Predicting the success of CDM Registration for Hydropower Projects using Logistic Regression and CART (로그 회귀분석 및 CART를 활용한 수력사업의 CDM 승인여부 예측 모델에 관한 연구)

  • Park, Jong-Ho;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.65-76
    • /
    • 2015
  • The Clean Development Mechanism (CDM) is the multi-lateral 'cap and trade' system endorsed by the Kyoto Protocol. CDM allows developed (Annex I) countries to buy CER credits from New and Renewable (NE) projects of non-Annex countries, to meet their carbon reduction requirements. This in effect subsidizes and promotes NE projects in developing countries, ultimately reducing global greenhouse gases (GHG). To be registered as a CDM project, the project must prove 'additionality,' which depends on numerous factors including the adopted technology, baseline methodology, emission reductions, and the project's internal rate of return. This makes it difficult to determine ex ante a project's acceptance as a CDM approved project, and entails sunk costs and even project cancellation to its project stakeholders. Focusing on hydro power projects and employing UNFCCC public data, this research developed a prediction model using logistic regression and CART to determine the likelihood of approval as a CDM project. The AUC for the logistic regression and CART model was 0.7674 and 0.7231 respectively, which proves the model's prediction accuracy. More importantly, results indicate that the emission reduction amount, MW per hour, investment/Emission as crucial variables, whereas the baseline methodology and technology types were insignificant. This demonstrates that at least for hydro power projects, the specific technology is not as important as the amount of emission reductions and relatively small scale projects and investment to carbon reduction ratios.

Research in information & communication technology for water in the four major rivers restoration project (4대강 사업에서 수자원 정보통신기술 발전방향연구)

  • Seo, Gang-Do;Jang, Sang-Bok;Lee, Dong-Hoon;Hwang, Jae-moon;Park, Byung-Don
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.10a
    • /
    • pp.184-187
    • /
    • 2013
  • The Four Major Rivers Restoration Project of is the multi-purpose green growth project in South Korea. Some of the project was progressed by K-water and was declared complete on October 21, 2011. The Four Rivers Restoration Project of Korea was designed to be a packaged project that aims to resolve water-related problems such as floods and droughts and revitalize Korean public spaces near the water. K-water have applied the latest ICT(Information and Communication Technology) for the operating management of 4 Rivers Project facilities. We also have applied ICT for integrating drinking water production facilities. Applying these ICT, we have many experience for integrated water resources management, so we proposed. The first is that the big data collected should be analyzed for making decisions and taking actions while considering multiple viewpoints of how water should be managed. The second is that the new MMI(Man Machine Interface) program should be developed to use domestic needs and promote ease of maintenance for the integrated operation. The third is that the standardization of communication protocol is needed for seamless communication between equipments.

  • PDF

Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects (IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 -)

  • Yoo, Seungeun;Kim, Taewan;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design-build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in the contractual aspect but also the work implementation method aspect. However, most research projects in Korea have focused on the contractual aspect of IPD for asserting that the characteristics are the critical matter. The Korean institutional and legal system does not permit the multi-party agreement; therefore, it is difficult to adopt IPD in Korea's construction industry. The researchers do not wait the system to be changed, but we do identify the possibility of adopting IPD in Korea in the perspective of work implementation method, except the contractual characteristics. Thus, the goal of this research is to identify one project that does not include IPD agreement but utilizes other IPD characteristics whose contractual results have similar performance to those that utilize all characteristics of IPD including agreement. This research is expected to enhance performance of the construction project in a Korean construction environment by embracing IPD characteristics as overcoming limits and bounds of the traditional delivery method.

A Study on the Changes in Residential Environments after Residential Environments Improvement Projects (주거환경개선사업이후 주거 환경 변화에 관한 연구 - 대구광역시 주거환경개선사업의 물리적 환경 분석을 중심으로 -)

  • Kim, Young-Hwa;Lee, Sang-Hong
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.10
    • /
    • pp.3-12
    • /
    • 2018
  • This research aims at analyzing the changes in residential environment after a residential environment improvement project focusing on the analysis into the physical environment of a residential environment improvement project, and examining in what direction the changes by residents' own efforts occurred after public support, such as infrastructure. The present residence development method has become different from the previous pulling down method and is focused on regeneration. By examining in what direction the target residence is being changed because of the development by residents' own efforts after the government's public investment at this time, this study also aims at investigating the direction to develop a guideline for residential improvement for later improvement of deteriorated residence. As for the contents of the analysis, changes in public support, such as infrastructure, and other areas after the residential environment improvement project were compared and analyzed from the land use, street system, and condition of buildings before the residential environment improvement project through field survey, geographic information system(GIS), registered land and building data and so on. The biggest change since the support from the government was that at the beginning of the project, the application of special provision of building laws and different financial supports led to lots of newly built buildings. Since then, their number has decreased rapidly, and in most cases, there have been some changes in part, such as changes in the use of land or repair of disposal tanks. Most newly built buildings were multi-household houses, and it has caused road capacity and parking lot capacity, etc., to be exceeded, which has worsened the pleasantness of the living environment. In addition, other problems have also appeared, for example, the lack of residence supporting facilities yet with a higher level of residential density. Regarding the changes in the residential environment after the residential environment improvement project, maintenance of houses were conducted in some degree as diverse alleviation policies to improve poor residence, yet the absence of the guideline for the direction of developing the whole district has made the residence environment more dense and deteriorated. To solve these problems, in advance to a residential improvement project, specific management methods based on short-, mid- and long-term plans for the direction of development by residents' own efforts and a sustainable guideline seem to be necessary.

Priority of Residential Choice and Housing Satisfaction among Studio-type Multi-family Housing Dwellers in the City of Gwangju (원룸형 다가구주택 거주자의 주거선택 중요도와 주거만족도 - 광주광역시를 중심으로 -)

  • Kang, Hi-Goo;Kim, Mi-Hee
    • Journal of the Korean housing association
    • /
    • v.21 no.3
    • /
    • pp.11-21
    • /
    • 2010
  • The purpose of this study is to gather baseline data on perceived priority of residential choice and housing satisfaction rates among consumers with the aim of using this information for future planning. Self-administered questionnaires were provided to 196 studio-type multi-family housing dwellers in the City of Gwangju from 2009 Apri 5th to 29th. The collected data was used to conduct comparative and descriptive statistical analysis: factor analysis, t-test, one-way ANOVA, correlation analysis. The main findings obtained are as follows: Firstly, in relation to perceived priority of residential choice, dwellers identified seven factors as important. Secondly, in terms of housing satisfaction about a unit room, the respondents identified five factors as important. This study confirmed that there existed passive correlation between priority of residential choice and housing satisfaction among residents in studio-type multi-family housings in Gwangju. It is very necessary to project a studio-type multi-family housing close to transportation for easy access, avoiding commercial districts. Delicate interior and design will attract more female residents as well as fully-equipped parking lots for people who drive to their workplace. According to research on a degree of housing satisfaction, all respondents expressed dissatisfaction with "noise". Therefore, in dealing with construction plans of studio apartment units, from now on, sound proofing facilities are required to reduce the acoustic invasion of privacy, especially, for units with more than two people. In order to satisfy all the demand of residents in studio apartment units, we have to pursue systematic and succeeding research about a studio-type multi-family housing well-fitted for the actual circumstances of local area and suitable for longer stay. To sum up, more research and development will be required for high-class studio-type multiplex housing for sale in dealing with households with financial stability such as two-paycheck couples, so-called DINK, or a professional single person, in the future.

A Study of Multi-channel AFS for Marine Traffic Facilities (해양교통시설물용 다채널 AFS에 관한 연구)

  • Kim, Ji-Yoon;Lee, Ji-Young;Oh, Jin-Seok
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.1
    • /
    • pp.75-80
    • /
    • 2015
  • After some period of time, the marine traffic facilities find problems caused by shellfish adhered to inside and inlet of the water column. Therefore, single-channel AFS(Anti-Fouling System) has been applied in order to minimize the deposition of shellfish. However, imbalance phenomenon of ionization of copper electrodes that are used for single-channel AFS appeared. This problem resulted in frequent replacement of anode. In this paper, multi-channel current control system has been developed, as well as the related hardware has been designed and fabricated. Further, experimental study has been undertaken to compare the application of single and multi- channel AFS. Through the sea experiments, it was possible to confirm that the copper electrode used for multi-channel AFS is uniformly ionized.

Formalization of Productivity Metrics for Equipment in Multi-sectioned Road Construction Projects (다(多)공구 도로 공사 현장 장비들의 운영 실태 파악을 위한 생산성 지표 정립에 관한 연구)

  • Kim, Hong-Yeul;Koo, Bon-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.100-109
    • /
    • 2012
  • Large road construction projects are typically partitioned into sections that are then contracted individually to contractors. Each section requires using similar heavy equipment including excavators, dump trucks and pavers, which constitute the highest cost. Normally the equipment is not shared between them, as each contractor wishes to have their equipment readily available. However, such practices result in very low utilization of these equipment. The goal of this research is to develop a programmatic resource sharing system in which contractors can share equipment depending on the changing needs of a multi-sectioned road project. This paper introduces the results of a survey performed to investigate how contractors currently manage the supply and demand of equipment and the equipment that are practical for sharing across a project. More importantly, the paper describes a set of metrics (DPR, nDPR, SDI) needed to quantify the amount of supply/demand variance occurring in each section. The metrics were used on an actual road construction project, and the results show that each section suffers from an imbalance between its monthly planned and actual utilization of equipment. The results also indicate that the sharing of the equipment can lead to potentially large savings as equipment requirements can be met within a project as to short leasing from outside vendors.

A Study on the Block Structure of the Land Readjustment Project Districts Focused on the case study of Cheongju City in the 1970's (토지구획정리사업지구의 가구(街區)체계에 관한 연구 -1970년대 청주시 사례를 중심으로-)

  • Kim, Mi Yeon;Oh, Deog-Seong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.4
    • /
    • pp.551-563
    • /
    • 2019
  • This study examined the characteristics of a district through the concept of a block system in the physical aspect of the four land readjustment project districts of Cheongju City in the 1970s. The results of this study are as follows. First, the local road system for accessing the main road network and blocks was well established compared with the current urban development standards. On the other hand, since the access roads to the individual lots in the block were not equipped properly, it was difficult to improve a house. Second, according to the characteristics of the block, the Aspect Ratio of blocks was 1: 2 on average and most of those directions was east-west. The area of block from the 1st to 3rd districts was increasing, but districts 4 were decreasing. This also was changed to the shape of a contemporary block system. The larger the size of the block area, the lower the Jeobdoyul. Third, in terms of the characteristics of the lot array, blocks with a multi-row system of $4{\times}4$ or more were lots up to the 1st to 3rd district, but 4th district was improved greatly. Because blocks close a square shape have become excessively poor with Jeobdoyul, it was judged that it is difficult to improve the residential environment. Moreover, as the type of the residential development by the land readjustment project is standardized considerably and this type of land area is extensive, it can be an alternative to control the urban sprawl of suburbs if it finds the way to improve this type of the residential area considering this characteristic.

A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.

Study to Suggest Improvement Method for Increasing Efficiency of Multi-complex Design Work (복합단지 설계 업무의 효율성 향상을 위한 개선방안 연구)

  • Koo, Ja Kyung;Park, Eun Soo;Jun, Young Joon;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4D
    • /
    • pp.505-512
    • /
    • 2008
  • Over the past years, complex project which has the object to accomplish housing complex, commercial complex etc, recently is changing to multi-complex projects because of development in IT sector. Improvement in the quality of life, life pattern has been and is being changed, these modernized and improved version of life brings the concept of U-city. Department of urban planning and engineering, civil engineering and architecture engineering in every university educate students according to the changing world in order to handle these complex projects in real world. In most cases department of urban planning and engineering teach project planning and department of civil and architecture engineering teach project design and construction. In most of the projects planning followed by design and construction need to be accomplished, but current observation in the present curriculum shows that it is difficult to expect the continuity. The present curriculum of civil engineering has to change as complex projects deal with various different structures during the design and construction phase of these projects. This study examined curriculums from the department of urban and civil engineering related to structural design and construction and survey importance of design works which overlap urban and civil engineering targeted on design engineers. After understanding design works and results obtained from survey we propose for an advanced efficiency method.