 1.12%, $1.09 billion, and 2.54%, respectively, while CPTPP participation increases them by 0.19%, $0.92 billion, and 0.13%, respectively. Originality/value - Existing studies usually focus on the direct impacts of mega-FTA participation on macroeconomic variables such as GDP, welfare, and trade, and do not consider the possible buffer effects of a mega-FTA when the global trade environment worsens. In this paper, we analyze and quantify not only the direct impacts of RCEP and CPTPP on the main macroeconomic variables but also the possible buffer effects of the RCEP and CPTPP in the cases of the US-China and US-EU trade wars.

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • 제71권2호
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

다공종 통합발주방식 적용을 위한 통합공종 규명에 관한 연구 (Definition of an Integrated Contract Package for Application of Multi-Trade Subcontract System)

  • 송형석;김균태;한충희;김선국
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.385-388
    • /
    • 2002
  • 다수의 공사수행주체가 복잡한 생산프로세스 내에 존재하는 건설산업의 특성상 참여주체간에 발생하는 문제와 공정 간섭은 생산성 저하의 주된 원인이 된다. 이를 해결하기 위해 최근에 '다공종 통합발주방식'이 제안되었고 일부 대형업체를 중심으로 시범 운영되고 있다. 그러나 통합발주는 아직 제안 초기단계로 실질적인 시행을 위해서는 다양한 기초연구가 선행될 필요가 있다. 따라서 본 연구에서는 통합발주를 시행하여 원${\cdot}$하도급업체 모두가 효율성을 증진시킬 수 있는 작업요소를 규명하고자 한다. 이는 건설업 전반에 통합발주의 필요성을 인식시키고, 통합발주 시행 시에 다수의 공종을 통합하는 기준을 제공할 수 있을 것으로 기대된다.

  • PDF

배출권거래제 하에서 단일 제조업자-다소매업자의 공급사슬에서 다품목의 재고모형 (Single Manufacturer and Multiple Retailers Multi-Product Inventory Model under Cap-and-Trade Mechanism)

  • 김대홍
    • 산업경영시스템학회지
    • /
    • 제42권1호
    • /
    • pp.158-166
    • /
    • 2019
  • In pursuing carbon emission reduction efforts, companies have focused for the most part on reducing emissions due to the more efficient equipment and facilities. However they overlook a significant source of carbon emissions, one that is driven by operational policies. Currently companies are looking for solutions to reduce carbon emissions associated with their operations. Operational adjustments, such as modifications in order quantities could an effective way in reducing carbon emissions in the supply chain. Also, Cap-and-Trade mechanism is generally accepted as on of the most effective market-based mechanism to reduce carbon emissions. In this paper, we investigate a supply chain with single manufacturer and multiple retailers multi-product inventory model under the cap-and-trade system incorporating the carbon emissions caused by transportation and warehousing activities. Also, we provide an iterative solution algorithm and derive the common order interval and the number of intervals for each product. We show by numerical example that the inventory model incorporating cap & trade mechanism can reduce total cost and carbon emissions compared to the classical inventory model. Using the numerical examples, we also investigates different carbon price on the performance of the inventory model.

배출권거래제 하에서 2단계 공급사슬에서 다품목의 통합재고모형 (An Integrated Multi-Product Inventory Model for a Two-Echelon Supply Chain under Cap-and-Trade Mechanism)

  • 김대홍
    • 산업경영시스템학회지
    • /
    • 제42권4호
    • /
    • pp.61-68
    • /
    • 2019
  • Currently many companies are interested in reduction of the carbon emissions associated with their supply chain activities such as transportation and operations. Operational decisions, such as modifications in order quantities could an effective way in reducing carbon emissions in the supply chain. Cap-and-trade regulation, sometimes called emissions trading, is a market-based tool to limit greenhouse gas emissions. Under cap-and-trade regulation, emission credits are allocated to the firms and the firms trades emissions under cap-and-trade schemes. In this paper, we propose a single-manufacturer single-buyer two-echelon supply chain problem under the cap-and-trade mechanism incorporating the carbon emissions caused by transportation and warehousing activities where a single manufacturer produces a family of items in order to deliver a family of items to a single buyer at a fixed interval of time for effective implementation of Just-In-Time (JIT) Purchasing. An integrated multi-product lot-splitting model of facilitating multiple shipments in small lots between buyer and manufacturer is developed in a JIT Purchasing environment. Also, an iterative heuristic algorithm is developed to derive the common order interval, the number of intervals for each product and the number of shipments between the buyer and the manufacturer during the common interval. A numerical example is given to illustrate the savings in reduction of total cost and carbon emissions by the inventory model incorporating cap-and-trade mechanism compared to the classical inventory model. The proposed inventory model could be useful for the practical solution of two-echelon supply chain inventory problem under cap-and-trade mechanism.

공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안 (Efficient Application of Multi-Trade Contract Method to Public Construction Project)

  • 장철기
    • 한국건설관리학회논문집
    • /
    • 제14권2호
    • /
    • pp.35-44
    • /
    • 2013
  • 보금자리주택 건설에서 분양가 인하의 하나의 방안으로 직할시공제가 도입되었다. 특정 발주방식을 대규모 공공건설사업에 적용 할 경우 본격적인 적용이전에 해당 발주방식에 대한 각계의 논의를 수렴하고 해당 발주방식이 사업성과에 미치는 영향을 다각도로 분석할 필요가 있다. 이에 본 연구에서는 공공건설사업에의 직할시공제 적용에 따른 공사비, 공사기간, 품질, 리스크 등 사업성과에 미치는 영향을 전문가 면담과 해외사례 조사를 통해 분석하고, 이러한 문제점들을 해결하고 공공건설사업에의 직할시공제의 효율적 적용을 위한 방안을 제시하였다. 먼저 직할시공제하에서는 발주자의 업무가 대폭적으로 증가하므로 해당 공공발주자 조직에서 증가된 업무 수행이 가능한지를 점검해야 하고, 이에 따른 발주자 조직과 업무절차의 변화가 필요하다. 아울러 직할시공제의 효율적 적용을 위해 다중시공기반 CM방식 등 다양한 수행방식을 적용 할 필요가 있으며, 공사관리 절차 및 시스템 구축, 협력업체 강화 등이 필요하다.