• Title/Summary/Keyword: multi project

Search Result 766, Processing Time 0.026 seconds

Selecting optimized concrete structure by Analytic Hierarchy Process (AHP)

  • Ebrahimi, Morteza;Hedayat, Amir Ahmad;Fakhrabadi, Hamed
    • Computers and Concrete
    • /
    • v.22 no.3
    • /
    • pp.327-336
    • /
    • 2018
  • Increase in population and its daily increasing in our today society results in an increase in housing demand while traditional methods are not applicable. The project preparation and realization processes, based on theoretical and empirical studies, a creation of goods, services, and technologies, are the most important human activities. Selection of effective technological systems in construction is a complex multi-criteria decision-making task. Many decision-makers refuse innovations once faced with similar difficulties. Therefore, using modern materials and methods in this industry is necessary. Modern methods increase quality and construction speed in addition to decrease energy consumption and costs. One of the problems in the way of any project is selecting construction system compatible with the project needs and characteristics. In the present research, different concrete structures such as common reinforced concrete (RC) structure, prefabricated, Insulating Concrete Formwork (ICF), 3D Panel and Tunnel Concrete Formwork (TCF) for buildings with limited floors in Iran are studied and compared from the viewpoint of different criteria like cost, time, applicability and technical characteristics with industrialization approach. Therefore, some questionnaires filled out by construction industry experts in order to compare criteria and sub-criteria in addition to evaluation of optimized structural systems. Then, results of the questionnaires ranked by Analytic Hierarchy Process (AHP) and the most effective alternative selected. The AHP results show that 3D Panel system 36.5%, ICF 21.7%, TCF 19.03%, prefabricated system 13.3% and common RC system 9.3% are the most and the least efficient systems respectively.

Improved Link System of Schedule and 3D Object for Visualizing Effective 4D Model on Plant Project (플랜트 4D의 효율적 공정연계체계를 위한 일정 및 도면의 개선된 연계방법론 구축)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Park, Seo-Young;Yoon, Sun-Mi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.559-562
    • /
    • 2006
  • Existing 4D systems are using the 1:1 link system that directly links a schedule and a 3D model object. But considering that plant facility includes various kinds of schedule and 3D model object, this study suggests an improved link methodology of multi-selected objects and two-way link system for minimizing link errors which generated in case of multi-selected objects. For the link system, this study introduces a new concept called as interface board. Interface board can be used as an information center for representing all information of link items in the current project. It may be expected that 4D model can build an effective and rapid link system of plant project by this new approach.

  • PDF

Design of cellular, satellite, and integrated systems for 5G and beyond

  • Kim, Junhyeong;Casati, Guido;Cassiau, Nicolas;Pietrabissa, Antonio;Giuseppi, Alessandro;Yan, Dong;Strinati, Emilio Calvanese;Thary, Marjorie;He, Danping;Guan, Ke;Chung, Heesang;Kim, Ilgyu
    • ETRI Journal
    • /
    • v.42 no.5
    • /
    • pp.669-685
    • /
    • 2020
  • 5G AgiLe and fLexible integration of SaTellite And cellulaR (5G-ALLSTAR) is a Korea-Europe (KR-EU) collaborative project for developing multi-connectivity (MC) technologies that integrate cellular and satellite networks to provide seamless, reliable, and ubiquitous broadband communication services and improve service continuity for 5G and beyond. The main scope of this project entails the prototype development of a millimeter-wave 5G New Radio (NR)-based cellular system, an investigation of the feasibility of an NR-based satellite system and its integration with cellular systems, and a study of spectrum sharing and interference management techniques for MC. This article reviews recent research activities and presents preliminary results and a plan for the proof of concept (PoC) of three representative use cases (UCs) and one joint KR-EU UC. The feasibility of each UC and superiority of the developed technologies will be validated with key performance indicators using corresponding PoC platforms. The final achievements of the project are expected to eventually contribute to the technical evolution of 5G, which will pave the road for next-generation communications.

Improvement of Small-size Multi-housing Area Reconstruction Project Using AHP Analysis (AHP분석을 통한 가로주택정비사업의 개선방안)

  • Kim, Suk-Joon;Lee, Sang-Ho;Huh, Young-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.79-85
    • /
    • 2019
  • The policy introduced recently in order to promote small-size reconstruction housing projects for rehabilitating downtown area consists of aged multi houses has been little practiced, as preferential provisions for such projects are more likely applicable for large projects. Several expert interviews and surveys were conducted to find efficient clauses to overcome the problems and their relative weights. As the results, it is revealed that 'relation of floor area ratio' and 'relaxation of building height limit criteria' are the most effective whereas 'purchasing and operating of residents' common facilities with public fund' is little. The study results would be a great interests for public institutions to rebuild aged housing area without destroying local communities and to provide socially disadvantaged class with rental housing at the same time.

Status of Policy Implementation and Review of Institution on Multi-functionalization of School Facilities (학교시설 복합화 제도 검토 및 정책 현황)

  • Byun, Kyeong-hwa
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.22 no.3
    • /
    • pp.1-13
    • /
    • 2023
  • This study aims to analyze related laws and institutions and identify research trends and the policy implementation status of the multifunctionalization of school facilities. Beginning in 2001 at Seoul Geumho Elementary School, the enactment of the "Act On The Establishment, Operation And Management Of Multifunction School Facilities" in 2020, was elucidated through the concept and spectrum of the multifunctionalization of school facilities. The relevant research mainly focuses on elementary schools, elderly facilities, and space planning. The Living SOC Project in 2019 acted as a trigger in promoting the multifunctionalization of school facilities as a central government policy. In 2023, the Ministry of Education announced measures and guidelines for establishing the multifunctionalization of school facilities by conducting the project with respect to the "Nulbum School" policy.

A Research on the Reconstruction Project for the Main Gate Area of the U University Campus (대학 정문 진입부 재구성을 통한 캠퍼스 환경개선에 관한 연구 -경남 소재 U대학의 주차 및 복합시설 구성을 중심으로-)

  • Lee, Kwang-Hee
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.10 no.1
    • /
    • pp.1-9
    • /
    • 2011
  • In order to solve the current shortage of parking spaces, and redesign the main gate area of the U University, the research investigated some cases of other schools located in Seoul which actively constructed multi-purpose building structures. Those schools are considered to be good samples showing their efforts to fulfill the needs of more parking spaces in their campuses, and to cover with the growing needs of multi-functioned facilities accommodating services of academic affairs, reading room spaces, and amenities. With the investigation, the research finded out the current trends of campus developments from the sample schools, such as underground parking facilities connected with multi-purpose buildings along the main arteries of campuses. Following the trends the research thoroughly examined the present conditions of our school and tried to make some possible alternatives for the facilities. Under the conditions, the research suggested 1)to construct underground parking lots accepting around 1,000 cars under the ivory tower square located in front of University Administration Building, 2)to develop a big-scaled open square at the university main gate, and 3)to build a multi-purpose structure along the main street of the campus, which included administration services, studying spaces, and some commercial facilities.

A multi-attribute index for evaluating of national nuclear R&D prniects in Korea: multi-attribute utility analysis (다속성 효용분석을 이용한 원자력연구개발과제 사후평가지표 개발)

  • 곽승준;유승훈;김찬준
    • Journal of Korea Technology Innovation Society
    • /
    • v.5 no.1
    • /
    • pp.90-109
    • /
    • 2002
  • The national nuclear R&D projects have been implemented for the purpose of supply of nuclear power which was proved to be safety and stability. Evaluating the national nuclear R&D projects has critical importance in nu-clear energy management aspect. This paper employs multi-attribute utility analysis as a basis for obtaining an evaluation index to assess the national nuclear R&D projects using a specific case study of Korea. To structure and quantify basic values for the evaluation, we elicited important attributes, then refined and structured them into a hierarchy. A multi-attribute index is constructed as a multi-attribute utility function, based on value judgments provided by a group of technical experts, policy makers, and faculties. As a result, the objective of attainment of a proposed object is given the highest priority, followed by appropriateness of project and research strategy, utilization of research output, within attribute ranges defined for the attributes. We found that the work and results of this study can provide valuable insights and decision opportunities for virtually all major decision making in evaluation of the national nuclear R&D projects in Korea.

  • PDF

Seamless Video Switching System for Service Compatible 3DTV Broadcasting

  • Kim, Sangjin;Jeon, Taehyun
    • ETRI Journal
    • /
    • v.38 no.5
    • /
    • pp.847-857
    • /
    • 2016
  • Broadcasting services such as multi/single channel HDTV and 3DTV/2DTV use a multi-channel encoder that changes the bitrate and composition of the video service depending on the time. However, this type of multi-channel encoder could cause a longer latency owing to the variable bitrate and relatively bigger size of the buffers, which results in the same delay as in 3DTV even for a conventional DTV service. On the other hand, systems built based on separate encoders, each of which is optimized for the target service, might not have such latency problems. Nevertheless, there might be a distortion problem in the image and sound at the time of a switchover between two encoders with different output bitrates and group of picture structures. This paper proposes a system that can realize a seamless video service conversion using two different video encoders optimized for each video service. An overall functional description of the video service change control server, which is a main control block for the proposed system, is also provided. The experiment results confirm the seamless switchover and reduced broadcasting latency of DTV services compared with a broadcasting system composed of a multi-channel encoder system.

Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time (프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM))

  • Jang, Seong-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.68-74
    • /
    • 2007
  • Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.

  • PDF

Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities (작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법)

  • Yi Kyoo Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.75-80
    • /
    • 2000
  • In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.

  • PDF