• 제목/요약/키워드: multi-heuristic algorithm

검색결과 169건 처리시간 0.028초

복수모기지의 항공기 운항계획및 승무계획 문제의 발견적 기법 (Greedy Heuristic Algorithm for a Multidepot Aircraft Scheduling and Crew Scheduling Problem)

  • 장병만;박순달
    • 대한산업공학회지
    • /
    • 제11권2호
    • /
    • pp.155-163
    • /
    • 1985
  • This paper presents a heuristic algorithm for a multidepot aircraft scheduling and crew scheduling with deal-head flights. This algorithm is extended from a Greedy heuristic algorithm for a multi-depot multi-salesman traveling salesman problem. We first transform a given flight schedule into a multi-depot multi-traveling salesman problem, considering aircraft flight policies and crew management constraints. Then we solve this problem by applying a modified Greedy heuristic algorithm.

  • PDF

종속적 준비시간을 갖는 다단계 그룹가공 생산시스템에서의 그룹스케듈링에 관한 연구 (On the Multi-Stage Group Scheduling with Dependent Setup Time)

  • 황문영
    • 산업경영시스템학회지
    • /
    • 제17권31호
    • /
    • pp.115-123
    • /
    • 1994
  • Group scheduling, which is a kind of operations scheduling based on the GT concept is analyzed in a multi-stage manufacturing system. The purpose of this research is to develop and evaluate a heuristic algorithm for determining gro up sequence and job sequence within each group to minimize a complex cost function, i.e. the sum of the total pe-nalty cost for tardiness and the total holding cost for flow time, in a multi-stage manufacturing system with group setup time dependent upon group sequence. A heuristic algorithm for group sc heduling is developed, and a numerical example is illustrated. For the evaluation of the pro-posed heuristic algorithm, the heuristic solution of each of 63 problems is compared with that of random scheduling. The result shows that the proposed heuristic algorithm provides better solution in light of the proposed cost function.

  • PDF

복합 휴리스틱 알고리즘을 이용한 지대공 유도무기 최적배치 모형 : 항공기 방어를 중심으로 (The Optimal Allocation Model for SAM Using Multi-Heuristic Algorithm : Focused on Aircraft Defense)

  • 곽기훈;이재영;정치영
    • 한국경영과학회지
    • /
    • 제34권4호
    • /
    • pp.43-56
    • /
    • 2009
  • In korean peninsular, aircraft defense with SAM (Surface-to-Air Missile) is very important because of short range of combat space in depth. Effective and successful defense operation largely depends on two factors, SAM's location and the number of SAM for each target based on missile's availability in each SAM's location. However, most previous papers have handled only the former. In this paper, we developed Set covering model which can handle both factors simultaneously and Multi-heuristic algorithm for solving allocation problem of the batteries and missile assignment problem in each battery. Genetic algorithm is used to decide optimal location of the batteries. To determine the number of SAM, a heuristic algorithm is applied for solving missile assignment problem. If the proposed model is applied to allocation of SAM, it will improve the effectiveness of air defense operations.

복합-휴리스틱 알고리즘을 이용한 지대공 유도무기(SAM) 최적배치 방안 : 탄도미사일 방어를 중심으로 (The Optimal Allocation Model for SAM Using Multi-Heuristic Algorithm : Focused on Theater Ballistic Missile Defense)

  • 이재영;곽기훈
    • 산업공학
    • /
    • 제21권3호
    • /
    • pp.262-273
    • /
    • 2008
  • In Korean peninsular, Air Defense with SAM(Surface-to-Air Missile) is very important, because of threatening by North Korea's theater ballistic missiles installed with nuclear or biochemistry. Effective and successful defense operation largely depends on two factors, SAM's location and the number of SAM for each target based on missile's availability in each SAM's location. However, most previous papers have handled only the former. In this paper, we developed Multi-heuristic algorithm which can handle both factors simultaneously for solving allocation problem of the batteries and missile assignment problem in each battery. To solve allocation problem, genetic algorithm is used to decide location of the batteries. To solve missile assignment problem, a heuristic algorithm is applied to determine the number of SAM for each target. If the proposed model is applied to allocation of SAM, it will improve the effectiveness of missile defense operations.

자원제약하의 다단계 다품목 공급사슬망 생산계획을 위한 휴리스틱 알고리즘 (A Hybrid Heuristic Approach for Supply Chain Planningwith n Multi-Level Multi-Item Capacitated Lot Sizing Model)

  • 신현준
    • 한국산학기술학회논문지
    • /
    • 제7권1호
    • /
    • pp.89-95
    • /
    • 2006
  • 공급사슬망에서 분산되어있는 제조시스템에 대한 생산 계획수립은 공급사슬관리의 주요 연구분야 중의 하나이다. 본 논문은 공급사슬망에서 자원제약을 갖는 다단계 다품목 로트사이즈 결정 문제(Multi-Level, multi-item Capacitated Lot Sizing Problem: MLCLSP)를 위한 알고리즘을 제시한다. MLCLSP는 MIP(mixed integer program) 문제에 해당한다. 제안된 알고리즘은 휴리스틱과 최적화 패키지인 LINGO를 이용해 서로 반복적인 방식으로 해를 풀어나가는 혼성적인 성격을 갖는다. 휴리스틱을 이용하여 정수형 변수를 결정한 후, 얻게 되는 LP(linear program) 문제를 LINGO를 이용하여 해를 개선해 나가는 방식을 기본으로 한다. 본 논문에서는 탐색 휴리스틱 기법으로 임의 재시작 타부탐색 알고리즘을 제시한다. 다양한 시나리오의 실험을 통해 제안된 알고리즘들의 성능을 평가한다.

  • PDF

시간제약을 가진 다회방문 차량경로문제에 대한 휴리스틱 알고리즘 (A heuristic algorithm for the multi-trip vehicle routing problem with time windows)

  • 김미이;이영훈
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.1740-1745
    • /
    • 2006
  • This paper is concerned with a novel heuristic algorithm for the multi-trip vehicle routing problem with time windows. The objective function is the minimization of total vehicle operating time, fixed cost of vehicle and the minimization of total lateness of customer. A mixed integer programming formulation and a heuristic algorithm for a practical use are suggested. A heuristic algorithm is constructed two phases such as clustering and routing. Clustering is progressed in order to assign appropriate vehicle to customer, and then vehicle trip and route are decided considering traveling distance and time window. It is shown that the suggested heuristic algorithm gives good solutions within a short computation time by experimental result.

  • PDF

준비시간(準備時間)이 종속인 다단계(多段階) 생산(生産) 시스템의 집단일정계획(集団日程計劃) (Group Scheduling Problem in Multi - Stage Manufacturing Systems with Dependent Setup time)

  • 노인규;남희열
    • 대한산업공학회지
    • /
    • 제12권2호
    • /
    • pp.33-44
    • /
    • 1986
  • This research is concerned with group scheduling problems in multi-stage manufacturing system with dependent setup time. The objective of the research is to develop and evaluate a heuristic algorithm for determining group sequence and job sequence within each group to minimize total tardiness in multi-stage manufacturing systems with sequence dependent group setup time. The group scheduling heuristic algorithm is developed and evaluated by comparisons with twenty-seven problems with the known optimum solutions and 144,000 random schedules of a large variety problems. The results indicate that the proposed heuristic algorithm gets the same optimum solutions for the problems and also provides the good solutions in comparison with the random schedules of the large variety problems. A numerical example is given to illustrate the heuristic algorithm.

  • PDF

대단위 부품-기계 군집 문제를 위한 Look-ahead 휴리스틱 알고리듬 (A Look-ahead Heuristic Algorithm for Large-scale Part-Machine Grouping Problems)

  • 백종관;백준걸;김창욱
    • 한국경영과학회지
    • /
    • 제30권3호
    • /
    • pp.41-54
    • /
    • 2005
  • In this paper, we consider a multi-objective machine cell formation problem. This problem Is characterized as determining part route families and machine cells such that total sum of inter-ceil part movements and maximum machine workload imbalance are simultaneously minimized. Together with the objective function, alternative part routes and the machine sequences of part routes are considered In grouping Part route families. Due to the complexity of the problem, a two-phase heuristic algorithm is proposed. And we developed an n-stage look-ahead heuristic algorithm that generalizes the roll-out algorithm. Computational experiments were conducted to verify the performance of the algorithm.

Probabilistic Model for Performance Analysis of a Heuristic with Multi-byte Suffix Matching

  • Choi, Yoon-Ho
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제7권4호
    • /
    • pp.711-725
    • /
    • 2013
  • A heuristic with multi-byte suffix matching plays an important role in real pattern matching algorithms. By skipping many characters at a time in the process of comparing a given pattern with the text, the pattern matching algorithm based on a heuristic with multi-byte suffix matching shows a faster average search time than algorithms based on deterministic finite automata. Based on various experimental results and simulations, the previous works show that the pattern matching algorithms with multi-byte suffix matching performs well. However, there have been limited studies on the mathematical model for analyzing the performance in a standard manner. In this paper, we propose a new probabilistic model, which evaluates the performance of a heuristic with multi-byte suffix matching in an average-case search. When the theoretical analysis results and experimental results were compared, the proposed probabilistic model was found to be sufficient for evaluating the performance of a heuristic with suffix matching in the real pattern matching algorithms.

종속적(從屬的)인 준비시간을 갖는 다단계공정(多段階工程)에서의 그룹스케듈링 해법(解法) (Multi-Stage Group Scheduling with Dependent Setup Time)

  • 송영우;노인규;김만식
    • 대한산업공학회지
    • /
    • 제11권2호
    • /
    • pp.75-85
    • /
    • 1985
  • The application of GT results in the mass production effect to multi-product, small lot-sized production. Group scheduling, which is operations scheduling based on the GT concept, is analyzed in a multistage manufacturing system. But the research has been limited in independent setup time models. A heuristic algorithm has been developed to minimize the mean flow time when setup times are dependent to sequence of group in multistage. For evaluation of the heuristic algorithm, the solution of heuristic algorithm is compared with that of random scheduling. The result of comparison indicates that the proposed heuristic algorithm provides good solutions with relatively fewer computational effort.

  • PDF